Professional Documents
Culture Documents
- 2015)
signature
, (REVISION
E
EG
PART A
-
(Maximdm marks: l0)
LL
CO
I Answer a// questions in one or two sentences. Each question carries 2 marks'
2.
C
Differentiate between Arterial and Sub-arterial roads'
NI
3. Brief about Boulevards.
CH
PART B
-
(Maximum marks: 30)
N
t2r2l [r'r'o'
Marks
PART C
-
(Maximum marks : 60)
(Answer oze firll question from each rmit Each firll question carries 15 marks.)
Uxrr I
-
m (a) Describe the stages in town development. 8
On
tV (a) Differentiate between concenfic spread and Ribbon development.
E
8
(b)
EG
Explain dersity zoning. 7
UNrr Il
-
LL
V (a) Enlist the causes of traffic congestion. 7
CO
(b) Brief about ttre methods of faffic control. 8
(a)
C
Explain any 4 types of street systems with the help of figures. t2
NI
(b) List out any 3 categories of arrangement made at important junctions. 3
Unrr III
CH
-
VIt (a) Illustrate and write about the design oi playgrounG. 9
(b) Explain any 3 principles of park design in detail.
TE
On
LY
Unrr IV
-
(a) Enlist the necessities of a master plan. o
(b) Write about any 9 salient features in ttre planning of Chandigarh city.
N
9
DI
On
(a) Enlist the details to be included in the drawings to be prepared for a
A'
Development plan. 8
M
(b) Write about any 7 salient featues in the planning of Gandhinagar city. 7