You are on page 1of 19

E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.

rvt

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Sampul


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:08:43 03A-001
Tabel Ruang - 01

MEE

Stop Kontak
No
Nama Ruang/Area Luas Keliling Floor Finish Wall Finish Ceiling Finish Note

Telepon
Ex

Lampu
Saklar
ha

Data
A/C
TV
ust

B01 Teras Depan 10.13 m² 13.88 m Tile + Plint Granito Cat Eksterior Eksisting + Cat 1 1 Renov + Perbaikan dak beton; Pembongkaran profil list plank beton & pemotongan janggutan;
Menghilangkan profil kolom;
B02 Car Port Depan 164.26 m² 82.40 m Paving + Curb Beton
B03 Teras Samping 12.21 m² 19.60 m Tile Granito Cat Eksterior Eternit/GRC + Cat 2 1 1
B04 Car Port Garasi 23.36 m² 20.44 m Paving Block Cat Eksterior Teritis Eternit/GRC + 1 1 Ramp menyesuaikan dengan level Garasi; Reparasi pintu pagar; Dinding pagar dibuat melengkung
Cat (arah Halaman Samping Kiri)
B05 Garasi 34.95 m² 23.40 m Ubin + Plint PC Cat Interior Eternit/GRC + Cat 2 1 1 Reparasi pintu eksisting (kanan); Balok dan dak beton atap dan teritis depan; Kusen & Daun pintu baru
(Kayu 2.50 x 2.30)
H01 Halaman Depan 191.70 m² 91.67 m Rumput Cat Eksterior 3 1 Leveling muka tanah halaman & pengaturan arah kemiringan;
H02 Halaman Samping Kiri 113.93 m² 60.88 m Rumput Cat Eksterior Teritis Eternit/GRC + 2 1
Cat
H03 Halaman Samping 146.69 m² 67.69 m Rumput Cat Eksterior Teritis Eternit/GRC + 3 1 Leveling muka tanah halaman & pengaturan arah kemiringan;
Kanan Cat
H04 Halaman Belakang 62.38 m² 40.85 m Rumput Cat Eksterior Teritis Eternit/GRC + 1 1 Teritis pelat beton (Teras Samping, Pantry, Ruang Makan, Rak Gudang)
Cat
R01 Ruang Tamu 32.28 m² 24.45 m Ubin + Plint PC Cat Interior Eksisting + Cat 3 3 3 1 1 1 Menghilangkan profil kolom (eksterior); Kusen & Daun jendela baru (Aluminium 2.50 x 2.30); Kusen &
Daun pintu jendela baru (Aluminium 2.96 x 2.40);
R02 Ruang Keluarga 34.85 m² 25.20 m Eksisting Cat Interior Eksisting 5 3 3 1 1 1 1
R03 Ruang Makan 21.53 m² 18.90 m Ubin + Plint PC Cat Interior Eksisting 3 3 3 1 1 Persiapan jaringan pipa air bersih/air buangan cuci piring (sink bulat); Kusen & Daun pintu baru (Kaca
sesuai eksisting)
R04 Pantry 9.26 m² 12.20 m Ubin + Plint PC Cat Interior Eternit/GRC 2 2 3 1 Persiapan jaringan pipa air bersih/air buangan cuci piring; Persiapan ducting exhaust kompor; Kusen &
Daun jendela baru (sesuai eksisting)
R05 Ruang Tidur 01 20.00 m² 18.00 m Eksisting Cat Interior Eksisting 1 1 3 1 Daun jendela baru (yang menghadap Halaman Depan, sesuai daun jendela arah Halaman Samping
Kiri)
R06 Ruang Tidur 02 16.00 m² 16.00 m Eksisting Cat Interior Eksisting 1 1 3 1
R07 Ruang Tidur 03 16.00 m² 16.00 m Eksisting Cat Interior Eksisting 1 1 3 1
R08 Ruang Tidur 04 16.32 m² 16.05 m Tile + Plint Granito Cat Interior Eksisting 1 1 3 1 Menghilangkan profil kolom (eksterior); Kusen & Daun pintu baru (Panel solid sesuai eksisting)
R09 Ruang Kerja/Tidur 15.70 m² 15.90 m Tile + Plint Granito Cat Interior Eksisting 1 1 3 1 Relokasi kusen & daun pintu
Tamu
R10 KWC 01 2.93 m² 6.85 m Tile Keramik Tile Kramik Eksisting 1 1 1 1 Sanitair baru (washtafel, closet duduk, jet spray, clean out)
R11 Shower 1.53 m² 5.15 m Tile Keramik Tile Kramik Eksisting 1 1 Partisi shower curtain & kaca pada bingkai dinding keramik; Sanitair baru (shower spray, floor drain)
R12 KWC 02 3.36 m² 7.35 m Tile Keramik Tile Kramik Eksisting 1 1 1 1 Sanitair baru (washtafel, closet duduk, jet spray, clean out)
R13 Shower 1.57 m² 5.25 m Tile Keramik Tile Kramik Eksisting 1 1 Partisi shower curtain & kaca pada bingkai dinding keramik; Sanitair baru (shower spray, floor drain)
R14 KWC 03 3.36 m² 7.35 m Tile Keramik Tile Kramik Eksisting 1 1 1 1 Sanitair baru (washtafel, closet duduk, jet spray, clean out)
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

R15 Shower 1.57 m² 5.25 m Tile Keramik Tile Kramik Eksisting 1 1 Partisi shower curtain & kaca pada bingkai dinding keramik; Sanitair baru (shower spray, floor drain)
R16 Rak Gudang 8.23 m² 15.25 m Tile + Plint Keramik Cat Interior Eksisting 2 2 2 Pembalokan bukaan ke arah Halaman Belakang; Bangku beton 0.35 x 1.45 x 0.45
R17 Koridor Kamar 4.59 m² 9.50 m Eksisting Cat Interior Eksisting 1 1 1 Relokasi kusen & daun pintu (dari Garasi)
R18 Hall Kamar 2.64 m² 6.50 m Ubin + Plint PC Cat Interior Eksisting 1 1 1 Pembalokan bukaan ke arah Ruang Keluarga;
S01 Koridor Pembantu 9.34 m² 19.34 m Tile + Plint Keramik Cat Interior Gypsum 2 1 1 Area bangunan baru; sub-strc: pondasi telapak, sloof; slab on ground, beton bertulang; kolom dan atap
pelat beton;
S02 Ruang Kerja 7.65 m² 11.03 m Tile + Plint Keramik Cat Interior Gypsum 2 1 2 1 Persiapan jaringan pipa air bersih/air buangan cuci piring & mesin cuci baju;
Pembantu
S03 Ruang Pembantu 01 5.01 m² 9.08 m Tile + Plint Keramik Cat Interior Gypsum 1 1 1 Kusen & Daun pintu/jendela baru: Aluminium; Daun pintu panel + krepyak;
S04 Ruang Pembantu 02 5.01 m² 9.08 m Tile + Plint Keramik Cat Interior Gypsum 1 1 1 Kusen & Daun pintu/jendela baru: Aluminium; Daun pintu panel + krepyak;
S05 KMWC Pembantu 2.57 m² 6.45 m Tile Keramik Tile Kramik Gypsum 1 1 Kusen & Daun pintu/jendela baru: Aluminium; Daun pintu panel + krepyak;
S06 Area Jemur 28.84 m² 24.23 m Tile + Plint Keramik Cat Eksterior Dinding roster beton anti tampias 20/20, dari area Koridor Pembantu di lantai dasar; Tangga putar besi,
tiang dia. 0.10; injakan pelat bordes; rangka 40.40.4; hand rail besi dia. 0.05

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Tabel Ruangan - 01


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:08:43 03A-002
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

1
03DD-A01 Block Plan
1 : 200

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Block Massa


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:08:48 03A-101
8.225
3.925 6.20 9.15 2.90 1.90 1.90 1.525 3.40

2.625
Halaman
Car Port Garasi Garasi Belakang
-0.040 -0.060 -0.120

-0.060

1.15
1.80
4.00
Ruang Tidur 03

2.85
Ruang Makan Pantry -0.020

3.40
Ruang Halaman
Halaman Kerja/Tidur Samping

3.65
4.00
Samping Kiri Ruang Tidur 02 Tamu Kanan
-0.120 Ruang -0.120
4.10

Keluarga

15.60
-0.060

1.65
-0.060
4.00

Ruang Tidur 01
3.80

3.80
34.725

Ruang Tamu Ruang Tidur 04

34.75
0.60
1.10

0.60
2.50

2.50
Teras Depan

0.60
-0.020

3.60
Car Port Depan
-0.090

6.60
13.40

Halaman
Depan
-0.120

3.05
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

0.75
0.125
1
03DD-A02 Site Plan
1 : 200

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Rencana Tapak


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:08:54 03A-102
V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12
03A-307 03A-307 03A-308 03A-308 03A-309 03A-309 03A-310 03A-310 03A-311 03A-311 03A-312 03A-312
0.95 4.00 1.35 2.90 0.50 3.75 3.25 2.55 7.725
3.925 6.20 9.15 2.90 1.90 1.90 1.525 3.40

-
---
H12
KMWC 03A-306
Ruang Kerja Ruang Ruang Pembantu H11
Pembantu Pembantu 01 Pembantu 02 -0.040 03A-306
-0.020 0.000 0.000
Halaman
5.725
Car Port Garasi Garasi Belakang
-0.040 -0.120 Koridor H10
Pembantu -0.020
03A-305
-0.060
-0.045
H09
03A-305
0.15

Rak Gudang
Ruang Makan
-0.020 H08
03A-304
R
1.
80
4.00

KWC 02 Shower
Ruang Tidur 03 -0.020 -0.020 Pantry Teras Samping H07
03A-304

Koridor Kamar
-0.020

0.600
0.570
H06
KWC 03 Shower 03A-303
-0.020 -0.020
Ruang Tidur 02 Ruang Halaman
Halaman Kerja/Tidur Samping
Samping Kiri Tamu Kanan
4.00

-0.120 -0.045 -0.120


Ruang -0.060
Keluarga
H05
-0.045 03A-303
-0.060

KWC 01 Shower H04


03A-302
4.00

Ruang Tidur 01 H03


E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

03A-302
Ruang Tamu

Ruang Tidur 04
1.10

H02
4.10

03A-301
2.50

Teras Depan
-0.020

03DD-A03 Lantai 01
0.50

1 1 : 100
4.00 5.00 8.50 4.30 9.225

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Denah Lantai 01


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:01 03A-103
1
03DD-A01 Tampak 01
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2
03DD-A01 Tampak 02
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Tampak 01


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:03 03A-201
1
03DD-A01 Tampak 03
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2
03DD-A01 Tampak 04
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Tampak 02


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:06 03A-202
0.570
0.600

-0.120
-0.120
-0.090

0.72
0.125 3.75 11.00 9.00 6.225 0.80
3.875 19.30
30.90

1
H01
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

0.570
0.600
Teras Depan
-0.060 -0.120
-0.120

0.72
0.125 7.55 3.70 3.50 8.00 7.225 0.80
7.675 15.200 8.025
30.90

2
H02
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 01


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:09 03A-301
3.780

2.600

0.570
-0.060 Ruang Tidur 04 Ruang Tamu Ruang Tidur 01
0.600
-0.045
-0.010 0.000
-0.120
0.72

0.80 7.225 0.60 0.60 4.30 8.50 5.00 3.75 0.125


8.025 1.20 17.80 0.025
30.90

1
H03
1 : 100

3.780
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.600

0.570 Ruang
-0.060 Keluarga Ruang Tidur 01
0.600
-0.045
-0.120 -0.020 0.000
-0.120
0.72

0.80 7.225 0.925 1.775 1.60 8.50 5.00 3.75 0.125


8.025 0.60 0.60 17.80
30.90

2
H04
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 02


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:10 03A-302
3.780

2.600
0.570
Ruang
0.600
Ruang Kerja/Tidur
Ruang Tidur 02 Keluarga Tamu
-0.120
-0.120 0.000
0.000

0.72
0.125 4.00 8.50 4.30 0.60 0.60 7.225 0.80
4.75 16.80 9.225
30.90

1
H05
1 : 100

3.780
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.940
2.600 2.600
Ruang
0.570 Kerja/Tidur
-0.060 Tamu Ruang Makan Shower KWC 03 Koridor Kamar Ruang Tidur 02
0.600
-0.045
-0.010 0.000 -0.020 0.000
-0.120 -0.120
0.72

0.80 7.225 0.60 0.60 4.30 4.25 2.90 1.35 4.00 4.75 0.125
9.225 16.80 4.875
30.90

2
H06
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 03


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:12 03A-303
0.85

2.910

3.780

2.940 2.940
2.810
2.600
0.570
0.600
Ruang Tidur 03 KWC 02 Ruang Makan Pantry Teras Samping
-0.120
-0.120
0.000 -0.020 0.000 -0.020

0.72
0.125 4.00 1.35 2.90 4.25 3.25 2.55 6.925 0.80
4.75 15.75 7.725
30.90

1
H07
1 : 100

2.910
0.06

3.780
0.10
0.30

2.940
0.14

2.810
0.570
0.600
2.81
2.79
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

Ruang Makan Ruang Tidur 03


-0.120
0.000 -0.120
-0.020 0.000
0.72

0.12

0.80 12.725 3.75 4.75 4.00


13.525 12.50
30.875

2
H08
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 04


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:14 03A-304
7.60
1.55 0.625
0.40 6.80 0.40

0.72
0.90 0.850

0.60 0.30
0.09
0.18
2.910 -
---

2.810 2.640 2.720


0.570

3.90

3.62
2.810
0.600

2.20
Garasi
-0.120
-0.090 -0.040 -0.120 -0.045

0.72
0.22

0.10
3.925 6.20 9.60 0.90 0.80
0.975 0.95 5.25 9.475
30.90

1
H09
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.720
0.570 2.640
0.600 2.810
Halaman
Belakang
Garasi Car Port Garasi
-0.040 -0.090
-0.120
0.72

0.80 2.70 5.225 1.50 0.95 9.60 6.20 0.94 2.85 0.135
2.275 7.95 10.55 3.925
30.90

2
H10
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 05


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:17 03A-305
Area Jemur

2.910
2.680

2.720
2.340 2.640
2.810
Halaman Garasi
Belakang Car Port Garasi
-0.020 -0.040 -0.090
-0.120

1.525 1.90 1.90 2.90 0.95 0.975


3.40 8.225 9.15 6.20 3.925
30.90

1
H11
1 : 100

0.925 0.95 5.25 0.875


0.80 0.80 0.75
0.10 0.15 0.15 0.15 0.10
0.90

0.850
-
--- Area Jemur

0.34 1.100
2.910
2.640 2.680

0.30
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.810 2.640 2.720

0.27
3.780
2.520 2.340

3.18
2.810
Ruang Kerja Ruang Ruang KMWC
2.71
2.68

2.34

2.38
Garasi Pembantu Pembantu 01 Pembantu 02 Pembantu

2.07
-0.090 -0.040 -0.120 -0.020 0.000 -0.040

0.04
0.12
2.95 0.975 2.90 1.90 1.90 1.525
3.925 6.20 9.15 8.225
27.50

2
H12
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 06


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:19 03A-306
0.570
Halaman Halaman 0.600
Car Port Garasi Car Port Depan
Samping Kiri Depan

-0.090 -0.120 -0.120 -0.090 -0.120

19.35 7.45 1.95 0.125


5.875 28.875
34.75

1
V01
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.810
0.570

Halaman 0.600
Garasi Halaman Ruang Tidur 01 Car Port Depan
Samping Kiri Depan

-0.040 -0.120 -0.090 -0.090

0.72
0.15 16.15 0.75 0.125
5.73 8.00 4.00 17.025
34.75

2
V02
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 07


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:21 03A-307
4.320

3.100
3.790

2.720 3.000

Halaman Ruang Tidur 01 Ruang Tidur 02 Ruang Tidur 03 Garasi


Depan Car Port Depan
-0.120 -0.090 0.000 -0.040

0.125 0.75 16.15 4.00 4.00 4.00 5.725


17.025 17.725
34.75

1
V03
1 : 100

4.320

3.780 3.100
2.910
0.30
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.810 2.940 2.720 3.000


2.600
2.600 2.640

Ruang
2.67

Ruang Tamu Keluarga Koridor Kamar Rak Gudang Garasi

-0.120 -0.090 0.000 0.000 0.000 -0.020 -0.040


0.09

0.125 0.75 13.85 0.60 0.60 3.80 4.10 3.40 1.80


15.925 13.10 5.725
34.75

2
V04
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 08


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:21 03A-308
3.780

2.940
2.600

0.570
Ruang Shower Shower Rak Gudang Halaman
0.600 Ruang Tamu Keluarga Belakang
Halaman
Depan Car Port Depan Teras Depan
-0.120 -0.090 -0.020 0.000 -0.020 -0.020 -0.020 -0.060 -0.120
0.72

0.125 0.75 12.05 3.00 3.80 4.10 1.70 1.70 1.80 1.20 4.525
15.925 13.10 5.73
34.75

1
V05
1 : 100

0.10 0.75

3.780 2.910

0.06
0.10

0.30
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.940

0.14
2.600 2.810
0.570
Halaman Ruang 0.600

2.76
Halaman
Belakang Keluarga Ruang Tamu Teras Depan Car Port Depan
Depan
-0.060
-0.120 -0.045 Ruang Makan 0.000 0.000 0.000 -0.020 -0.090 -0.120

0.72
4.525 1.20 1.15 4.05 4.10 3.80 2.50 0.50 3.60 8.45 0.75 0.125
5.725 13.10 15.925
34.75

2
V06
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 09


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:23 03A-309
0.85
0.10 0.75

3.780 2.910

2.940

2.600 2.810
0.570
-0.060 0.600
Halaman Ruang Makan Ruang Ruang Tamu Car Port Depan Halaman
Belakang Keluarga -0.045 Depan
-0.120 0.000 0.000 0.000 -0.120 -0.090 -0.120

0.72
4.525 1.20 5.20 4.10 3.80 0.60 0.60 0.60 10.20 3.05 0.75 0.125
5.725 13.10 15.925
34.75

1
V07
1 : 100

Area Jemur
2.640 2.680 2.910
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

2.940
2.600 2.600 2.600 2.810
2.520 2.340
Halaman Ruang -0.060 0.570
Ruang Kerja Belakang Kerja/Tidur 0.600
Pembantu Pantry Tamu KWC 01 Ruang Tidur 04 -0.045 Car Port Depan Halaman
-0.120 -0.120 Depan
-0.020 -0.060 -0.020 0.000 0.000 -0.020 0.000 -0.090 -0.120

0.72
2.725 1.05 0.75 1.20 1.15 2.85 3.65 1.65 3.80 0.60 0.60 0.60 10.20 3.05 0.75 0.125
6.875 11.95 15.925
34.75

2
V08
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 10


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:24 03A-310
Area Jemur
2.680

2.940
2.600 2.600 2.600
0.570 2.340
Ruang
0.600 Kerja/Tidur Ruang Kerja
Halaman Car Port Depan Ruang Tidur 04 Shower Tamu Teras Samping Pembantu
Depan
-0.120 -0.090 0.000 -0.020 0.000 -0.020 -0.020

0.125 0.75 3.05 10.20 0.60 0.60 0.60 3.80 1.65 3.65 2.85 1.15 1.20 0.75 1.05 2.725
15.925 11.95 3.10 3.775
34.75

1
V09
1 : 100

Area Jemur
2.680
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

0.570 2.340
Halaman
0.600 Halaman Car Port Depan Samping Ruang
Depan Kanan Pembantu 02

-0.120 -0.090 -0.020 0.000

0.125 0.75 13.25 16.85 1.05 2.725


30.975 3.775
34.75

2
V10
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 11


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:26 03A-311
Area Jemur

0.570 2.340
Halaman
0.600 Samping Koridor KMWC
Kanan Pembantu Pembantu
Halaman Car Port Depan
Depan
-0.120 -0.090 -0.120 -0.020 -0.040

0.125 0.75 9.65 3.60 16.85 1.05 0.85 1.875


30.975 3.775
34.75

1
V11
1 : 100
E:\Project Architecture\2206 RT Bogor AY84\2206RTAY 230220-DVP.rvt

0.570
Halaman
0.600 Halaman Samping
Depan Kanan

-0.120 -0.120

0.125 0.75 30.10 1.05 2.725


30.975 3.775
34.75

2
V12
1 : 100

C A T A T A N / K E T E R A N G A N P E M B E R I T U G A S I N F O R M A S I P R O Y E K D A T A I N F O R M A S I A R S I P

Renovasi Rumah Tinggal Potongan 12


Jalan Ahmad Yani No 84 Bogor
File Name:

NO PROYEK 2206RTAY
TGL CETAK 2023-05-31 22:09:29 03A-312

You might also like