You are on page 1of 14

ANNEX 15

On-site wastewater disposal system

Location plan of individual septic tank and leaching field


VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Albatross villa/ Lancelot Villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *8 1.6m3/day
2 No. of personnel 8 Volume of septic tank = 1.6 * 2 3.2m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 3.2 0.96m3
4 Liquid depth 1.2 m Volume of tank = 3.2+0.96 4.16m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 4.16 / 1.2 3.47m2
Cleaning frequency Width = 1.07m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 3.47= 3 W , L = 3W Length = 3.22m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 3.22 m* 1.1m *1.7m 6m3
Design of septic tank
1. Dimension of septic tank: 3.5m x 1.5m x 1.7m
2. Minimum no. of compartments = 3
3. Minimum diameter of vent pipe = 75mm
4. To provide a water seal system
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for albatross villa/ Lancelot villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =1.6m3/day 1600L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (1600 L/day) / (50 L/m /day) 32
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (32/0.6) 53.3m
No. of trenches 6 Length of 1 trench = 53.3/6 8.9m
Width = (6 x 0.6) + ((1.5-0.6) *5)) 8.1m
Total surface area = 8.1 x 8.9 72 m2

Design of absorption pit


1. Dimensions: 8.9m x 8.1m
References
1. Ministry of Housing and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Eagle villa / Merlin villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *6 1.2m3/day
2 No. of personnel 6 Volume of septic tank = 1.2 *2 2.4m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 2.4 0.72m3
4 Liquid depth 1.2 m Volume of tank = 0.72+2.4 3.12m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 3.12 / 1.2 2.6m2
Cleaning frequency Width = 0.9m
6 ( every 3 years) 1 Surface area = 3 W2, 2.6= 3 W2 , L = 3W Length = 2.8m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 2.8 m* 0.9m *1.7m 4.2m3
Design of septic tank
Dimension of septic tank: 3m x 1m x 1.7m
Minimum no. of compartments = 3
Minimum diameter of vent pipe = 75mm
Proposed volume of septic tank = 5.1m3
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for Eagle villa/ Merlin villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =1.2m3/day 1200L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (1200 L/day) / (50 L/m /day) 24
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (24/0.6) 40m
No. of trenches 5 Length of 1 trench = 40/5 8m
Width = (5x 0.6) + ((1.5-0.6) *4)) 6.6m
Total surface area = 8 x6.6 52.8 m2

Design of absorption pit


1. Dimensions: 8m x 6.6m
References
1. Ministry of Housing and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Birdie villa / Galahad villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *4 0.8m3/day
2 No. of personnel 4 Volume of septic tank = 0.8*2 1.6m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 1.6 0.48m3
4 Liquid depth 1.2 m Volume of tank = 1.6+0.48 2.08m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 2.08 / 1.2 1.73m2
Cleaning frequency Width = 0.76m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 1.73= 3 W , L = 3W Length = 2.28m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 2.3 *0.76 *1.7 3m3
Design of septic tank
Dimension of septic tank: 2.5m x 1m x 1.7m
Minimum no. of compartments = 3
Minimum diameter of vent pipe = 75mm
Proposed volume of septic tank = 4.25m3
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for Birdie villa/ Galahad villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =0.8m3/day 800L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (800 L/day) / (50 L/m /day) 16
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (16/0.6) 26.6m
No. of trenches 4 Length of 1 trench = 26.6/4 6.7m
Width = (4x 0.6) + ((1.5-0.6) *3)) 5.1m
Total surface area = 6.7 x5.1 34.2 m2

Design of absorption pit


1. Dimensions: 6.7m x 5.1m
References
1. Ministry of Housing and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for construction phase
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 12-Dec-13 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 100 L/capita/day Design flow rate = (100 /1000) *100 10m3/day
2 No. of personnel 100 Volume of septic tank = 10 * 1 10m3
3 Liquid retention time 1 days Volume of sludge in 6 months = (5/100) * 10 0.5m3
4 Liquid depth 1.2 m Volume of tank = 10+0.5 10.5m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 10.5 / 1.2 8.75m2
Cleaning frequency Width = 1.70m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 8.75= 3 W , L = 3W Length = 5.12m
7 Volume of sludge deposited 5% of total vol of tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 5.12 * 1.7 *1.7 14.8m3
Design of septic tank
1. Dimension of septic tank: 5.1m x 1.7m x 1.7m
2. Minimum no. of compartments = 3
3. Minimum diameter of vent pipe = 75mm
4. To provide a water seal system
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd

PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of absorption pit for the construction phase
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 12-Dec-13 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Infiltration rate 50 L/m2/day Total flow rate =10m3/day (3 septic tanks) 10000L/day
2 Depth, H 2 m Design flow from one septic tank 3333L/day
3 Let Width, W 4 m Required absorption area= (3333L/day) /50 66.7m2
4 Length, L L m Absorption Area = 2HW+2HL+LW
66.7 = (2x2x4) +(2x2xL)+(Lx4)
L=6.4 m

Design of absorption pit


1. Provide of three absorption pits, each of dimensions: 6.4m long x 4m wide x 2m deep
References
1. Ministry of Housing and Lands, 2004. On Plot Sewage Disposal
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis.
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911

G.T
MH PROPOSED REAL ESTATE
SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC

AVALON GOLF ESTATE

1700
12th FLOOR, TOWER 1
NeXTeracom
G.T Cycbercity Ebene
Tel: +230 404 5800
MH
SEPTIC TANKS & LEACHING
FIELDS DETAILS
(ALBATROSS & LANCELOT)

GR.T 3500
BOIS SEC
MH
MH
GR.T 14.02.14 YR KB

14/bs/avpq/03 A3 : As Shown

G.T G.T
MH
MH
MH MH

A A
SEPTIC
MH TANK MH
Client
Arch.
M&E
Contractor
Other
8000

LEGEND
LEACHING FIELD
MH MANHOLE
B B GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis.
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911

PROPOSED REAL ESTATE

1700
SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC

AVALON GOLF ESTATE


12th FLOOR, TOWER 1
NeXTeracom
Cycbercity Ebene
Tel: +230 404 5800

3000 SEPTIC TANKS & LEACHING


FIELDS DETAILS
(EAGLE & MERLIN)
MH
BOIS SEC

14.02.14 YR KB

14/bs/avpq/04 A3 : As Shown

MH

MH
MH D

C C
LEACHING MH
FIELD Client
Arch.

SEPTIC TANK M&E


Contractor
Other

6600

D LEGEND
MH MANHOLE

GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis.
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911

PROPOSED REAL ESTATE


SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC

AVALON GOLF ESTATE


12th FLOOR, TOWER 1
NeXTeracom
Cycbercity Ebene
Tel: +230 404 5800

SEPTIC TANKS & LEACHING


FIELDS DETAILS
(BIRDIE & GALAHAD)

MH G.T G.T BOIS SEC


MH
14.02.14 YR KB

14/bs/avpq/05 A3 : As Shown

GR.T

MH MH

SEPTIC
TANK 150

MH MH
1500

Client
LEACHING Arch.
M&E
FIELD Contractor
Other
600 900 600 900 600 900 600

5100

LEGEND
MH MANHOLE

GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis .
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911

PROPOSED REAL ESTATE


SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC

AVALON GOLF ESTATE


12th FLOOR, TOWER 1
NeXTeracom
Cycbercity Ebene
Tel: +230 404 5800

STANDARD DETAILS
FOR MANHOLE,GREASE TRAP
& GULLY TRAP

BOIS SEC

14.02.14 YR KB

14/bs/avpq/06 A3 : As Shown

Client
Arch.
M&E
Contractor
Other
Q7 Q8
P24 Q6 1,844m² 2,089m²
,850m² Q5 1,975m²
1,780m² G .T
MH
MH
G .T
MH

G .T
MH

Q4
MH
G R.T
G .T

MH
MH

S EP TICK
1000

G R.T

E
G .T

MH TAN 2500 MH
E
MH

1,780m² 26 Brabant Street, 2nd Floor,


MH F
5100

G
CHIN
LEA F IELD
Q3 6700 Diva Building,Port Louis.
B

150
0
F
0
350

Tel : + (230) 212 1757


S EP
LEA F IELD

TANK

Q9
TIC
CH

1,693m²
MH

B
ING

Fax : +(230) 208 4551


0

A
MH
800

G R.T
G .T

900
0
MH

E-mail :vyyaassconsultingengineer @intnet.mu


MH

1,904m²
B

Q2 A
MH

BRN : C07073722 VAT No. VAT20385911


1,638m² E M
H
Q10
H
H M
M
E
0
D
66
20

00

ING
00

39
CH ELD
Q31
20
1,882m²
A
00
LE FI
H
M C
10
00

PROPOSED REAL ESTATE


80
00
Q1
C
M
H
IC
00
30
TA
NK
D
E
1,925m²
PT
SE
K
SCHEME DEVELOPMENT ON

MH
N H
TA M

G .T
C
TI 00

MH
D EP 30 C
S
2,042m²

MH
00
PLOT Q OF AVALON GOLF
80
00

H
10

D M

G .T
EL C

MH
FI
G
IN

G R.T
Q30 E
00 H

G .T
20 C
00

EA
A
20

MH
00

D
ESTATE AT BOIS SEC
66

H
M
H
)
M
MH
E de
H
1,754m²
M

A
wi
MH
150

0
0
MH

350
S EP NK
LEA F IEL

TA
TIC
CH D
D
0m
66

MH
20

ING
00

Q11

0
00

800
IN G
block Q

MH

A
MH
AVALON GOLF ESTATE
20
A CHFIE LD
6.0
00
.T LE
MH

G .T

G R.T
G C
900
10

0
00

MH
B
80

MH
00
ad
C
12th FLOOR, TOWER 1
30
NK
E 2,064m²
00
TA D
MH
Ro

MH
IC
PT
SE
MH
s
.T
GR P TIC E
ces
25
G .T SE NK
00
00

m NeXTeracom
TA
MH
10

.7 3
MH
E
00

Ac
80,958m²
51

F IN G
LD
A CH FIE
19
MH MH LE
00
67
Cycbercity Ebene
m
. 64 B
F
Q29
E 25 A Tel: +230 404 5800
Q28 1,781m² E
1,872m² Future RQ33
ES Q32
NK

MH
00TA
30C

C
TI
S EP

vehicular 1,911m²
MH
D

E LAYOUT SHOWING DISTANCE


Development
00
00

10
C
80

E
D

1,975m²
EL
G FI

TA NK
IN

00
D
MH

20
TIC3 00 0
CH

MH
S EP
bridge (G) BETWEEN SEPTIC TANK AND
00

E
D
LEA

0
20

8 00 C 00
66
B
FIELD
A
0

MH
NG
1 00

C HI
0 C
2 00
L EA
MH

MH

T
G.
FEEDER BEAU-BOIS
MH
0

6m
6 60

0
2 00

D
Q34 Q12

e)
MH
.0

MH

id
MH
20

T PTIC
MH

25
E
00
NK
Q27 1,920m²

w
E
A
00

.T

S
00

GR
10
2,076m²
51

MH

IE LD G
IN
T

0m
G.

B
C

MH
F
EA
F
63m

L
MH

MH

67

MH
00
ay

8 00
.0

FIE AC H
2,046m² 34 .

LE
LD ING
MH

G .T
BOIS SEC
Halfw e

(6
F

MH
B

ad

A
H

MH
M
0 0

TA PTIC
B
9 00 1 50

SE 0
H

3 50

G R.T
M
Green

NK
Ro
hous

H
G .T M
MH

G .T
66
00

A
20
LD
H

MH
D

00
E

s
FIE
20
00

es
IN
CH
Space

L EA

cc
10

80
C

MH
00
Q13

00
A

G .T
E

A
11.03.14 YR KB

MH
NK
30
m

m 00
TA

B
C

MH
.0 8

C
TI
H

MH
S EP
M
.3 2

G .T
Acc

0
1,960m²

8 00
Q26

FIE AC H

G.T
LE
44

MH
LD ING
618m²

MH
14/bs/avpq/02 A3 : As Shown

16

0
3 50

MH
ess

A
TA PTIC
0

SE

GR
B
0 1 50
9 00

NK
1,882m²

.T
m

MH
G.T
MH

G.T
. 11
Roa

MH
A
6m
E Q14

24

MH
2
d

G.T
10.
(6.0

MH
B 2,065m²

MH

GR
6 70
0

.T
F

5 10
LE
A CH

MH
0
FE
I LD ING
MH

0m
2 50
0
ES EP F
E
T AN TIC
E

1 00
K

36m
MH

wid

0
Q25 MH
G.T
MH

e)
GR
.T

20.
1,805m²
MH
Q35 A

MH
B

MH
G.T
MH

200

0
8 00
0

FIE AC H

G.T
LE
LD ING

MH
E 1,915m²
0
660

L EA
F EF EEE

MH

800

MH
0
0

3 50
CH

A
Q36

D
MH

IN

TA PTIC
0

SE

GR
0

MH
1 50

B
G FIE
9 00

NK

.T
LD

G.T
MH

G.T
D

S E 300
Q24
D

MH
P TIC

A
C
0
200 0
D
100

TA
1,881m²

0
NK
E
E

MH
C

MH

G.T
2,004m² RR

MH

MH

GR
MH
Q15

.T MH
MH

MH
B
B
9 00
0

MH

MH
E

L EA

G.T
8 00

GR
1,918m²

MH

.T
CH

A
200
EBE

IN
0

T AN TIC

MH
S EP
GFIE

K
LD
0

0
660

3 50
MH

L EA
1 50

800
0
AA

B
Q23

A
0
A

C HI
MH

D
NG
FIEL
D
U

S EP
U

C
0

TIC 0

MH
200 0
2,016m²

300
100

TA NK

G.T
-- B

GR
MH

.T
MH
C
Q16
BOOI S

G.T
MH
A

MH
MH
B

MH
MH
380

MH

G.T
0
1,884m²
I

MH
8 00

FIE AC H

G.T
LE
LD ING
E
S

MH
0
3 50

MH
A
TA PTIC
0

SE
0 1 50
9 00

NK

GR

MH
.T
MH

G.T
2000

G.T
MH
A
MH
6600

LEA C H
MH
Q22

8000
IN GFIELD

MH
D

G.T
Q17

MH
S EP TIC
2000

C
1,935m²

GR
1000

.T
3000
Client

TA NK

MH
E 1,893m²

MH
C
MH
Arch.

MH
M&E
Contractor
Other
MH
G .T
G R.T

G .T MH
Q18
MH MH
S EP TIC 1,896m²

1000
TANK
E E2500
MH
MH
F

5100
LEA CH ING
F IELD
6700
B F
Q19
B 1,538m²
9


17
Q20
2,724m² A
370

2
E
0

YP

You might also like