You are on page 1of 1

Factory Induction (I must say to New Factory) _ Vogue Bangladesh (21.09.

2021)

Development Production Fabric Garment Quality Compliance Commercial

Core How to develop sample for How to execute production How to develop and do bulk How to maintain sample and How to maintain bulk quality How to achieve and maintain How to ship goods and get
Vogue/NEXT ? for Vogue/NEXT ? production of fabric ? bulk technical aspects ? control of Vogue/NEXT ? NEXT COP audits ? payments ?

Details Development Season Critical Path Mill Sources Design Sheet Technical audit RSC/ACCORD Progress Rate 95% Sales Contracts

Development Timeline PCCR Mill Audit Measurement Sheet Quality audit Authorized Building Approval PI
Development Leadtime PO Fabric Spec Block QC File All Legal License Updated LC
Design Sheet Sales Contract Fabric Test Report How to measure Trim Card Minimum Wage Ensure For LC Amendment
Gazette Workers (Section A & B)

Block Master PI Base Submisison Risk Analysis Meeting Workbook Maternity Benefits Timely Paid. Packing List
Measurement Sheet Master LC Base Approval Sample Types Black Seal Samples Resign Workers Service Benefits Commercial Invoices
Timely Paid
Sample Request Form SCS NIS Sample Sizes Buying Samples Lefty Workers Payments Ensure Payment Request

Sample Types P&P SCS Sample Quantity P&P All Workers and Staff Salary Payment Process
Timely Payment
Sample Sizes Fabric and Trims Booking Form P&P Workbook NX Number Earn Leave Timely Ppaid Payment Timeline
Sample Quantity Back to Back PI Care Instructions White Seal NX Manual Packing Method Lift Inspection Report By 3rd TT
Party
Trims Details Back to Back LC Care Label Layout Approval Metal Data Sheet Folding Methonds All Workers Contactable Claim
Contacts Available
Trims Sources LC Terms and Conditions Bulk Hanger Submisison Thread Data Sheet Poly Bag Sizes Transparency Cnsure Deduction
Fabric Sources ETD and ETA Bulk Hanger Approval Interlining Data Sheet Carton Sizes No Child Labor Bank to Bank Documents
Wash and Washing Plant PCD Head Ends Nominated Supplier Lists Shade Band No Harassment Documents Discrepancy
Sample Tag OTD CC Card Elastic Denier Gold Seal Roof Top Parapet Ensure Late Documentation
Sample Tag Format Fabric and Trims Submission Shade Band Draw Cord Shrinkage Bulk Test Report Medical Check up For Technical
Operator/Hazardous Area's
Worker
Sample Photos Fabric and Trims Approval Dye Lots Black Seal Product Test Report All Exit Keep Free
Costing Pattern PSM Meeting Bulk Test Report Print/Embroidery Grading Packing List Approval House Keeping
Open Cost Sheet White Seal Product Test Report Rip and Repair Grading Metal Data Sheet Workers Training
SCS Black Seal Gold Seal Zipper Grading Interlining Data Sheet Elected PC Committee
P&P Bulk Hanger Submisison BCI/GOTS/GRS TC Button Size Button Pull Test Report Drinking Water Test Report
PSM Meeting Bulk Hanger Approval Button Pull Test Report Metal Detection Waste Water Test Report
Risk Analysis Meeting CC Card Spare Button AQL Inspection
Correct Buying Samples Bulk Trim Card Metal Detection Pass IC Report
Base Submission QC File Metal Detection Sticker Claim Settlement
Base Testing Vessel Booking with DC QC File
Base Hanger Gold Seal PP Meeting
Trims Submission Packing List Gold Seal
Trims Approval Invoice Technical Audit
PP Meeting Claim Settlement Calculation Claim Settlement

Authorized Name

Signature

You might also like