DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity
Attended Bridge Design class - Discussion of Superstrructure. Preparation of drawings of deck slab for onward submission to
12 TUE
(Class under Capacity building Programme) Associated Structural Consultants
15 FRI HOLIDAY
27 WED Detailed Design of Pile foundation for Pier. Preparation of drawings for abutment and its pile foundation
DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity
Finalizing drawings of Deck slab of Cheriyyakkara Pamba Basin Plan-Document review- Adding contents after
8 MON
bridge discussion with RTI, Meeting with RTI at 8 pm via VC
Submission of completed design of Deck slab, abutment, pile foundation for abutment, Pier and pile foundation of
12 FRI
Cheriyyakkara bridge to DD for approval
13 SAT SECOND SATURDAY HOLIDAY
Pamba basin Plan- Works related to review File scrutiny of Checkdam cum bridge at Kalladukkam, Kasargod,
15 MON
Editing of Section 1 meeting presentation Meeting with RTI at 8 pm via VC
18 THU Final Editing of drawing (sheet no.2) of cheriyakkaraas per corrections by DD Updation of Website
19 FRI Final Editing of drawing (sheet no.3 and 4) of cheriyakkara as per corrections by DD
23 TUE Scrutiny and initiated design of retaining wall for Cheriyakkara as per additional requirement from site
DATE DAY FN1 Activity FN2 Activity AN1 Activity AN2 Activity
10 WED Bridge design class. Preparation of drawings for pile foundation of retaining wall
11 THU HOLIDAY
Preparation of drawings
Preparation of drawings for pile foundation of retaining wall and
12 FRI for pile foundation of Review by CE and Director
submission
retaining wall
13 SAT HOLIDAY