You are on page 1of 1

Continental Engineering Corporation

1st Floor, Y.S.Reddy Complex, Ram Nagar Extension, Anantapur-515 001. A.P.
Phone: 08554-276547, Fax: 08554-276548.

ABSTRACT OF TRIAL REPORTS

Trail I: At Km. 357.910 to Km. 357.810 LHS, DBM 1st Layer

% of Compaction Average core


Rolling Pattern adopted Remarks
Achieved by NDG compaction
1 Plane Pass 93.80 < 98%
3 Low Vibration 95.96 99.7 < 98%
1 High Vibration 98.37 > 98%
2 PTR + 1 Plane Pass 99.97 > 98%

Trail II: At Km. 357.810 to Km. 357.700 LHS, DBM 1st Layer

% of Compaction Average core


Rolling Pattern adopted Remarks
Achieved By NDG compaction
1 Plane Pass + 2 Low
96.30 < 98%
Vibration
2 High Vibration 97.37 99.08 < 98%
2 PTR + 1 Plane Pass 99.67 > 98%

Trail III: At Km. 357.700 to Km. 357.600 LHS, DBM 1st Layer

% of Compaction Average core


Rolling Pattern adopted Remarks
Achieved by NDG compaction
1 Plane Pass 93.59 < 98%
4 Low Vibration 97.73 99.3 < 98%
2 PTR + 1 Plane Pass 99.13 > 98%

CONCLUSION:

Rolling Pattern of Trail I is comparatively better and satisfies the requirements.