APPROVED: SHD-1325_R1 APPROVED: SHD-1323 (WF 9661) APPROVED: SHD-1330 (WF 9661) APPROVED: SHD-1332 (WF 9661) This shopdrawing has been examined by
Architect Structural Engineer M&E/EDP/DAWTP/Fire Engineer Landscape
L1-CP-20 HW2F L1-CP-07 HW6D L1-CP-26 HW18A L1-CP-31 HW11L OUTSIDE and is returned. Our examination of the drawings do not relieve the Contractor of his responsibilities.
Work shall conform to all Drawings and Specifications. The Contractor is responsible for all correctness
of dimensions and details in these drawings and for the full coordination of all aspects of the work.
2FMD6c P1-P1 HC 2HR 140 0 2FMD2c P1-P1 HC 2HR 160 0 MD1A H1-H1 HC 0HR 140 0 MD4 P1-P1 HC 0HR 160 0 Examined with no objection Examined, observation added. Examined and
Resubmission not required Resubmission required
F: 1100 x 2250 SO: 1150 x 2275 F: 2200 x 2450 SO: 2250 x 2475 F: 1300 x 1100 SO: 1350 x 1150 F: 1150 x 2280 SO: 1200 x 2305 LI Signed: Date:
P: 515 x 515 x 2211 CO: 916 x 2200 P: 1065 x1065 x 2411 CO: 2016 x 2400 P: 1234 x 0 x 1034 CO: 1158 x 1000 P: 1084 x 0 x 2241 CO: 1008 x 2200 INSIDE
LO LO DC LO RO EML,DC 1 1X100X600
- - - - KEY PLAN:
- - - - OUTSIDE
APPROVED: SHD-1330 (WF 9661) APPROVED: SHD-1330 (WF 9661) APPROVED: SHD-1332 (WF 9661)
LO
APPROVED: SHD-1317 (WF 9661) CONC
O URSE
L1-CP-23 HW18A APPROVED: SHD-1316_R1 L1-CP-25 HW18A L1-CP-03 HW11D L1-CP-29 HW11L
L1-CP-01 HW11D INSIDE
MD1A H1-H1 HC 0HR 140 0 MD1A H1-H1 HC 0HR 140 0 1FMD1a P1-P1 HC 1HR 160 0 MD4 P1-P1 HC 0HR 160 0
F: 1300 x 1100 SO: 1350 x 1150 1FMD1 P1-P1 HC 1HR 160 0 F: 1300 x 1100 SO: 1350 x 1150 F: 1150 x 2050 SO: 1200 x 2075 F: 1150 x 2280 SO: 1200 x 2305
P: 1234 x 0 x 1034 CO: 1158 x 1000 F: 1150 x 2250 SO: 1200 x 2275 P: 1234 x 0 x 1034 CO: 1158 x 1000 P: 1084 x 0 x 2011 CO: 1008 x 2000 P: 1084 x 0 x 2241 CO: 1008 x 2200
EA
ING AR
LO P: 1084 x 0 x 2211 CO: 1008 x 2200 LO LI 1 1X100X600 LO EML,DC 1 1X100X600 RO OUTSIDE
WEST NODE
PARK
- LI EML,DC - - -
- - - - - INSIDE
-
W1-100 2HR
W3-200
2HR
W1-100
W1-100 2HR
L1-CP-24 HW18A WF1 HR/DR
I
W3-150
RI
W3-200 2HR WF7B
MD1A H1-H1 HC 0HR 140 0 W3-150
INSIDE
F: 1300 x 1100 SO: 1350 x 1150
1
P: 1234 x 0 x 1034 CO: 1158 x 1000 MWN-149-OBA-CS-SHD-1612
RO
OUTSIDE
1
- MWN-149-OBA-CS-SHD-1101
PROJECT TITLE:
10665
- A PROPOSED NATURE-BASED ATTRACTION AT
UPDATED: SHD-1336_R3 MANDAI ALONG MANDAI LAKE ROAD PACKAGE B-
APPROVED: SHD-1336_R2 200
LI BIRD PARK, WEST NODE (MULTI-STOREY CAR PARK,
WF7B WF7B WF7B
INSIDE ARRIVAL CONCOURSE AND ENVIRONMENTAL DECK
L1-CP-36 HW1A W3-300 2HR W1-200 2HR W3-300 2HR
WITH COMMERCIAL AND ANCILLARY FACILITIES),
MD7 P1-P1 HC 0HR 140 0 WF1 WF2 WF1
MANDAI LAKE ROAD (PRIVATE AND PUBLIC),
3200 OUTSIDE WALKING-CYCLING PATH (CONTRACT NO. G-BP-CON.149)
2165
W3-300
F: 900 x 2250 SO: 950 x 2275
A OWNER / DEVELOPER:
P: 834 x 0 x 2211 CO: 758 x 2100 H
MANDAI PARK DEVELOPMENT PTE LTD
LO
WF1
WF1
WF1
WF1
W3-300
LO H DR FP RC SPR L R
W3-300 2HR
FFL 116.900
FFL 116.900 80 Mandai Lake Road
WF7B
WF1
WF7B
WF1
W3-300 2HR
10200
300
FFL 116.900
1 Kallang Junction #03-01
W3-300 2HR
A
L1-CP-14 HW12B Singapore 339263
RO Tel: +65 6737 7544
WF1
WF7B
WF7B
WF1
WF1
WF1
WF1
Email: u07rspsing@rsp.sg
WF1
1
W3-300 2HR
F: 1900 x 2250 SO: 1950 x 2275 INSIDE
W3-300
MWN-149-OBA-CS-SHD-1616
W3-300
LANDSCAPE ARCHITECT:
P: 915 x 915 x 2211 CO: 1716 x 2200
AECOM SINGAPORE PTE LTD
LO EML,DC W3-300 2HR
300 Beach Road #03-00
WF1 WF1 W3-300 2HR WF1 WF1 WF1 WF1 W3-300 2HR WF1
G OUTSIDE The Concourse Singapore 199555
200
200
200
- Tel :+65 6299 2466
W1-200 2HR WF7B
WF1
WF 4 W1-150 2HR WF 4
-
WF4
WF4
W1-100 WF4
W1-100
WF2
WF1
5835 100 Email: Mandai_PagB@aecom.com
W3-200 2HR
S RC S 12
W1-150 2HR
RI
WF4
W1-100
WF4
W3-200 2HR
UPDATED: SHD-1334_R2 CIVIL AND STRUCTURAL ENGINEER:
WF 4
W1-200 2HR
WF1
APPROVED: SHD-1334_R1
W1-100
7000
900 X 2200
WF4
1
WF4
WF 4
WF4
INSIDE
6500
6500
300 Beach Road #03-00
WF2
W1-100 2HR
WF4
- WF2
W1-150 2HR
+1480 +3755
L1-CP-33 HW9F WF4
The Concourse Singapore 199555
W1-200 2HR
FFL 116.800 -
M PS R M
W3-200 2HR
WF2
NOTE:
W1-200
W1-100 2HR
Tel :+65 6299 2466
3400
WF4
MD5a P1-P1 HC 0HR 160 0 W1-100
M FF C A - ACTIVE LEAF Fax: +65 6299 0297
WF7B
WF2
WF3 W1-100
WF3
W1-100
Email: Mandai_PagB@aecom.com
WF7B
WF4 W1-100
WF 4
300
W1-100
WF4
W1-100
WF4
W1-100
WF4 W1-100 WF4 M C W R SH P F MECHANICAL & ELECTRICAL ENGINEER:
P: 934 x 0 x 2211 CO: 858 x 2200 6740 100 FFL 116.900 WF2 W1-150
SURBANA JURONG CONSULTANTS PTE LTD
WF4 W1-100
W1-200
RO L C RS WF2
WF4
WF4
WF4
W1-100
51 200
WF4
SURBANA
WF7B
WF 4
FFL 116.900
R4 WF4
W1-100
1400 200 4203 150 2647
- JURONG
WF2
WF2
WF4 W1-100
WF4
WF2
B R CH R R
W1-200 2HR
WF4
6050
-
WF4
W1-150
W1-100
WH FF C
W1-150 2HR
Singapore 150168
WF2 W1-200
WF4
FFL 116.900
8800
8800
WF2
WF2
Tel: +65 6248 1288 Fax: +65 6273 9090
WF4
WF4
WF4
WF4
WF4 W1-100
WF2
Email: N1527@surbanajurong.com
W1-100
WF4
W1-150 2HR
F M L 4 WF2 W1-200 2HR
W1-200 2HR WF2 WF2
INTERNAL EDP:
W1-200 2HR
FONG CONSULT PTE LTD
WF4 W1-100
WF 4
WF4
200
FFL 116.900 WF3D WF3D WF3D MD/4 L1-CP-30 7 Keppel Road, #02-27
WF4
1050 X 2200
WF3D
6000 S.O.W Tanjong Pagar Complex
WF2
S.O.W
1200 X 2275
WF 4
2HR
WF4
WF1 WF1
2RS/1a L1-CP-44 +1480 +3755
W1-150 WF4 WF4 W1-200 W1-200 WF4 WF4 W1-200 2500 X 5000 - Tel: +65 6748 4668
Fax:+65 6748 3119
Email: fc16055_edp@fongintl.com
FIRE ENGINEER:
APPROVED: SHD-1320 (WF 9661) APPROVED: SHD-1331 (WF 9661) APPROVED: SHD-1332 (WF 9661) APPROVED: SHD-1332 (WF 9661) IGNESIS CONSULTANTS PTE LTD
L1-CP-13 HW12B L1-CP-27 HW5C L1-CP-32 HW11L L1-CP-30 HW11L 33 Ubi Ave 3, Vertex Tower B,
#07-01 Singapore 408868
2FMD2 P1-P1 HC 2HR 160 0 MD2 H1-H1 HC 0HR 160 0 MD4 P1-P1 HC 0HR 160 0 MD4 P1-P1 HC 0HR 160 0
IGNESIS Tel: +65 6293 5431
Fax: +65 6509 3676
F: 1900 x 2250 SO: 1950 x 2275 F: 1000 x 2250 SO: 1050 x 2275 F: 1150 x 2280 SO: 1200 x 2305 F: 1150 x 2280 SO: 1200 x 2305 Email: mrsp@ignesisconsultants.com
DAWTP:
P: 915 x 915 x 2211 CO: 1716 x 2200 P: 934 x 0 x 2211 CO: 858 x 2200 P: 1084 x 0 x 2241 CO: 1008 x 2200 P: 1084 x 0 x 2241 CO: 1008 x 2200
BLACK & VEATCH (SEA) PTE LTD
EML,DC 1 1X100X600 EML,DC 1 1X100X600 EML,DC 1 1X100X600 491B River Valley Road
LO RI LO LO
#06-01 Valley Point,
- - - - Singapore 248373
Tel: +65 6738 4022
- - - - Website: www.bv.com
MAIN CONTRACTOR:
OBAYASHI SINGAPORE PRIVATE LIMITED
79 Anson Road #13-01
CLIENT DOOR NO. Singapore 079906
FRAME FINISH AND Level 1 - Part 1 - B Tel: +65 6220 3122
1 Fax: +65 6224 8425
COLOR/TYPE CODE DOOR TAG LEGEND: NOTES: DOOR KEYPLAN OBAYASHI
SINGAPORE Website: www.obayashi.com.sg
FRAME & PANEL FINISHES: 1 : 100 SUB-CONTRACTOR:
L1 - CP - 08 HARDWARE SET TRUSSCO PTE LTD
P1 = SPRAY PAINT FINISH WITH APPROVED COLOR/TYPE CODE 1
CLIENT DOOR TYPE DOOR CORE FIRE FRAME STC AIR NO.33 TUAS BASIN LINK
2FMD2_P1P1 P2 = SPRAY PAINT FINISH WITH APPROVED COLOR/TYPE CODE 2
MATERIAL RATING TYPE TYPE TIGHTNESS SINGAPORE 638768
FRAME WIDTH x HEIGHT STRUCT'OPEN WIDTH x HEIGHT L1 = LAMINATE FINISH WITH APPROVED COLOR/TYPE CODE 1 TEL:62739088 FAX:62734336
PANEL FINISH AND OBAYASHI
L2 = LAMINATE FINISH WITH APPROVED COLOR/TYPE CODE 2 DRAWING TITLE:
COLOR/TYPE CODE
PANEL WIDTH x HEIGHT
LO
EM
CLEAR'OPEN WIDTH x HEIGHT
VISION PANEL VISION PANEL V1 = VENEER FINISH WITH APPROVED COLOR/TYPE CODE 1
NOTES:
VISION PANEL TYPES
FOR CONSTRUCTION MANDAI WEST NODE
DOOR HANDING NO LOCK TYPE WIDTH x HEIGHT 19 JUL 2021 LEVEL-1 PART-1-B
FRAME COLOR CODE PSB LABEL NO:(FRAME) V2 = VENEER FINISH WITH APPROVED COLOR/TYPE CODE 2 VP1 = 6MM THK CLEAR GLASS DATE
DOOR KEYPLAN
11/6/2019 2:21:32 PM
PANEL COLOR CODE PSB LABEL NO:(PANEL) H1 = NON-DIRECTIONAL HAIRLINE FINISH STAINLESS STEEL VP2 = 6MM THK CLEAR FIRE LITE GLASS
DATE This shopdrawing has been fully checked and coordinated.
DRAWING NO.:
MWN-149-OBA-AR-SHD-1272 REV. NO.
DATE DATE DATE
00 FOR APPROVAL 03 EML, DC ADDED FOR L1-CP-01 PER SOI 346. ISSUED FOR CONSTRUCTION. ALTERNATE
04-Nov-2019 24-May-2021 DRAWING NO.: MWN-TC-AR-SHD-0002
-
DATE DATE DATE DATE PROJECT MANAGER
UPDATED KEYPLAN. ISSUED FOR CONSTRUCTION.
01
02
26-Dec-2019
DATE
Door L1-CP-33 revised.
L1-CP-33 SWING REVISED PER RSP'S COMMENT.
04 19-JUL-2021
DATE DATE DATE
SOH ENG HONG
Name / Signature
(PROJECT)
Designation
SCALE: 1 : 100
Issue Date
CHECKED BY: Checker 4
13-Feb-2020
DATE: 04-Nov-19 DRAWN BY: Author
"The review of this shop drawing is for conformity in the design intent and for general arragement only, and the Consultants neither undertakes
nor assumes any responsibility whatsoever for the accuracy and/or adequacy (in any aspect) of the shop drawing. The contractor shall be strictly