PRE-HANDING OVER CHECKLIST

Status
Sl. No. Description Yes or No?
1 Gypsum Partition
2 Gypsum Partition 1st coat of painting
3 Gypsum Partition 2nd coat of painting
4 Modular glass Partition
5 Modular doors with all hardware's
6 Flush doors
7 Gypsum Ceiling
8 Gypsum Ceiling 1st coat paint
9 Gypsum Ceiling 2nd coat paint
10 Grid celling with Tiles and final alignment
11 Trap doors
12 Above False ceiling gap closing for noise proofing
13 HVAC Ducting with insulation
14 Sprinkler works with Pressure testing
15 AHU readiness
16 AHU starter Panel
17 VCD
18 Actuators
19 Fire Damaper
20 AHU room acoustic insulation
21 HVAC units installation, testing and commissioning
22 HVAC diffusers
23 HVAC return air grills
24 Split unit Ac installation and commissioning
25 Cassette Ac units installation and commissioning
26 Timer for Split ac operation - 12hrs
27 Drain pipe connection for Indoor units- Leak tested
28 HVAC - Outdoor units installation, testing and commissioning
29 HVAC - Outdoor Units starter panels
30 Air balancing
31 Thermostats /Remote
32 Wall Fans
33 Exhaust system - installation, testing and commissioning
34 2X2 light fixtures installation, testing and commissioning
35 Linear light fixtures installation, testing and commissioning
36 Down Lighters installation, testing and commissioning
37 Emergency lights installation, testing and commissioning
38 Designer Lights installation, testing and commissioning
39 Above false ceiling smoke detectors
40 Response Indicators
41 Below False Ceiling Smoke detectors
42 Sprinkler bulb
43 FAS panels installation, testing and commissioning
44 PA- Speakers, installation, testing and commisioning
45 Fire extinguishers
46 Electrical LT Panel
47 Electrical DB
48 Electrical DB shutter
49 UPS installation and commissioning
50 Inverter installation and commissioning
51 Signal boosters
52 Wi-Fi
53 Conduiting/Cabling for TV (DTH)
54 Server rack - installation
55 Server room - completion in all respect
56 Network cable termination- Rack end
57 Network cable termination- field end
58 Installation of patch cords - Rack end
59 Dedicated AC for server room - commisioned
60 Fluke test
61 Networks cables numbering and Labelling
62 Wooden Flooring
63 Carpet flooring
64 Vitrified flooring
65 Vinyl flooring
66 False flooring
67 Floor transition profiles
68 skirting profiles
69 Corner profiles
70 workstations
71 Switch sockets installation and testing
72 Data ports installation and testing
73 Switch socket and data ports numbering and labelling
74 Workstations privacy panels
75 Workstation Modesty panels
76 Floor junction boxes plate covering with finishing
77 Meeting tables
78 Reception Table
79 Meeting table flip boxes
80 Meeting room HDMI/VGA cables - Working condition
81 Pelmets
82 Blinds
83 Over Head Storages with keys handed over
84 Low height Storages with keys handed over
85 Lockers with keys handed over
86 Pedestals with keys handed over
87 Acousting panelling
88 Writing surface/vinyl/Lacquered glass
89 Security table
90 Water dispenser units
91 Pantry counter - completion in all aspects
92 Chairs
93 Loose furniture's
94 Graphics and Signage's
95 Fire evacuation plan
96 Key Holder
97 Frosting for glass
98 Access control - Installation, testing and commissioning
99 CCTV - Installation, testing and commissioning
100 Deep cleaning
ECKLIST

If No What is
If No Why? completion date Remarks