DCCD ENGINEERING CORPORATION

DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203
Work Suspention
CUT-OFF PERIOD: (August 16-31, 2022) Weekends
CLIENT ON-GOING PROJECTS REMARKS (WORKS DONE)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 First day of work
August 22 - Team Briefing and Review of Master
WEECOM WCDI Residential Development in 8 Plans and related documents
Cagayan de Oro(2020-084-2063)

August 23 - Work suspended after 1:00pm.


August 24 - Work suspension due to weather
Work Suspension, Orientation, August 25 - (Office) Orientation for newly hired
DCCD Holiday 4 8 2 8 employees.
August 29 - National Heroes Day

August 23 - Review of Detention Ponds plans.


Work suspended after 1:00pm. August 25 -
(Office) Review of Detention Ponds. Orientation
for newly hired employees.
Laguindingan technopark DP1 August 26 - Reflection of detention pond 1 and
2022-102-2063 4 6 8
other details from layout plan
MDC

Laguindingan technopark DP4 August 30 - Reflection of detention pond 4 and


8 other details fromlayout plan
2022-101-2063
Laguindingan technopark DP5 August 31 - Reflection of detention pond 5 and
8 other detail from layout plan
2022-117-2063
0 0 0 0 0 0 8 8 8 8 8 0 0 8 8 8

Total Number of Hours 64

BENJIE P. BAGUINON
PROJECT MANAGER
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (August 16-31, 2022)


CLIENT ON-GOING PROJECTS
1 2 3 4 5 6 7 8 9 10
DCCD ISO hour

Cebu District
Gate Walk Central Estates (Block 9) 4
Property Enterprise, Inc.

(2021-147-2063) CLI Xavier


Cebu Landmaster University and Manresa Town 8 8 8 8
Mixed-Use Dev't

Laguindingan technopark DP1


2022-102-2063

Laguindingan technopark DP4


MDC 2022-101-2063 4 8 8

Laguindingan technopark DP5


2022-117-2063

Edge Properties
Development Corporation Kawayan Cove Expansion Project
(EPDC)
8 8 0 0 8 8 8 8 8 0

Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
(August 16-31, 2022)
REMARKS (WORKS DONE)
11 12 13 14 15
2 September 15 - Meeting for ISO hour
September 1 - Review of Plans
4 September 14 - Review of Site Grading and
Site Utilities

September 2 - Cost Estimates for manresa


water system
September 5 - Cost Estimates for xavier
Water system
September 6 - Cost Estimates for xavier
Drainage System
September 8 - Cost Estimates for xavier
Sewer System

September 1 - Update plans for Detention


plans
September 7 - Prepare Laguidingan
Detention Ponds Presmat
September 9 - Prepare Weir Dimension
Septmeber 12 - Update Discharge and weir
dimension, update information for presmat
September 13 - Update Information for
Presmat
8 8 4 4 September 14 - Update Weir dimension
September 15 - Prepare lift sizing for 25,50,
100 yr.

September 15 - Prepared and print Design


2 Report

0 8 8 8 8
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (August 16-31, 2022)


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22 23 24 25

Laguindingan technopark DP1


2022-102-2063

Laguindingan technopark DP4 6 4


2022-101-2063
MDC

Laguindingan technopark
2022-117-2063

(2019-050-2063) Playa Laiya


LANDCO 2
West

WEE COM MAGNUM


INTALIO ESTATES SUBDIVISION 4 8 2
PROPERTIES
GENVI DEVELOPMENT CORP Monterazza De Cebu 6 8 8

8 0 0 8 8 8 8 8 0 0

Total Number of Hours 84

BENJIE P. BAGUINON
PROJECT MANAGER
(August 16-31, 2022)
REMARKS (WORKS DONE)
26 27 28 29 30
September 28 - Continuation of
updates in presmat

September 16 - Update Weir


dimension and Lift sizing for 10 to 25
yr RP
September 17 - Update Weir
dimension and Lift sizing for 50 to
100 yr RP

September 27 - Update details in


presmat
September 28 - Continuation of
updates in presmat and Update plans
based on RLA comments
8 8

September 16 - Prepare copies of


Tech. Specs
September 19 - Prepared BOQ/BCE
September 20 - Continuation of
BOQ/BCE
September 21 - Update BOQ/BCE
based on comments
September 21 - look for design
criteria files in the servers
September 22 - Start and study
General Catchments
September 23 - Plot water flow
direction on roads
Septmeber 24 - Work Suspension
due to bad weather
8 4 4
September 29 - Composed Letters for
utility providers
September 30 - Continuation of
letters for utility providers

8 8 8 8 4
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (August 16-31, 2022)


CLIENT ON-GOING PROJECTS
1 2 3 4 5 6 7 8 9 10 11

Monterazza De Cebu (2022-


GENVI DEVELOPMENT CORP 6 2 4
127-2063)

Laguindingan technopark
2 8
2022-117-2063

Laguindingan technopark DP1


8 2
2022-102-2063

MDC
Laguindingan technopark DP4
8 2
2022-101-2063

Laguindingan technopark DP5


8 2
2022-117-2063
Cavite Technopark Detention
Ponds
Alviera Detention Ponds

WCDI Residential Development


WEE COM MAGNUM
in Cagayan de Oro(2020-084- 4
PROPERTIES
2063)

DCCD ISO HOUR

(2018-027-2063) YRDC 19.40-


Yhest Realty and Development Ha. Davao Matina Business
Corporation Park Mixed-Use Dev't Project

(PP21-914) Sevina Park


Arthaland
Commercial Block

0 0 8 8 8 8 8 0 0 8 8

Total Number of Hours 80

BENJIE P. BAGUINON
PROJECT MANAGER
gust 16-31, 2022)
REMARKS (WORKS DONE)
12 13 14 15
October 3 - Plot water flow direction
on roads and attend coordination
meeting
October 10 - additional details in
letter for utility provider
October 11 - additional details in
4 letter for utility provider
October 12 - Calculate water demand
and sewer projections

October 3 - Continuation of updates


in presmat and Update plans based
on BPB comments
October 4 - Study Autodesk Civil 3D
4 October 13 - compiled and
coordinate files for project folder

October 5 - Plot detention pond 1 in


Civil 3D
October 10 - Continuation of
detention pond 1 in Civil 3D

October 5 - Plot detention ponds 4 in


Civil 3D
October 10 - Continuation of
detention pond 4 in Civil 3D

October 5 - Plot detention ponds 5 in


Civil 3D
October 10 - Continuation of
detention pond 5 in Civil 3D
October 15 - Study plans for Civil 3D

October 11 - Prepared blueprint


plans for signature

October 13 - Meeting for ISO Hour

October 11 - Prepared blueprint


plans for signature
4

October 13 - Compile Vaccination


Card Staff
2

8 8 8 0
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (August 16-31, 2022)


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22 23 24 25 26

(2022-142-2063) DLSU As-


Arthaland builting project 8 4 8 8 8 8 4 2

Monterazza De Cebu (2022-


GENVI DEVELOPMENT CORP 4 2
127-2063)

(2019-050-2063) Playa Laiya


LANDCO 4
West
WCDI Residential Development
WEE COM MAGNUM
in Cagayan de Oro(2020-084- 4
PROPERTIES
2063)

0 8 8 8 8 8 0 0 8 8 8

Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
ugust 16-31, 2022)
REMARKS (WORKS DONE)
27 28 29 30 31
October 17- Prepare keyplan and
checklist
October 18-Prepare materials for site
visit and coordinate with surveyors
October 19-Site visit
October 20-Site visit
October 21-Prepare As-built Report
October 22 - Continuation of As-built
Report
October 23- Revised As-built Report
base on comments
October 26- Additional Details for As-
4 8 built Report
Ocotber 27-Prepare As-built
Drawings
October 28 - Continuation of As-built
Drawings

October 18-Revise letter for utility


provider based on comments
October 26-Coordinate with CW
about baseplan with lot cuts

October 26-Prepared additional plans


October 26-Organize blueprint plans
4
October 25-Organize blueprint plans

October 31 - Special Non-working


Holidays
8

8 8 0 0 8
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CLIENT ON-GOING PROJECTS


1 2

(2022-142-2063) DLSU As-builting


Arthaland 8
project

Monterazza De Cebu (2022-127-


GENVI DEVELOPMENT CORP
2063)

8 8

Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
CUT-OFF PERIOD: (November 1-15, 2022)
3 4 5 6 7 8 9 10 11 12

8 8 2 8 4 8 8

6 4

8 8 0 0 8 8 8 8 8 0
13 14 15
November 2 - Prepare General sheets
November 3 - Additional Detail in As-built Plans
November 4 - Additional Details for As-built
drawings based on comments
November 7 - Continuation of as-built drawings
November 8 - Continuation of As-built drawings
and reports
November 9 - Revised As-built drawings based on
comments
November 10 - Prepare drainage study and
calculation
November 11 - Continuation of drainage study
and calculation

November 7 - Prepare necessary things for site


visit and Meeting with Clients
November 9 - Revised letters based on comments

November 14 - Site Visit


8 8 November 15 - Site Visit

November 1 - All Saint's Day (regular holiday)

0 8 8
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (November 16-27, 2022)


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22

GENVI DEVELOPMENT Monterazza De Cebu


8 4 6
CORP (2022-127-2063)

Arthaland (2022-142-2063) DLSU 4 2 4 8


As-builting project

Laguindingan
MDC technopark DP1 4
2022-117-2063

OVERTIME

GENVI DEVELOPMENT Monterazza De Cebu


4
CORP (2022-127-2063)

(2022-142-2063) DLSU
Arthaland As-builting project 4

12 8 12 0 0 8 8
Total Number of Hours 72

BENJIE P. BAGUINON
PROJECT MANAGER
(November 16-27, 2022)
REMARKS (WORKS DONE)
23 24 25 26 27
November 16 - Site Visit
November 17 - Compilation of Data from Site visit
November 18 - Study data from site visit, Minutes of
meeting
November 23 - Review given data from Utility
Provider (LGU)
6 4 November 25 - Review data from old Genvi Projects.

November 17 - Prepare drainage study and


calculation
November 18 - Prepare presmat for meeting
November 21 - Revised Presmat based on comments
November 22 - Meeting in DLSU, Minutes of meeting
November 23 - Additional data for minutes of
meeting
2

November 21 - Updating drawings based on RLA


comments
November 24 - Updating drawings based on DPM
comments
8 4 November 25 - Continuation of updates based on
comments

November 16 - 5pm to 9pm Site Visit

November 18 - 5 pm to 9pm Prepare Presmat

8 8 8 0 0
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (November 28 - Dece


CLIENT ON-GOING PROJECTS
28 29 30 1 2 3 4 5

GENVI DEVELOPMENT Monterazza De Cebu


4 4 2
CORP (2022-127-2063)

Sevina Detention Pond


Arthaland 4 6 6 8
(2022-140-2063)

(2022-142-2063) DLSU
Arthaland 4 2
As-builting project

Laguindingan
MDC technopark DP1
2022-117-2063
8

8 8 8 8 8 0 0 8

Total Number of Hours 112

BENJIE P. BAGUINON
PROJECT MANAGER
RIOD: (November 28 - December 15, 2022)
REMARKS (WORKS DONE)
6 7 8 9 10 11 12 13 14 15
November 28- Summarize data from data provider
November 29 - Gather related data from NR and PEAK
projects
December 1 - Email clients about utility provider
response
December 13 - Study and calculate existing water tank
design
4 8 December 15 - Continuation on existing water tank
and create schematic design. Revised letter in
response of utility provider.

November 28 - Compiling data related in this project


Decmber 1 - Start section for DP
December 2 -Continuation of Section for DP
December 5 - Revised section based on comments,
change depth to 3m and slope to 1:1 .Update
calculation for DP sizing.
December 6 - Start layout for DP outfall pipe
6 8 December 9 - Revised layout and section based on
comments

November 29 - Prepare material for transmittals


December 2 - Prepare transmittals
December 7 - Start layout for 2 options of proposed
drainage line from cim 230 - to outfall
4 8 4 December 12 - Change RCBC to step canal dissipator
December 13 - Revised layout based on comments

December 6 - Meeting with clients


December 7 - Draft minutes of meeting last dec. 6.
2 4
November 30 - Bonifacio's Day
December 8 - Feast of Immaculate Conception
8 8 December 14 - Division's Christmas Party

8 8 8 8 0 0 8 8 8 8
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (December 16 - 3


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22

GENVI DEVELOPMENT Monterazza De Cebu


4
CORP (2022-127-2063)

Sevina Detention Pond


Arthaland 4 4 4
(2022-140-2063)

(2022-142-2063) DLSU As-


Arthaland 4 4
builting project

Laguindingan technopark
MDC DP5 4
2022-117-2063
Maria Luisa Residential
Agro-Macro Dev't Corp Expansion Phase IX-A and 2
XI (2022-246-2063)

Nirwana Bali East (2018-


CLI 4
261-2063)

17-Ha. Mixed-Use Land


JVH Development Project 6
(2019-___-2063)

8 0 0 8 8 8 8

Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
FF PERIOD: (December 16 - 31, 2022)
23 24 25 26 27 28 29 30 31

4 8 1

1
4 1

4 8 8

8 0 0 8 8 8 8 8 0
REMARKS (WORKS DONE)
December 16 - Continuation on existing water tank and create
schematic design. Revised letter in response of utility provider.

December 19 - Generate Section profile perpendicular to Drain pipe


and outfall pipe
December 20 - Continuation of Section profile perpendicular to Drain
pipe and outfall pipe
December 21 - Continuation of Section profile perpendicular to Drain
pipe and outfall pipe
December 29 - Start another section for DP, Project Folder

December 16 - Generate Soil profile for option 1 and 2


December 20 - Continuation of Soil profile for option 1 and 2
December 27 - Start profiling for option 1
December 28 - Continuation of profiling for option 1
December 29 - Project Folder

December 19 - Compile Calculation based on DCCD format and


update to server
December 29 - Project Folder
December 22 - Kick Off Meeting
December 27 - Minutes of Meeting
December 29 - Project Folder

December 21 - Compile A3 plans

December 22 - Stamping and compilation of DD and SD plans (CW,


Water supply,Storm Drainage, Sewer)
December 23 - Stamping and compilation DD and SD plans (EE)

December 23 - Half-day Working day


December 26 - Special Non-Working Holiday after Christmas
December 30 - Rizal's Day
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEEljohn O. Empleo


EMPLOYEE NUMBE2203

CUT-OFF PERIOD: (January 1 - 15, 2023)


CLIENT ON-GOING PROJECTS
1 2 3 4 5 6 7 8 9

Sevina Detention Pond (2022-


Arthaland 4 6 4 4
140-2063)

(2022-142-2063) DLSU As-


Arthaland 4 4
builting project
17-Ha. Mixed-Use Land
JVH Development Project (2019-___- 1
2063)

Agro-Macro Dev't Maria Luisa Residential Expansion


3 2 1
Corp Phase IX-A (2023-008-2063)

Agro-Macro Dev't Maria Luisa Residential Expansion


3 2 1
Corp Phase XI (2023-009-2063)

Laguindingan technopark DP5


MDC 1
2022-117-2063

0 8 8 8 8 8 0 0 8

Total Number of H 80

BENJIE P. BAGUINON
PROJECT MANAGER
D: (January 1 - 15, 2023)
REMARKS (WORKS DONE)
10 11 12 13 14 15
January 4 - Start layout option of outfall
January 9 -Continuation of layout option of outfall
January 5 -Revise layout option of outfall based on
comments
January 6 - Revise layout option of outfall based on
comments
January 9 - Continuation of layout option of outfall
January 10 - Prepare computation of outfall line
January 11 - Revise layout option of outfall based on
comments
4 4 4

January 6 - Prepare calculation for rcbc and rcp


January 9 - Start profile for rcbc pipe
January 10 - Continuation of drainage profile
January 11 - Continuation of drainage profile
January 12 - Study and revised drainage profile based on
comments
January 13 - Revised drainage profile based on comments
4 2 4 4
January 3 -Prepare files to be emailed

January 3 - Organize cad file from client


January 4 - Create Xref file and TBlock
January 5 -Create project folder and upload drawings
January 11 - Prepare sheeting of G-02 and coordinate
drawings with CW
3

January 3 - Organize cad file from client


January 4 - Create Xref file and TBlock
January 5 -Create project folder and upload drawings
January 11 - Prepare sheeting of G-02 and coordinate
drawings with CW
3

January 3 - Prepare calculation for pump rating to be


email for client

January 2 - Special Non-working Holiday

8 8 8 8 0 0
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (January 16


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22

Sevina Detention Pond (2022-


Arthaland 4 3
140-2063)

(2022-142-2063) DLSU As-


Arthaland 4 3
builting project

GENVI DEVELOPMENT Monterazza De Cebu (2022-127-


8 8 4
CORP 2063)
Maria Luisa Residential Expansion
Agro-Macro Dev't Corp Phase IX-A and XI (2022-246-
2063)

Laguindingan technopark DP5


MDC 2 4
2022-117-2063

DCCD

8 8 8 8 8 0 0

Total Number of Hours 96

BENJIE P. BAGUINON
PROJECT MANAGER
T-OFF PERIOD: (January 16 - 31, 2023)
23 24 25 26 27 28 29 30 31

8 8 4 8 8 7 1
4 2

8 8 8 8 8 0 0 8 8
REMARKS (WORKS DONE)
January 16 -Revise layout option of outfall based on comment, Email
to client
January 19 - Meeting with Clients
January 31 - Minutes of meeting

January 16 -Revise layout option of outfall based on comment, Email


to client
January 19 - Meeting with Clients

January 17 - Gather information from previous project (NR and Peak)


January 18 - Gather information from previous project (NR and Peak)
January 20 - Coordinate plans and presmat with CW
January 23 - Compiled related information for design criteria
January 24 - Prepare presmat for a meeting
January 25 - Continuation of presmat for a meeting
January 26 - Revised presmat based on comments
January 27 - Add more details in presmat
January 30 - Meeting with clients, Compiled necessary information,
study EPANET.
January 31 - Minutes of meeting
January 25 - Coordination meeting with clients, minutes of meeting
and review related information
January 31 - Minutes of Meeting

January 19 - Coordinate with Ma'am Anita


January 20 - Coordinate plans with Ma'am Anita, Compiled
information
January 30 - Coordinate plans with CW and EE

January 31 - ISO hour


DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (February 1 - 1


CLIENT ON-GOING PROJECTS
1 2 3 4 5 6 7

Monterraza De Cebu - 40HA


6 4 4 4 4
(2022-127-2063)

Genvi

Monterraza Prime 2 (2023-016-


2 4 4 4 4
2063)

(2022-142-2063) DLSU As-


Arthaland
builting project

Overtime
Monterraza Prime 2 (2023-016-
Genvi
2063)
8 8 8 0 0 8 8

Total Number of Hours 90

BENJIE P. BAGUINON
PROJECT MANAGER
FF PERIOD: (February 1 - 15, 2023)
8 9 10 11 12 13 14 15

4 8 2

4 4 2 8 8

4 4

Overtime

8 8 8 0 0 8 8 10
REMARKS (WORKS DONE)
February 1 - Continuation of Presmat
February 2 - Additional Details for Presmat
February 3 - Client Meeting
February 6 - Minutes of Meeting
February 7 - Additional Notes for MOM
February 8 - Prepare EPANET
February 9 - Study water system of peak 1,2,3 using EPANET
February 13 - EPANET using MDD

February 1 - Study EPANET


February 2 - Coordinate with CW regarding existing utilities
February 3 - Draft Water Layout and Drainage Layout
February 6 - Water System Layout
February 7 - Water System Calculations
February 8 - Continuation of Water Calculations
February 10 - Study water system using epanet
February 13 - Continuation of EPANET using MDD
February 14 -Revised Layout based on new site grading
February 15 - Sewer and Drainage Calculations

February 10 - Respond to query


February 11 -Continuation of Respond to query

February 15 - Drainage calculations and Catchment area


DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (February 16-28, 2023)


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22 23

Monterraza Prime Phase 2 (2023-


016-2063) 8 4 4 4

Genvi

Monterraza De Cebu - 40HA 4 4 8 4


(2022-127-2063)

Priveya Hills Phase 5B (2023-034-


Aboitiz Land, Inc 4 4
2063)

Laguindingan technopark DP5


MDC
2022-117-2063

Sevina Commercial Block (2022-


Arthaland, Inc.
143-2063)

Overtime
8 8 0 0 8 8 8 8

Total Number of Hours 72

BENJIE P. BAGUINON
PROJECT MANAGER
: (February 16-28, 2023)
REMARKS (WORKS DONE)
24 25 26 27 28
February 16 - Drainage divide and Drainage pipe sizing, update
drainage and sewer details.
February 17 - Update drawing based on comments
February 20 - Update drawing based on client's comments
February 23 - Coordinate tech spec to CW and ma'am anita,
3 February 28 - Prepare necessary plans for transmital.

February 17 - EPANET Study (Northridge Area)


February 20 - Continuation of EPANET Study (Northridge Area)
February 21 - Water and Sewer Calculation
February 22 - Update EPANET Study (Northridge Area)
February 27 - Tank sizing, revise presmat based tank sizing, Client
meeting
8 3 February 28 - Consolidate presmat based on approved design criteria

Feruary 22 - Client meeting, Compile PM's Prc and Ptr


February 23 - Coordinate files to CW, G-02 sheeting, Coordinate
Drawings with Client

February 28 - Client meeting


1

February 28 - Client meeting


1

February 24 - Special Non-working Holiday


8

Overtime
8 0 0 8 8
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (March 1 - 15


CLIENT ON-GOING PROJECTS
1 2 3 4 5 6 7

Monterraza De Cebu - 40HA


8 4 3 1
(2022-127-2063)
Genvi

Monterraza Prime 2 (2023-016-


4
2063)

Priveya Hills Phase 5B (2023-034-


Aboitiz Land, Inc 2063) 4 4 4 7

Sevina Detention Pond (2022-


Arthaland 1
140-2063)

BRIDGEPORT DEVELOPMENT
Damosa Land PROJECT (2017-010-2060)

DCCD ISO Hour

8 8 8 0 0 8 8
Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
OFF PERIOD: (March 1 - 15, 2023)
8 9 10 11 12 13 14 15

6 3 8 4 6

2 3 1 8

4 1

8 8 8 0 0 8 8 8
REMARKS (WORKS DONE)
February 2 - Water Layout, Epanet, Coordinate reference files
February 3 - Update Epanet (PHD)
February 6 - Update Epanet (MHD)
February 7 - Client Meeting
February 8 - Water Layout for additional area, comments on details
February 9 - Check reference files from CW, update epanet
February 10 - Follow up and coordinate plans with CW, comment
water layout
February 13 - Coordinate Plans with CW, Update epanet
February 14 - Update epanet node elevations, calculations

February 1 - Prepare plans for submittal

February 1 - Check SDP, xref and G-02, coordinate reference files


February 3 - G-02 comments
February 6 - Details
February 7 - Prepare Permit plans, PTR and transmittal, Update G-02
based on comments

February 6 - Follow up client


February 8 - Follow up and coordinate with client
February 9 - Check reference files from client
February 14 - Check and Compile Drawings from Clients
February 15 - Sections

February 13 - Prepare necessary plans for printing


February 15 - Prepare permit plans for signages

February 9 - ISO Hour


DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (March 16-26, 2023)


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22 23

Monterraza Prime Phase 2 (2023-


016-2063) 4 4 4

Genvi

Monterraza De Cebu - 41HA 3 4 8 4 4


(2022-127-2063)

Sevina Detention Pond (2022-


Arthaland, Inc. 3 4 4
140-2063)

BRIDGEPORT DEVELOPMENT
Damosa Land 2
PROJECT (2017-010-2060)
Overtime

8 8 0 0 8 8 8 8

Total Number of Hours 56

BENJIE P. BAGUINON
PROJECT MANAGER
arch 16-26, 2023)
REMARKS (WORKS DONE)
24 25 26
March 21 - Drainage layout comments
March 22 - Water layout comments
March 23 - Drainage layout additional comments
March 24 - Edit comments

March 16 - Revised water calculation client approved criteria


March 17 - Continuation of water calculation
March 20 - Water Calc, Pump Sizing and edit Epanet
March 21 - EPANET (MDD)
March 23 - Water layout comments and calculations
March 24 - Water calc and epanet
2

March 16 - Option 1 Section


March 17 - Option 2 Section
March 22 - Edit layout based on comments

March 16 - Prepare plans for transmittal

Overtime

8 0 0
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (March


CLIENT ON-GOING PROJECTS
27 28 29 30 31 1 2 3

Monterraza De Cebu - 40HA


6 4
(2022-127-2063)

Genvi

Monterraza Prime 2 (2023-016-


8 4 8 4
2063)

Laguindingan technopark DP5


MDC 2
2022-117-2063

DLSU As-built Project (2022-142-


4 4
2063)
Arthaland

Sevina Detention Pond (2022-


4
140-2063)

8 8 8 8 8 0 0 8

Total Number of Hours 132

BENJIE P. BAGUINON
PROJECT MANAGER
CUT-OFF PERIOD: (March 27 - April 15, 2023)
4 5 6 7 8 9 10 11 12 13 14 15

4 4 4

4 2

4 4 2 4 8

4 8 8 8 8 8

8 8 8 8 8 8 8 4 8 8 8 0
REMARKS (WORKS DONE)
March 27 - Water calc and epanet
March 29 - Water Layout Comments
April 11 - Revised Layout Water Layout based on comments
April 12 - Additional comments on water layout

March 28 - Detention facility calc and drainage schematic Diagram,


additional node for additional area
March 29 - Drainage Layout Comments and DP Capacity
March 30 - Revised Drainage Layout and Comments
April 3 - Drainage Profile
April 4 - Drainage Profile
April 12 - Drainage Layout Comments and profile

March 27 - Coordinate plans to EE

March 31 - Remove manholes based on clients comment


April 3 - Response to query no. 2
April 4 - Response to query no. 2
April 13 - Response to query no. 3
April 14 - Revised layout and coordinate tech specs

March 31 - Edit Drainage Layout based on approved layout

April 5 - Half day


April 6-9 - Holy Week
April 10 - Regular Holiday (Day of Valor)
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (April 16 - 30, 2023)


CLIENT ON-GOING PROJECTS REMARKS (WORKS DONE)
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
April 17 - Comments on water and drainage/submission of permits
plans(pdf)
April 18 - Print draft final plans for trb and organize project folder
April 20 - Update presmat based on permit plans
April 24 - Update plans based on client's comment
Monterraza De Cebu - 40HA April 25 - Continuation of updating
8 4 4 8 4 8
(2022-127-2063) April 26 - Update plans based on trb comments
Genvi

April 18 - Print draft final plans for trb and organize project folder
April 27 - Update plans based on trb comments
Monterraza Prime 2 (2023-016- April 28 - Continuation on trb Comments
4 6 8
2063)

April 19 - Organize Project and print necessary files


DLSU As-built Project (2022-142-
2063) 3
Arthaland
April 19 - Organize Project and print necessary files
Sevina Detention Pond (2022- 3
140-2063)
April 19 - Coordinate plans with CW
April 20 - Drainage Layout
Agro-Macro Dev't Corp Maria Luisa Residential Expansion
Phase IX-A (2023-008-2063) 2 4 4 April 25 - Cover, G-01, G-02 comments

OVERTIME
April 17 - Comments on water and drainage/submission of permits
Monterraza De Cebu - 40HA plans(pdf)
GENVI 2
(2022-127-2063)

April 21 -Eid al fitr (adjusted holiday)


April 27 - HEALTHY LIFESTYLE SEMINAR
8 2

0 10 8 8 8 8 0 0 8 8 8 8 8 0 0

Total Number of Hours 82

BENJIE P. BAGUINON
PROJECT MANAGER
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (May 1 - 15, 2023)


CLIENT ON-GOING PROJECTS REMARKS (WORKS DONE)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
May 3 - Prepare Plans for signing
Monterraza De Cebu - 40HA May 11 - Draft Final Report
2 4 4 May 12 - Continuation Draft final Report
(2022-127-2063)

May 2 - Utility Corridor and Catchment Area Update


May 3 - Guide CAD Op in W-00
May 4 - Compiled Plans
Monterraza Prime 2 (2023-016- May 5 - UC Comments
8 2 4 4 4 6 May 12 - Coordinate Tech Specs
2063)
Genvi May 15 - PDF and Bind Plans

May 3 - Water Tabulation of development areas


May 5 - Epanet
May 8 - Epanet and Excel Tabulation
Monterraza De Cebu - 72HA May 9 - Epanet and Excel Tabulation
4 4 6 6 8 4 May 10 - Epanet and Excel Tabulation
(2023-029-2063)
May 11 - Water tabulation for existing and future dev

May 4 - Revised Plans based on comments


Maria Luisa Residential Expansion May 6 - Coordinate CW
Agro-Macro Dev't Corp 4 2 2
Phase IX-A (2023-008-2063) May 7 - Profiles

May 1 - Labor Day


DCCD ISO Hour 8 2 May 9 - ISO Hour

8 8 8 8 8 0 0 8 8 8 8 8 0 0 8

Total Number of Hours 88

BENJIE P. BAGUINON
PROJECT MANAGER
DCCD ENGINEERING CORPORATION
DIVISION: Environmental Engineering

WORK ACCOMPLISHMENT REPORT

NAME OF EMPLOYEE: Eljohn O. Empleo


EMPLOYEE NUMBER: 2203

CUT-OFF PERIOD: (May 16 - 31,


CLIENT ON-GOING PROJECTS
16 17 18 19 20 21 22 23
Monterraza De Cebu - 40HA
(2022-127-2063)

Monterraza De Cebu - 72HA


4 4 4 4 4
(2023-029-2063)

Genvi

Monterraza Prime 3 (2023-016-


4 4 4 4 4
2063)

Maria Luisa Residential Expansion


Agro-Macro Dev't Corp
Phase IX-A (2023-008-2063)

OVERTIME/LEAV
8
8 8 8 8 0 0 8 8

Total Number of Hours 96

BENJIE P. BAGUINON
PROJECT MANAGER
F PERIOD: (May 16 - 31, 2023)
REMARKS (WORKS DONE)
24 25 26 27 28 29 30 31
May 29 - Compilation of Permit plans
2 2 May 30 - Compilation of permit plans

May 16 - Epanet and Excel Tabulation


May 17 - Baseplan overlay
May 18 - Stud Namria Map
May 19 - Water Projection Calculation
May 23 - Water Projection Calculation
May 24 - Masterplanning Report
May 25 - Masterplanning Report
8 4 4 4 4 8 May 26 - Masterplanning Report
May 29 - Masterplanning report
May 30 - Masterplanning Report
May 31 - Site Visit

May 16 - PDF and Bind Plans


May 17 - Coordinate Tech specs Changes
May 18 - Compilation of FCD Plans and Tech specs
May 19 - Compile and Reflect existing water layout
2 2 May 23 - Water and drainage layout draft
May 29 - Water Layout Comments
May 30 - Drainage Layout Comments

May 25 - Layout and Profile


May 26 - Layout and Profile
4 4

OVERTIME/LEAVE
May 22 - Sick Leave

8 8 8 0 0 8 8 8