You are on page 1of 6

Work Diary: JANUARY 2021

NAME DESIGNATION Dr. Jasmin I Assistant Office of the Chief Engineer


PEN: 742534
: Director IDRB,Trivandrum

DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity

1 FRI Design of Tractorway at Cheriyakkara, Kasargod : Tentative Design of Abutments

2 SAT MANNAM JAYANTHI HOLIDAY

3 SUN SUNDAY HOLIDAY

4 MON Design of Cheriyakkara Abutments

5 TUE Design of Pile foundation for Cheriyakkara Abutments (Tentative)

Discussion on design of Road


6 WED Design of Pier for Cheriyakkara (Tentative) bridge across BM Canal at
Kaliyamvally with DD and JD
File scrutiny of Kalliyamvally, Updation of Website
7 THU Design of Pier for Cheriyakkara (Tentative)
Discussion with DD

8 FRI Design of Pile foundation for Pier. Preparation of tentative drawings

9 SAT SECOND SATURDAY HOLIDAY

10 SUN SUNDAY HOLIDAY

Corrections on design and tentative drawings of Cheriyakkara Discussion with JD,


11 MON File scrutiny of Kalliyamvally
Bridge as per the directions of DD and JD Kalliyamvally.

Attended Bridge Design class - Discussion of Superstrructure. Preparation of drawings of deck slab for onward submission to
12 TUE
(Class under Capacity building Programme) Associated Structural Consultants

Missing/Additional details Trentative drawings submitted


13 WED called for design of Road to EE, Inland Division, Kannur Review of works with JD Updation of Website.
bridge at Kaliyamvally for estimate preparation
14 THU HOLIDAY

15 FRI HOLIDAY

16 SAT Detailed Design of Abutment for Cheriyakkara Bridge

17 SUN SUNDAY HOLIDAY

18 MON Detailed Design of Pile foundation for Abutment

Design of Deck slab-discussion with DD and submitted to


19 TUE Preparation of drawings of deck slab
Associated Structural Consultant for review.
Attended Bridge Design class - Review of Design / Drawing for
20 WED Bridge Deck Slab. (Class under Capacity building Deatiled design of Pier
Programme )
21 THU Deatiled design of Pier Updation of Website

Pamba Basin paln modelling -


22 FRI Preaparation of presentation for Pamba Basin paln modelling Meeting with RTI team and world
bank officials

Correction of drawings of Deck slab based on the discusiion with


23 SAT Pamba Basin paln modelling-report preaparation
DD

24 SUN SUNDAY HOLIDAY

25 MON Detailed Design of Pile foundation for Pier

26 TUE REPUBLIC DAY HOLIDAY

27 WED Detailed Design of Pile foundation for Pier. Preparation of drawings for abutment and its pile foundation

Correction of drawings of Deck


28 THU Preparation of drawings for abutment and its pile foundation slab based on the discusiion Updation of Website
with DD

29 FRI Preparation of drawings for Pier and its pile foundation

30 SAT Preparation of drawings for Deck slab


31 SUN SUNDAY HOLIDAY
Signature of Controlling Officer Signature
Work Diary: FEBRUARY 2021

NAME DESIGNATION Dr. Jasmin I Office of the Chief Engineer


PEN: 742534
: Assistant Director IDRB,Trivandrum

DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity

Design of Deck slab


submitted to Associated
1 MON Corrections in abutment and pile design after review
Structural Consultant for
review.
Bridge deck modelling in
2 TUE Corrections in Pier and Pile design after review by DD
STAAD (Discussion with DD)
Attended Bridge Designing class - Review of Design /
Corrections of Deck slab Drawings based on the comments from
3 WED Drawing for Bridge Deck Slab. (Class under Capacity
Associated Structural Consultants
building Programme)
Corrections of Deck slab drawings based on the comments from Associated Structural
4 THU Updation of Website
Consultants.

5 FRI CASUAL LEAVE

Corrections in Drawing based on the comments from Associated


6 SAT Corrections in design after review
Structural Consultant.

7 SUN SUNDAY HOLIDAY

Finalizing drawings of Deck slab of Cheriyyakkara Pamba Basin Plan-Document review- Adding contents after
8 MON
bridge discussion with RTI, Meeting with RTI at 8 pm via VC

9 TUE Midas training Midas training Midas training Midas training

10 WED Midas training Midas training Midas training Midas training

11 THU Midas training Midas training Midas training Midas training

Submission of completed design of Deck slab, abutment, pile foundation for abutment, Pier and pile foundation of
12 FRI
Cheriyyakkara bridge to DD for approval
13 SAT SECOND SATURDAY HOLIDAY

14 SUN SUNDAY HOLIDAY

Pamba basin Plan- Works related to review File scrutiny of Checkdam cum bridge at Kalladukkam, Kasargod,
15 MON
Editing of Section 1 meeting presentation Meeting with RTI at 8 pm via VC

16 TUE CASUAL LEAVE

Final Editing of drawing (sheet no.1) of cheriyakkara as per


17 WED CASUAL LEAVE
corrections by DD

18 THU Final Editing of drawing (sheet no.2) of cheriyakkaraas per corrections by DD Updation of Website

19 FRI Final Editing of drawing (sheet no.3 and 4) of cheriyakkara as per corrections by DD

20 SAT Final Editing of drawing (sheet no.5) of cheriyakkaraas per corrections by DD

21 SUN SUNDAY HOLIDAY

Finalization and Submission of drawings of Pamba basin Plan- Editing of Section 2,


22 MON
Cheriyyakkara bridge - 5 sheets to DD Meeting with RTI at 8 pm via VC

23 TUE Scrutiny and initiated design of retaining wall for Cheriyakkara as per additional requirement from site

Discussion on design of Checkdam cum bridge at


24 WED Design of retaining wall for Cheriyakkara
Kalladukkam
Discussion on Design of retaining wall for
25 THU Discussion on Kalladukkam Updation of Website
Kalladukkam with DD Cheriyakkara

26 FRI Design of retaining wall for Cheriyakkara

27 SAT LOCAL HOLIDAY

28 SUN SUNDAY HOLIDAY

Signature of Controlling Officer Signature


Work Diary: MARCH 2021-1st Fortnight

NAME DESIGNATION Dr. Jasmin I Office of the Chief Engineeer


PEN: 742534
: Assistant Director IDRB,Trivandrum

DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity

Pamba basin Plan- Editing of Section 3, Meeting with RTI at 8 pm


1 MON FNPR preparation and work diary for Jan and Feb
via VC

Design of retaining wall for


2 TUE Design of retaining wall for Cheriyakkara Review of works by JD
Cheriyakkara

3 WED Bridge design class. Covid Vaccination

Design of retaining wall Design of retaining wall for


4 THU Review by CE and Director Updation of website
for Cheriyakkara Cheriyakkara

5 FRI Design of pile foundation for retaining wall

6 SAT Design of pile foundation for retaining wall

7 SUN SUNDAY HOLIDAY

Pamba basin Plan- Editing of Section 3 and 4. Meeting with RTI


8 MON Design of pile foundation for retaining wall
at 8 pm via VC

Preparation of drawings for


9 TUE Preparation of drawings for retaining wall Review of works by JD
retaining wall

10 WED Bridge design class. Preparation of drawings for pile foundation of retaining wall

11 THU HOLIDAY

Preparation of drawings
Preparation of drawings for pile foundation of retaining wall and
12 FRI for pile foundation of Review by CE and Director
submission
retaining wall

13 SAT HOLIDAY

14 SUN SUNDAY HOLIDAY

Pamba basin Plan- Final


15 MON Sbmission of design and drawing of retaining wall documentation. Meeting with
RTI at 8 pm via VC

Signature of Controlling Officer Signature