You are on page 1of 3
Nee TOA CORPORATION Production Facility For Singer Bangladesh Limited Concord Collosseum (7th Floor) 156, Kemal Ataturk Avenue, Banani Dhaka-1213, Bangladesh Tel: +880-1311001887 DOCUMENT TRANSMITTAL To: Singer Bangladesh Limited / Arcelik Ref. No. SBLP1-TOA-SBL-001 Attn.: Mr. Gokhan Senoglu Date: 02 / JUNE / 2022 Senior Specialist - Workspace Design Production Technologies Directorate ce: Work Categories |&J 01. General & Preliminaries [[] 06. Quality Control 11. Miscellaneous C02. Permits & Licenses (D 07, Material Approval O12. Electrical Work [1 03. Survey / Site Investigation |] 08. Safety & Environmental (C13. As-Built Drawing CJ 04. Soil investigation D089. Report / Record B14. Shop Drawing C1 05. Temporary Work CZ 10. Minutes of Meeting C15. Others(Common) The below-mentioned documents are transmitted herewith for your: Approval C1 Information Your Comments and/or Approval are required not later than: 09 / JUNE / 2022 | No. of | Subject: Ref. Claus Copies: | List of Regular Site Staff and Technical Staff, Rev.0 3 Attachment(s): (Cocumont No. / Document Tite / Drawing Number) Document No.: SBLP1-TOA-GEN-001 Document Title: List of Regular Site Staff and Technical Staff, Rev.0 For and on behalf of TOA Corporation: Prepared by: Checked by: Signature: Project Manager S.M. Zamal J. LLANA Remarks: Description | Submitted for Approval Di Reviewed. Date 2iune 2022 FOR APPROVAL Approved [approved with comment(s) returned with comment(s) others): SINGER BANGLADESH | STRUCTURAL DESIGN LIMITED ASSOCIATES LTD Signature Name Date fiob PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED Singer Project Office me List of Regular Site Staff and Technical Staff sarhins SBLP1-TOA-GEN-001 = 0 iepared checed Roped a g Crh, hone Sawa | SoA SisrUe | eso CpTID Dare} Pune 2022 Dune 2022 | 2une 2022 TOA CORPORATION Project Name: Production Facility for Singer ‘Company Name: TOA CORPORATION ited, Construction of RCC Boundary Wall List of Regular Site Staff and Technical Staff Rev. 02-Jun-2022 No Name Position Nationality Remark 1 _|Bensito A, Castillo Project Manager __| Philippines - 2__|Iftahaz Anwar Chowdury __|Chief Administrator_|Bangladesh 3 [Mirasit Safety Officer Bangladesh 4_|Archie Joseph Liana lAs/CAD Engineer__| Philippines 5__|S.M.Zamal lOc Engineer Bangladesh _| _6_|S.M. Fozla Shamim Chief Surveyor Bangladesh 7_|Abubakor Siddik __|Supervisor Bangladesh 8 _|Rafikul Supervisor [Bangladesh

You might also like