Nee TOA CORPORATION
Production Facility For Singer Bangladesh Limited
Concord Collosseum (7th Floor) 156, Kemal Ataturk Avenue, Banani Dhaka-1213, Bangladesh
Tel: +880-1311001887
DOCUMENT TRANSMITTAL
To: Singer Bangladesh Limited / Arcelik Ref. No. SBLP1-TOA-SBL-001
Attn.: Mr. Gokhan Senoglu Date: 02 / JUNE / 2022
Senior Specialist - Workspace Design
Production Technologies Directorate
ce:
Work Categories
|&J 01. General & Preliminaries [[] 06. Quality Control 11. Miscellaneous
C02. Permits & Licenses (D 07, Material Approval O12. Electrical Work
[1 03. Survey / Site Investigation |] 08. Safety & Environmental (C13. As-Built Drawing
CJ 04. Soil investigation D089. Report / Record B14. Shop Drawing
C1 05. Temporary Work CZ 10. Minutes of Meeting C15. Others(Common)
The below-mentioned documents are transmitted herewith for your: Approval
C1 Information
Your Comments and/or Approval are required not later than: 09 / JUNE / 2022
| No. of | Subject: Ref. Claus
Copies: | List of Regular Site Staff and Technical Staff, Rev.0
3
Attachment(s): (Cocumont No. / Document Tite / Drawing Number)
Document No.: SBLP1-TOA-GEN-001
Document Title: List of Regular Site Staff and Technical Staff, Rev.0
For and on behalf of TOA Corporation: Prepared by: Checked by:
Signature:
Project Manager S.M. Zamal J. LLANA
Remarks:Description
| Submitted for Approval
Di Reviewed.
Date
2iune 2022
FOR APPROVAL
Approved
[approved with comment(s)
returned with comment(s)
others):
SINGER BANGLADESH | STRUCTURAL DESIGN
LIMITED ASSOCIATES LTD
Signature
Name
Date
fiob
PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED
Singer Project Office
me List of Regular Site Staff and Technical Staff
sarhins SBLP1-TOA-GEN-001 = 0
iepared checed Roped
a g Crh,
hone Sawa | SoA SisrUe | eso CpTID
Dare} Pune 2022 Dune 2022 | 2une 2022
TOA CORPORATIONProject Name: Production Facility for Singer
‘Company Name: TOA CORPORATION
ited, Construction of RCC Boundary Wall
List of Regular Site Staff and Technical Staff
Rev.
02-Jun-2022
No Name Position Nationality Remark
1 _|Bensito A, Castillo Project Manager __| Philippines -
2__|Iftahaz Anwar Chowdury __|Chief Administrator_|Bangladesh
3 [Mirasit Safety Officer Bangladesh
4_|Archie Joseph Liana lAs/CAD Engineer__| Philippines
5__|S.M.Zamal lOc Engineer Bangladesh _|
_6_|S.M. Fozla Shamim Chief Surveyor Bangladesh
7_|Abubakor Siddik __|Supervisor Bangladesh
8 _|Rafikul Supervisor [Bangladesh