You are on page 1of 49
4 TOA CORPORATION Production Facility For Singer Bangladesh Limited Concord Collosseum (7th Floor) 158, Kemal Ataturk Avenue, Banani Dhaka-1213, Bangladesh Tel: +880-1311001887 DOCUMENT TRANSMITTAL ‘To: Singer Bangladesh Limited / Arcelik Ref. No. SBLP1-TOA-SBL-005 ‘Attn.: Mr. Gokhan Senoglu Date: 057 JUNE / 2022 Senior Specialist ~ Workspace Design Production Technologies Directorate co: Work Categories: [C1 01. General & Preliminaries [C0 06. Quality Control (2 02. Permits & Licenses | 07. Material Approval [Z.08. Survey /Sit investigation |[ 08. Safety & Environmental D0 O10 11, Miscellaneous 12. Electrical Work 13. As-Built Drawing 44, Shop Drawing 418. Others(Common) 1 04. Soil Investigation Report Record 5) 05. Temporary Work Minutes of Meeting on000 The below-mentioned documents are transmitted herewith for your. Approval 1 Information Your Comments and/or Approval are required not later than: 12. JUNE 12022 Subject | Ref. Clause: Material Proposal for Reinforcing Bar, Rev.0 Attachment(s): (Document No. / Document Tile / Drawing Number) Document No.: SBLP1-TOA-MAT-002 | Document Tite: Material Proposal for Reinforcing Bar, Rev.0 For and on behalf of TOA Corporation: Prepared by: | Checked by: Signature: Ba 4 @ —¥/ Bensito A. Castilio Project Manager 8.M.Zamal JLLANA Remarks: PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED [MAT-002, MATERIAL PROPOSAL FOR REINFORCING BAR, Rev. 0 fev Description Date (0 | Submitted For Approval OS lune 202% FOR APPROVAL [approved Di reviewed [Approved with comment(s) [returned with commentis) Bother: | [SRE DEST TRUCTORAT OEIC umiTeD ASSOCIATES LTD. | Signature Name | Date | l [ee PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED Tile Material Proposal for Reinforcing Bar cole SBLP1-TOA-MAT-002 [= e i epared Checked | ——raroved an | | ame S-M.ZANAL | BENSITO A. CASMILLO | RENSITO A. CASTILLO Date 05 june 2022 05 ne 2022 05 june 9002 TOA CORPORATION Singer Project Office PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED 'MAT-02, MATERIAL PROPOSAL FOR REINFORCING BAR, Rev. 0 1. Purpose ‘The purpose of this document isto propose the Reinforcing Bar to be used for The Project for Production Faclity for Singer Bangladesh Limited for RCC Boundary Wall Material Comparison with Specification item Requirement Proposal Refrence 60 Grade (GPH / BSRM / KSRM) See Appendix: -Company rade GPH Deformed ar Deformed Bar 60 Grade GPH Deformed 83° | rachure and Certificates 1 | GPH84200WR10-gi0mm | PH B4200WR 10-¢10mm ‘elder (neues Mp 60000) | Viltarg = 46 Up (7,008), Test sweet rininan20 MPt9900 pi | Tene reg = 57 MP (2550 9) 2 | GP e420 0WR12-o12mm | GPH 8420 0WR12-012mm See Appendix:2 - Material ‘old svengh rinmunts vp (0093) | ve Sree = 3 Mp (6700p ramus Woo (0.0009 0 in nse sven nino (90005) | Tere Senet = 63 pe (2.00 3 | GPH220 wR 16-o16mm PH 8420 OWR 16 - 16mm Yeldsveth(nimumiasivps (0000 pa) | Weng 57 wa (7,50 58) “Teale sent iini}20 NPao0000 pi) | Tense Seng 86 mPa (0350p 2. APPENDIXES Appendix- 1 - Company Brochure Certificates Appendix: 2— Material Test Report ” h BEBETE << Fon eonronirion PRODUCTION FACILITY FOR SINGER BANGLADESH LIMITED 'MAT.002, MATERIAL PROPOSAL FOR REINFORCING BAR, Rev. 0 Appendix — 1 Company Brochure ( Fencomoniion Re Ie cre) Gop FEARING PLAIN LIVING HIGH THINKING “In the beginning, God created man’ ‘and after a thousand years of intelligence, precision, hard work and innovation, man created steel one of the greatest innovations of all time. Modern life is literally unimaginable without steel, from ‘skyscrapers and planes to syringes and forks, steel is an essential part of our everyday life. GPH ispat Itd. GPH ispat Itd. was incorporated in Bangladesh as a private limited company on May 17, 2006 which was limited by shares under the companies Act, 1994. GPH ispat is one of the leaders of Bangladesh in ‘manufacturing steel, promises a super strong future and economy with its world-class products. GPH ispat Itd. produces not only structural rebat, but also produces MS billets and sections in Bangladesh. GPH ispat is ensuring the highest quality products in Bangladesh complying the national and international standards. Billets are being exported to other countries after meeting the local demand. ‘The main focus of GPH ispat Itd. is to take Bangladesh quite a few steps forward to a stronger and brighter tomorrow. ‘The story of GPH Ispat is not an ordinary one. It all began with 2 vision. A vision for development. Having belief in sustainable development GH ispat_—_ is. continuously working for the development and people's welfare of the country. GPH ispat has established the Asia's first Quantum EAF Technology based factory to enrich the steel sector. in Bangladesh. GPH Ispat is one of the leading manufacturing company in Bangladesh that ensures the best quality of steel complying the national and International standards. GPH Ispat has introduced first in Bangladesh the level 4 Automation in steel manufacturing Industry and ERP-enriched state-of-art technology with fully computerize integrated digital industry known as Industry 4.0. This makes it possible to produce the highest quality products using comparatively less energy. The main purpose of all our efforts are to bring you the world class construction Rebar through advanced technology. We have a big dream, a dream of building a new Bangladesh, and you are the companions in this dream. (ama) CGPH Ispat established a green factory in Bangladesh with the following features to avoid any harm to the environment, GPH green factory has highly sophisticated and advance exhaust gas purification system to keep the environment clean and safe. The amount of carbon and dust emissions from the GPH factory is less than the amount set by the World Bank. Latzest Oxygen Plant of Bangladesh: GPH Ispat’s green factory has the largest Alr Separation plant in Bangladesh having capacity of 300MT/day. The liquid oxygen, nitrogen and argon produced in this plant meet the factory's own {demand and rest are marketed for the use in various hospitals and industrial establishments in the country. 3, Water Treatment Plant with Zero Discharge Technology: Only GPH Ispat factory in Bangladesh has its own water harvesting system and water treatment plant with aero discharge technology, so no water's waste J Teimeropted power sipey. The areurt sf CMMI The amount of natural gas saved in the GPH green factory by establishing Winlink Technology can meet the gas demand of 35,000 households per year. instruction Steel for Earthquake Prone Areas ‘Tectonic framework of Bangladesh and adjoining areas indicate that Bangladesh lies well within an active seismic zone. The after effect of earthquake is more severe in an underdeveloped and a densely populated country like ours than any other developed Er Bangladesh National Building Code (NBC) was first established in 1993 to provide guidelines for design and construction of new structure subject to earthquake ground motions in order to minimize the risk to life forall structures. Bangladesh has divided into eee eee nn ee er a ee are CCR a Categories (SDC) of structures: SDC B, SDC Cand SDC D. Permissible SDC depends on the Seismic Zone, Site Class and Occupancy Category. Based on these three criteria, the allowable SDC is determined. According to Bangladesh National Building Code ene a hee ree co cae RD nae proportioning and detailing requirements are critica in resisting strong earthquake shaking with substantial inelastic behavior. ee Me ene ees een hae eee i ie ene Inelastic response characteristics of these frames in comparison with less stringently detailed Intermediate and Ordinary Pee ee ‘Although earthquakes cannot be prevented but good reinforcing re-bar with proper strain hardening can be used to reduce their eric yt ieee eC ns Cee ec DET u) Tria ery ory CCL em Why GPH B420DWR Is The Best Construction Steel? CNet real 100% refined, Pure & Clean liquid steel produced through Quantum Electric ARC Furnace (QEAF) technology which leads to produce inclusion free GPH Quantum Rebar. Primary refining & cleaning process includes: Deo ecu eee ee ‘temperature of 600°C & above. During this process it remove the dust, rust, moisture, painting, coating, galvanizing & other UN Coe GPH Quantum electric arc furnace removes unnecessary Carbon & Phosphorus by Oxygen Lancing & Argon bottom purging turns the liquid metal mixture into a homogeneous liquid metal mixture, Pure flat bath operation is done by preparing 70 MT HOT HEEL in Quantum Electric arc furnace having holding capacity of 150 MT. Chemical Reaction of Carbon & Oxygen makes Carbon Mono oxide (CO) which creates Foamy Slag 2 removes Carbon, Phosphorus & others impurities. 80 MT, 100% slag free liquid metal is collected One eos eee eu eu eo aco eu Eee GPH Quantum Rebar is much more Seismic Resistance than other rebars in the market due to its 100% refinement. Engineers rely on GPH Quantum Rebar for any Mega Structures. Dees CTU Couey ood Homogenized chemical composition in liquid steel ensured by Argon bottom purging & harmful Phosphorus & other impurities. are removed from the liquid metal by Oxygen fancing in Quantum Electric Arc Furnace. Chemical composition in GPH rebar is ensured by mixing the required ferro-alloys in LRF ‘through automatic alloy addition. So, the homogenized chemical properties are achieved in the rebar resulting uniformity of strength along the rebar and the construction become stronger and safer. Better combination of chemical composition makes GPH Rebar more ductile and use of Tungsten Carbide Roll & notching, grooving through CNC machines ensures the uniform diameter of the rebar, minimum weight tolerances, accurate surface geometry resulting higher relative rib area that makes the construction more secured by increasing fatigue resistance & establishing a strong bond between the concrete and the rebar. Fully automatic computerized Quenching Method ensures a uniform martensite ring in the rebar; that is why there is no strength variations from head to tail. Rebar produced from 100% refined liquid steel, less twisting of rebar during production and automatic quenching system creates a light anti corrosive scale layer on the rebar surface which makes the rebar more corrosion resistant, Combination of proper chemical Composition & uniform structures of ‘tempered martensite, Mixed Bainite and ferrite-pearlite makes the ‘rebar highly bendable. The use of maximum number of finishing stands with tungsten carbide ‘rolls in the rolling process makes the surface of the GPH rebar shiny. For quality control we have fully digital Universal Testing Machine, Universal Hardness Testing Machine, Profilometer, Bend-rebend Testing Machine, X-ray Fluorescence Spectrometer (XRF), Microscope, Impact Testing Machine, Bond testing, Martensite ring checking, Macro Etching and Wet Chemical Lab. Moreover, we have advanced M12 Spectrometer from Germany, [At each stage of production, the state-of-the-art GPH lab is rigorously controlled by these testing machines to maintain the quality of the rebar. » Since every stage of GPH rebar production such as scrap processing and. charging, melting, refining, casting and rolling processes are integrated and uninterrupted and the use of the world class technology ensure balanced chemical properties and uniform strength, superior ductility and bendability that guarantee a strong structure. Results of Actual Dimensions, Rib Geometry, Tension, Bend, Re-Bend and Chemical Composition of Quantum B4Z0DWR Rebar at GPH Ispat Limited Se aan) wo wo | rs 3m a | 460 a at | os 8 2 48 6 Ll [amas assr | rss | ana | oe z » 1233 | 20 | 2 | 24 us | 20 mo [nas [iss | zo |uas fis us | a ve 2 | snes] aasr as | 215, nico | 19 |S, ss] 5 330 ons | 2 | a0 wfous | a ae |as75| am | ao as | os [sor] os [rw] us | 2 Passe] a 26 |sisrs | 2953 | sa0s | 225 oor {200 | ass fon] oe faa] no | a ss x | sous 6230 | 240 | 200 [2570 | one ]3r4 | aes |sai | #0 Jase] 2 | a 2 [ews gs] 4a |sao | 059 zp |e sa ase ssa] as Jew] oe fia] us | 13 a pssst 233 [53 4 safie| u |e aoe a fas azz [23 vo |e] ss fin] os | ae 1:3} uss | 389 | 399 [2508 | oo Jee | sz isa] 678 |150 38 253431 ea1466 | ald (dt 6 162196 5321.38 | _135(ton) 36 1126.36 40 94( ton) = 633.58 53(Lton) CE 5 Bit 405.59 34 (ton) | 4481 25951 85142 22 (L ton) 24 | «86 205.88 678.75 | 16 (1 ton 45kg) 24 | 804 15839 | 51967 _|_14 (1 ton 60k) 4 1257 101.37 _-332.59_|_9(1 ton 65 kg) = 4 1964 64.88 | 212.86 | 6 (1 ton 110k Mechanical Properties of Grade 8420DWR as per BDS 1SO 6935-2:2016: 25> caso) 75170 12 fe 20.058 Results are oblained from fully automatic rebar surface geometry measurement device (Profilometer) ECM Datonsysteme RM-303, Made: Germany Surface Geometry Measurement 160 | 1590) 153 aa ey Chemical composition of product analysis as per international standard (G-60/B420DWR): Crag BDS ISO 6935-2: 2016 | ASTMA7OG/A706M-15 ASTM AG15/A615M-16 Carbon Equivalent Value [BDS 1SO 6935-2: 2016], CEV will be calculated using below equation, a Mn, (Cr+V+Mo) | (Cu+Ni) fad 3 se where C, Mn, Cr, V, Mo, Cu and Ni are the mass fractions, expressed as percentages of the respective Cree cucu Carbon Equivalent Value [ASTM A706/A706M-15], CEV will be calculated using below equation, %Mn, %Cu, Ni, %Cr_ %MoO. %V + es LS ia ae aa 1 a T ( > Meets We Want to Build CS TS ae e Cane Cae uk Cu Cou eu EUG) SRC a Om OCs Rea Re eC Cem ee ene ci ike Cr eee Com anor SCC Uh c oTuC US Cm ee MUR PPR eu UC me RR acs Peet Cuc ks Met SuS CMV Ck cna Rei cccarur cc with you. es eet reer) er eet oe eeereny Caen eetoe) oe eee od ener CO eee Ispat een Deets) Plc nes eee tad peered eee erred eee eerie Te] Se Pere Tei) Seater sty esa eee eee etre ov7ia se1s2 Sree cd can De EOC ae ee ease Pera reeled eee et rors ulna & Barisal Reon: 01313 050923 Loerie) Company Certificate wre Baa fat wetter, OTT arava frsint (SHHI-O) i, ma QUE 3. Be DYARd mRoTA Spa frat SS agate tae oes pe say rei — Be ET No: 03-066046 pita srrera (Fi wer) SIA Joona Mra yB-aR are FASTA AEE tthe we a Tah 008 a8 & Ae STOR STUN cor, aera ae Aferafan Sera wealers wa area ATT Fy ars anfe/afeinra oR a Ge veorH Dy Sa KAT | ae sTMTOTA CM BARR @ TH Spee AAT ots Te sree: MT at 2 81 @ we a Carm @ B-caRe (H AIC) 5 ern) : bi ea et pi snr ea waPRT 2003 4a TTS AR sor Ge artery war fe (ates) Bren ese) Be 2 =r iva go1 matard a (ate) 3 Dra (aCe) = + cm) aero Ort 321 RIES OMI 2 wav 0 G-ovs OSs | bene ta Fred aCe Hee AHR TAT Fa AH NT pO ga ATTEN STAT HT SCNT fe.Fiora, Fat a ero 2A)2 _, Ae Se pap | A caren afebrera Ra ce SelIP wae 9 fase rae cqromm Fret cererye mt Bead aay (omg sae ah) cane mney DTT CRETT Scanned by CamScanner a {The City Corporation (Taxation) Rules 1986 #3 42-48 fafierrs} (car ren eras ee EET CF Ce FAT a Ge TR ANTHEA ATE, eTaTTATT Feat safer ay Fee TST BACAR MAPS ATT | (2) 8 Go arRor aa aR fafies rors aeN, TEIN, STSIBATTG, sIITTG aT Hats co aR scars wa Gs RC ee a AT, Fea TRO ened ATS Heat CHR eg aE SATA IMS GE RCA eACATET LAI AT | (1) GPR wey mrs ER aT TERST TM CT HCH HTH AT ROMA AHH FAN LS | (Ror re Gere ARE ae TAA ER fees Re Tene MAB Fa ferSTA SeACATAT fee ART F's 30% RICH ARCATA FR era fw BLA (8) Fores sxqenren Sw a Gs eco aes HM HHH eS, ree aT AAPM eT AA (©) aPReoprers Freer at seraIcara "ef, COTA ere remit ora IMTS aT aT ae RTH si peor rat aera) arate GC GI THA aT eafSbTC AMT] Are APE PACS AAA AT (aor ares sr fees cord eThene ofaorAT FACS ATS AT (@) ARORA ae aren aeons Borie Aares TACT, TOS Fea ETS SoS HN cx TA AT fre creer Craw AT (a) ROPE atten ote Fear a eam coer CremrETS Fredy ara GLA Vea GRA eaParny ga GE mR enftea Srey fae a sla wa FET SICA AACS RA | (a) Ge aaorne, sees OF Ca tere ATHTS TAT AT | (Go cornea entoen eraeery wet ata TET afin] arora webref Frcs Bre ATE ATS FE “ge enter Fi, akan wa Forte ores MATCH CTPA ATE Pts, eTA= 3 ATA AT CA | RT G2 CHUM CT ZA OFA AIM AAT 3 BATE RCS 90 CASTE TAT BATS aacam GFE ATTA ATO eT eT IEA | @) arene Rc apa aH ale ACA AT RCM IA SASS, TOMO a AOA SAT FACS ATA | SAT terra wercieamtead eat ACAI ATT RCT (8) Gs arte san arte carn af atfrbra rat Bae GHB eee carer area ore FCT ST Peace aia ara (FAB wea) STA ook ae er SPATE NaS) HIATT AA ATEN ST rea a | (6) Bere cu care wore TEN GTS ARC aS ACH AT RTA | Regs. cratgis Sfeqd ar a a Bae a TH.0 (rg sii PS aren am Scanned by CamScanner so 1 Brora fare e/a fie 31 Sara erry 8 eR aR A Scanned by CamScanner Government of the People’s Republic of Bangladesh National Board of Revenue Taxpayer's Identification Number (TIN) Certificate TIN : 875829530252 ‘This is to Cenily that GPH ISPAT LIMITED is a ReuistereteTaxdayer of National Board of Revenue under the Jurisdiction of Taxes Circie.002 (Company) Taxes Zone 01, ‘Taxpayer's Particulars : f 1)Name : GPH ISPAT LIMITED 2 Regt Assay A a 4 3) Curent Address : Crown Chambery «Previn TIN 306200713 ee oe Date : November 14, 2013 : Please Note: Government of the People's Republic of Bangladesh National Board of Revenue Mushak-23 Customs, Excise and VAT Commissionerate, Chittagong Khagrachari Division Value Added Tax Registration Certificate This is to certify that the person whose details are given below isregistered under Value Added Tax and Suplementary Duty Act, 2012 (Act No. 47 of 2012) BIN: 000041042-0508 Name of the Entity. #GPH ISPAT LIMITED. Trading Brand Name 2GPH Ispat ld BIN 124241012302 enn 3875829530252 Address :Mosjiddah, Kumira, Sitakunda, Chattogram; Sitakunda PS; Chittagong-4314; Bangladesh Issue Date :16/10/2019 Effective Date 126/09/2006 Type of Ownership : Public Limited Major Area of Economic Activity ?Manufacturing, Imports, Exports Thisisasystem generated certificate and doesn’ require any signature FRAO 08 2000.00 0.03.0" JD SDS TRS: 98.08 20208 at eat Sires Pe TS rea Faw mT mR: FH-aDeW/E-SY/EBNA-RORO HAAN LET | 2 fern acerTE, eof Fence eg ce, ea ee cena fcaecs wreeTa ROS, AT Tea 6 7RIEE meres aR equ she Gites a sireete Sevts/eTTEMEZS Steel for the reinforcement of concrete (Ribbed Bars) cra eee Feantet raw mIRC R.A abetr, CHT 03/04/2030 BH REET so/od/aore EI ES eT TE BENE VES SENATE | ‘afte fram aon war GTAP senha ag TIA FCoE ecw aT Fo ago fe (Se Ae) “qt fir mot: BHR: oefso/goye Bees AAT caterers EMT @3,90,400.00 (aH me Aare Ta EIT HH) ‘prar ate after ae-009u; Gif: 2U/od/R0R0 As a APTA ACA PEATE | ere a8 ce cH, BevirejefrmeE/ TUTE “Tra eT wT ada ARAB ARTO MICA ARTE re we aa ers Beet FTE Brat 0.30% Rm ALAR MFA Freee eH CARTER AN IT ES | Beg fran more ais AeA TCS TE A TT | eegatrios, acer & 3 Tre 03 FT rT athe efferent. oF | eg Ptr ereon =I) ‘rontts ovdore, enya a5, amram, BBUte-8300 TAR : (203) 2e99293,2d0uRE,AADHOIREDARE @ AEBS Website:www.bsti.gov.bd E-mail: bstictg4100@gmail.com, chittagong@bsti.gov.bd wie ERR 2347 [ affert 20(0) HET | ARETE STS ae CR SAE Sree rece ROM ARCH A. 232020 ES es : ste 2 meer reer = oe porecpre rom 98 gern) we terber stfe wae a oe zs Ze; i. Ls I cae 2 (aera RCRA aCe SSeS) wer eer wai eee SIT Brae Feet SHES es Cas Brahe Be CORR) RGA ACHE ART FATT FAH AROMAS aI PAiirents Be weber Ver SAIN AAT RARE SRE TST Sea Sentra aa AMET, Fyrens fox aaa waar sAMTS errs SACS | 21 a8 Ro SHRBS ROTO TEM ete aa aeHS alert @ HTEAG Fe HA | ARETE BER AROMAT con aber Sate webingE fifeeem fer Sos Eorcr < AMC ARCA OAT aR GP 6 afte we, Te Se OAM Bam ARS Ae sat RAR, See cs Aa crercae SPT aRrer x \ ere SRT weet 3 a e gas 750 935-22 20/6 Stat Sov vovicfante rent S Creve (beod Ba) Grads GPH Sizes 0. /2, 20.26 | Grade: B5060CHR 0s Tin 938-22 2olé eee > foe! Ayn Votifyrce want of. GnGor bribed Gas) Braud: GPH Szeto. /2.20- 25 Grades B500CW~R ox. PB a ELD i MO ene ORR WAS 8 AS FAT BET |) TTT FORTE oS RR ABBOT AC Wht» ROD. yy KATA CAS z careret reef SDC Aa. Mila earera OO 0 oa HIB 202d carers Sree Ror (Pera) Ramitere wlan | qe Rare aaTaTE AT oferta gst TAS SRA RARE era Velma ere aT Tenes, frahere wT seer Eo, ober abe aE aR ef eA Berney Tees we MITE Cw BACT Raber recs Sor (SFE shear Oe RAE aReTCT MRE Pe Cerifrw/efaruene ey FaMPeNs ere nthe GaeTe aCe ERT Senfre/efrsrene acre ere wAE frome Remar se efebrr sos Cates STePKoEIE SIA FET fae, aT mare @ ater Frater Hace nace | 7 1 RCC TET BACH oo (FoR) WHT REE ATIC wT aT RC RAr eR CATATOG TEAR BeeACA fat vaifter face 28a | eer efear araprme ge PAR, aTer IMT/SUTAT or Veh OT MTR IY MARNE AH AACE RATT . Bevis eres eer Cage once Berea obra AIM @ eer, TT FBT a ee AAT (mr art copearees) RRAPT, 2009-4 RECMS exaTET FET SE ER Gs oTaRece eT ATT, GOAT, cafes spat eT, Beara wis, TIAA AT aR Rariene ecnrewrs foe aswers MPraw wife eee Carre Rp at ahs sae Fae een eorepe Arata Fe mr erence TET wen ABCA ene | Re a BAM eat EE ARCH eee A MRC ATI GU CE AT CI, SH STR MTR HT BO ears Arce Ice TRL for ara eT eC RR RARE CH CTA HS TRACT HET Ser BHI aT | sretgqetoat ateettert Haast aifcet afr ‘paANT Cora SET ART SAA, THT IO ATE PHETAS MATS, GTA, BEAT -8202 www.doe.gov.bd 2 38/0B/2020 a eG HOT MTC RRL TO er MARA TUTENEN SHIN FA BR, See gr af EE SINTER ce CHI ERT TUR FAR | aero id Baca core MIGHT aR aH CCE TR TATE HE ‘wera UE sare RO wA: http:i/ecc.doe.gov.bd/certificate verification Page 1 of 2 TareTaT a eee fHRRURE Tw MEHTA so agehe afirrts BE ey aratey “STA 9. perm on FR RE cae we era | are Bee x, OTR ARPT, Bee ate a ACRE cats wer ee ws AR SRE EERE PRTG ATER | 2. svre om eretg Hazardous Chemical , 2, Rs 6 wees ft ne fie ar a Sea we wot REIT REE SEAR ce awa Beet eee Fafa BBA we sree aT @ Te (Particulate Matters) Peter after mae en, sone BFP STARA WUT RIE RS | HOTT UH AA eS AAT a A IN MARCA | TH A “eee aT RAT AE RBG A TS AT TE TE TTA APOE TNT HRSA ata wre wal a | 8. ye frmaees oes stevie ets Fume Extraction System *éehre ar¢edtera oi aT a. atta efranrn yrinngs me RT cra are eTERIET BI ANTS CA aera ory seer a for aT eH ee aes 06 (61H) TH Fume Extraction System a et axe wets ogee arya emo Aber era wer a eC ATR HTS a. sree eer srr fo (oT # ‘uprat unit sae Hs eer: http://ecc.doe.gov bd/certificate_verification Page 2 of 2 Certificate of Registration This cetiieate has been awarded to GPH Kspat Limited Masjiddah, Kumira, Sitakunda, Chittagong, Chittagong, 4000, Bangladesh in ecogntion ofthe organization's Quality Management System which compiles with ISO 9001:2015 ‘The scope of activities covered by this certificate Is defined below Manufacturing, Sales and Marketing and Supply of MS Billet, Re-Bars, MS Section and other Steel Products eres umber 238 Daeoftemcof Cerifcaion sue ‘cri Aas caste Expiry Date cereston Cycle 2a Februry 2022 2 23 Febery 2005 1 ‘Revision Date Ree) OrignalCeteate sue Date ‘Scheme Number 2A February 2022 ° 2A February 2022 a For deted explanation forthe data fie above, fer to p/m lings. coniogoe-andrultions (SE esse ne Certificate of Registration ‘This cortficate has been awarded to GPH Ispat Limited Masjiddah, Kumira, Sitakunda, Chittagong, Chittagong, 4000, Bangladesh In recognition ofthe organization’ Environmental Management System which complies with SO 14001:2015 ‘The scope of activities covered by this certificate is defined below ‘Manufacturing, Sales and Marketing and Supply of MS Billet, Re-Bars, MS Section and other Steel Products Sent ae ee a ate ease Date ofteueofcarfeation we mag we caret xr Oto cantestion cle 24 February 2028 a ‘arebnary 205 a fesion te Revson orga Cente Oe Seema Nomber 24Februay 2022 ° hebniay22 on For dete explanation forthe da Fis above, refer to tp /ra.urhollingscamoges-ane-equatins ee on tea the chee Meer Certificate of Registration This certificate has been awarded to GPH Ispat Limited Masjiddah, Kun ‘ra, Sitakunda, Chittagong, Chittagong, 4000, Bangladesh in ecogniton ofthe organization's Heath and Safety Management System which complies with 4SO 45001:2018 ‘The scope of activities covered by this certificate is defined below Manufacturing, Sales and Marketing and Supply of MS Billet, Re-Bars, MS Section and other Steel Products Date of surf Cerfction sue ees wee cantieat apr Date erfestion Cycle 24 Febery 202 2 2a rebnany2ms 2 evsion SS etn Oe . rail Crt Scheme omber ‘Febery ° 2a February 2022 we a dette explanation forthe data ds above refer to hta//wane. ur holdings. con/loga-and regulations ‘issued by we (on bee ofthe Schemes Manager re Certificate of Registration ‘This certificate has been awarded to GPH Ispat Limited Masjiddah, Kumira, Sitakunda, Chittagong-4000, Bangladesh in recognition of the organization's Quality Management System which complies with ISO 9001:2015 ‘The scope of activities covered by this certificate is defined below Manufacture and Sale of Deformed Stee! Bars ‘caricats Number: Date of eeu: (Original) ate of teu: Te0sa@.0011KEn 1a January 2019 18 January 2019 leave No: Expiry Date: 1 17 saruary 2022 ewe RD corr stm tn 49 January 2019 URS Bangladesh Limited 1S\A, Rosa 8, Guta 1 GPH Ispat Limited Draka 1212 Masjdéan. Kumira, Sitakunda, Chittagong-4000 Bangucesh Bangladesh 7 290 29849 569 & +200 26833 503, nfo@ursba com Dear Mr. Mohammed Jahangir Alam Certificate of Registration - ISO 9001:2015 We have great pleasure enclosing your organization's Certificate of Registration and congratulate ‘your business on its achievement. Your organization is now entitled to use the appropriate Registration Logo to market your business’ achievement. ‘Should you wish to use the logo, please follow the process stated below: Log on to our group website www.urs-certification.com Go to the Home page footer, entitled Logo and Regulations — once you click on the link, ‘you will be taken to a new page ~ please read the regulations for the use of the logo. ‘+ At the end of the regulation page, please insert your FULL certificate number — see below. Certificate Number Example: 01234/\/0001/UK/EN We would be very grateful, whilst downloading your logo if you could take the time to complete the cor-line Client Feedback Questionnaire. Alink to the logos can also be found on the Client Portal for those clients that use the portal services. As a supplementary service, your certification details will be entered in to the URS Academy of Certified Businesses’ (UACB) commercial website database, to ensure your registration is widely advertised. The website database is known to be used by many companies who have a policy of Using certified suppliers and as such, the database is a useful tool in the compilation of approved supplier listings. However. if you do not wish to have your details entered into a website database, please notify us in writing within ten working days, Within 24 hours of your certificate being issued, your client ID and a unique username and password will be emailed from UACB Administrator to the following email i. Contd. Letter Reference: 13L1V1 ae If this email is not valid or an email was not provided, contact your local office. Please ensufe ‘emails received from UACB Administrator are enabled. The first surveillance visit has been planned for October 2019, at which time the auditor will be checking that your systems are being maintained Finally, we trust that alls satisfactory, but should you require additional information, please do not hesitate to contact this office. Congratulations on achieving this award; we acknowledge the hard work that janization has undertaken to obtain this certificate. Lotter Reference: 13L1V1 PRODUCTION FAGLITY FOR SINGER BANGLADESH LIMITED. [MAT-002, MATERIAL PROPOSAL FOR REINFORCING BAR, Rev. 0 Appendix — 2 Material Test Report

You might also like