Work Diary: JANUARY 2021-1st Fortnight

NIDHI.S, Deputy Director, Office of the Chief Engineeer


PEN: 706012 DESIGNATION :
IDRB IDRB,Trivandrum

DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity

1 FRI Design of Deck slab

2 SAT MANNAM JAYANTHI HOLIDAY

3 SUN SUNDAY HOLIDAY

4 MON Discussion with AD, file related to Thekkinikkara canal Design of Deck slab

Design of Deck slab submitted to


5 TUE Design of Deck slab Associated Structural Consultant
for review.

Discussion on design of Road


6 WED Review of design of Cheriyakkara Abutments bridge across BM Canal at
Kaliyamvally with DD and JD

File scrutiny of Kalliyamvally,


7 THU Review of design of Cheriyakkara Abutments Updation of Website
Discussion with AD

Discussion with AD, file related


8 FRI Thekkinikara discussion with JD Review of design of Cheriyakkara Abutments
to Thekkinikkara canal

9 SAT SECOND SATURDAY HOLIDAY

10 SUN SUNDAY HOLIDAY

Discussion and file work related


Review of tentative drawings of
11 MON to purchase of system for File scrutiny of Kalliyamvally Discussion with JD, Kalliyamvally.
Cheriyakkara Bridge
installing MIDAS software.

Attended Bridge Design class - Discussion of Superstrructure. File work related to midas Review and corections of the
12 TUE
( Class under Capacity building Programme ) software drawing of Cheriyakkara bridge

Review and corections of the Tentative drawing to JD for Review of design of Cheriyakkara
13 WED Tentative drawing sumitted.
drawing of Cheriyakkara bridge review Abutments, Updation of Website.

14 THU HOLIDAY

15 FRI HOLIDAY

** In addition to this,
1. Attendaence certificate of Canal Division, general matters related to Canal Division.

Signature

Signature of Controlling Officer


Work Diary: JANUARY 2021-2nd Fortnight
NIDHI.S, Deputy Director,
PEN: 706012 DESIGNATION :
IDRB

DATE DAY FN1 Activity FN2 Activity AN1 Activity

16 SAT Review of design of Cheriyakkara Pile foundation of Abutments

17 SUN SUNDAY HOLIDAY

18 MON LA interpellation Review of design of Cheriyakkara Pile found

Design of Deck slab submitted to Associated


19 TUE Review of design of Cheriyakkara Pier
for review.

Attended Bridge Design class - Review of Design /


20 WED Drawing for Bridge Deck Slab. ( Class under Capacity Review of design of Cheriyakka
building Programme )

21 THU Design of Deck slab based on the comments from Associated Structural Consultant.

22 FRI Design of Deck slab and review of Drawings based on the comments from Associated Structura

Thekkinikara discussion Thekkinikara discussion with


23 SAT Review of drawings of Deck
with AD JD

24 SUN SUNDAY HOLIDAY

25 MON Design of Deck slab based on the comments from Associated Structural Consultant.

26 TUE REPUBLIC DAY HOLIDAY

27 WED Design of Deck slab based on the comments from Associated Structural Consultant.

28 THU Design of Deck slab and review of drawings Review of drawings of Deck slab

29 FRI CASUAL LEAVE

30 SAT CASUAL LEAVE

31 SUN SUNDAY HOLIDAY

** In addition to this,
1. Attendaence certificate of Canal Division, general matters related to Canal Division.
Signature of Controlling Officer
ht
Office of the Chief
Engineeer
IDRB,Trivandrum

AN2 Activity

of Abutments

Cheriyakkara Pile foundation of Abutments

ubmitted to Associated Structural Consultant


for review.

of design of Cheriyakkara Pier

Updation of Website

m Associated Structural Consultant.

ew of drawings of Deck slab

d Structural Consultant.

d Structural Consultant.

Updation of Website

Signature
i
Work Diary: FEBRUARY 2021-1st Fortnight
Office of the Chief
NIDHI.S, Deputy Director,
PEN: 706012 DESIGNATION : Engineeer
IDRB
IDRB,Trivandrum

DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity

Design of Deck slab


submitted to Associated
1 MON Review of drawings of Deck slab
Structural Consultant for
review.

Bridge deck modelling in STAAD


2 TUE Review of design of Cheriyakkara Pier and Pile foundation
( Discussion with AD's)

Attended Bridge Designing class - Review of Design /


3 WED Drawing for Bridge Deck Slab. ( Class under Capacity Review of design of Cheriyakkara Pier and Pile foundation
building Programme )

Design of Deck slab and review of Drawings based on the comments from Associated
4 THU Updation of Website
Structural Consultant.

Design of Deck slab based on the comments from Review of Drawings based on the comments from Associated
5 FRI
Associated Structural Consultant. Structural Consultant.
i
Review of Drawings based on the comments from Associated
6 SAT Review of design of Cheriyakkara Pier and Pile foundation
Structural Consultant.

7 SUN SUNDAY HOLIDAY

Review of the drawings of Deck slab of Cheriyyakkara


8 MON Works related to MIDAS training
bridge

9 TUE MIDAS Training MIDAS Training MIDAS Training MIDAS Training

10 WED MIDAS Training MIDAS Training MIDAS Training MIDAS Training

11 THU MIDAS Training MIDAS Training MIDAS Training MIDAS Training

Works related to review Review of the drawings of Deck Works related to review meeting
12 FRI CE 's Meeting
meeting presentations slab of Cheriyyakkara bridge presentations

13 SAT SECOND SATURDAY HOLIDAY

14 SUN SUNDAY HOLIDAY

** In addition to this,
1. Attendaence certificate of Canal Division, general matters related to Canal Division.

Signature

Signature of Controlling Officer


Work Diary: FEBRUARY 2021-2nd Fortnight

NIDHI.S, Deputy Director,


PEN: 706012 DESIGNATION :
IDRB

DATE DAY FN1 Activity FN2 Activity AN1 Activity

Review of the drawings of


Works related to review
15 MON Deck slab of File scrutiny of Kalladukkam
meeting presentations
Cheriyyakkara bridge

16 TUE Review of the design of Cheriyyakkara bridge

17 WED Review of the design of Cheriyyakkara bridge

18 THU Review of the design of Cheriyyakkara bridge

19 FRI Review of the design of Cheriyyakkara bridge

20 SAT Review of the design and drawings of Cheriyyakkara bridge

21 SUN SUNDAY HOLIDAY

22 MON Review of the design and drawings of Cheriyyakkara bridge

23 TUE Review of the design and drawings of Cheriyyakkara bridge

Discussion with AD ,file related to


24 WED File scrutiny of Kalladukkam
Thekkinikkara canal

File scrutiny of Design of Deck slab of


25 THU Discussion with AD and JD
Kalladukkam Kalladukkam

26 FRI CASUAL LEAVE

27 SAT LOCAL HOLIDAY

28 SUN SUNDAY HOLIDAY

** In addition to this,
1. Attendaence certificate of Canal Division, general matters related to Canal Division.
Signature of Controlling Officer
ght

Office of the Chief


Engineeer
IDRB,Trivandrum

AN2 Activity

Works related to review meeting


presentations

dge

dge

Updation of Website

dge

kara bridge

kara bridge

Design submitted to JD.

Design of Deck slab of


Kalladukkam

Updation of Website

Signature
i
FIRST FORTNIGHT TENTATIVE ADVANCE WORK PROGRAMME : MARCH 2021

PEN : 706012 DESIGNATION : NIDHI .S, DEPUTY DIRECTOR, IDRB

DATE DAY FN1 Activity FN2 Activity AN1 Activity

1 MON Design of Cantilever slab of the Deck Design of Cantilever slab of the Deck

2 TUE Design of Interior pannel slab of the Deck Review by JD

3 WED Bridge design class. ( Class under Capacity building Programme ) Check for shear and reinforcement details for the deck slab

4 THU Preparation of drawings Preparation of drawings

5 FRI Design of Longitudinal Girders MIDAS modelling of Deck slab

6 SAT Design of Longitudinal Girders MIDAS modelling of Deck slab

7 SUN Holiday

8 MON Design of Longitudinal Girders Design of Longitudinal Girders

9 TUE Review of the design of Cheriyyakkara bridge retaining wall Review by JD

10 WED Bridge design class. ( Class under Capacity building Programme ) Review of the design of Cheriyyakkara bridge retaining wall

11 THU Holiday

12 FRI Review of the design of Cheriyyakkara bridge retaining wall Review of the design of Cheriyyakkara bridge retaining wall

13 SAT Holiday

14 SUN Holiday

15 MON Design of Cross Girders Design of Cross Girders


RK PROGRAMME : MARCH 2021

Office of the Chief Engineeer


IDRB,Trivandrum
AN2 Activity

Design of Cantilever slab of the Deck

Design of Interior pannel slab of the Deck

Check for shear and reinforcement details for the deck slab

Updation of Website

MIDAS modelling of Deck slab

MIDAS modelling of Deck slab

iday

Design of Longitudinal Girders

Review of the design of Cheriyyakkara bridge retaining wall

Review of the design of Cheriyyakkara bridge retaining wall

iday

Review of the design of Cheriyyakkara bridge retaining wall

iday

iday

Design of Cross Girders