Check List for Preparation of Detailed Project Report to be

Submitted for Loans under RIDF

Allied to Agriculture Sector (Plantation / Horticulture / Forestry etc.)

Project
I. Name of Project : RIDF XXIX -INFRASTRUCTURAL DEVELOPMENT WORKS OF THALAVOOR
PATTUPURAKKAL ELA, KUNNINVATTOM ELA, MADANTHAKODU ELA, VAKKANADU
ELA IN KAREEPRA PANCHAYATH AND RENOVATION OF PANGODE CHIRA IN
PAVITHRESHWARAM PANCHAYATH IN KOLLAM DISTRICT
ii. District covered : KOLLAM
iii.Project Outlay (Rs.Lakhs) : Rs. 1000 Lakhs

SI No Item Remarks Furnished


1 General ( Yes /No)

I Whether the project is Prioritized by the state Yes


Government
Yes
Ii Whether the Project Submitted through the
Nodal Department Yes

Iii Whether the Project included in the State


Palm
2
Clearness From (wherever applicable)
i NA
Ministry of Environment & Forests
ii Yes
Administrative Approval
iii Yes
Technical sanction
iv NA
Land Acquisition – Extant status &time -
3 frame
Enhance agriculture
I General Profile output by
infrastructural activities.
Ii Objective of the project Yes
Land Classification based Chapter II
Salient Features the project on soil survey
Topographicalfeatures,
drainage, soil,
characteristics etc.

1
I Agro- economic survey
Population, farm Yes
Demographic and social characteristics size,land use, hand Chapter III
holding pattern/ farm
size distribution.
ii Yes
Existing and proposed chapter III
Cropping pattern cropping pattern and
yields
iii
Extension services and Yes
Agricultural support services supply of inputs , Chapter III
marketing credit
arrangements
5

I Technical aspects Yes


chapter IV
Location and suitability of the project area for
Ii the proposed investment
Yes
All relevant details on technical aspects of
proposed investment, backward and forward
linkages including marketing, cost of
6 development / unit etc. should be furnished.

I Financial Aspects Yes


Price Software-2018
Schedule of rates adopted (where up to dated
Ii to current cost) NA

If not where cost proposed will be sufficient to


Iii create the assets
Yes
a Cost Estimate Total physical quantity,
already completed and
b Item – wise cost of project balance to be completed NA
for each item of
Item- wise expenditure incurred development should be
c detailed with unit cost NA
and analysis
d Item- wise cost of balance works Yes

e Item – wise RIDF loan Yes

f Item -wise State Government contribution Yes

2
g Year – wise phasing of RIDF loan and State

h Government contribution

i Arrangement for maintenance after 3 years

j Bar chart for project execution


NA
Specific justifications for high cost of
7 Yes
development, wherever required
Chapter – III
I Benefits and Justification
Potential to be created
Overall impact of the project need to assed
and detailed Increase in contribution
to GDP

Non – recurring and


recurring employment
generation

Income ‘Without’ and


‘With’ project and cash
statement to be
8 furnished Yes
Chapter III
I Operation and Maintenance Trough beneficiary Pond
Protection Samithies
Arrangements for maintenance of the Project
9 after execution till realization of returns Yes
I Chapter II, IV
Infrastructure Facilities

Organizational structure of the implementing Yes


Ii Department

Capacity and preparedness of the Yes


implementing Department and status of the
Iii implementation of earlier sanctioned projects Yes
Iv Quality control infrastructure and mechanism Yes
V Availability of Labour

3
a Budget provision

b For contribution to state share

c For Subsequent O& M


Yes
10 For payments of loans – Principle and interest Chapter V

I Project Risks NA

Ii Land acquisition NA

Iii Forest clearance NA

Iv Railway/ road crossing NA

Any other risk


11 Yes
Chapter V
I Convergence with any other program

Furnish details

Project Engineer

KLDC Ltd, Kayamkulam