SULTANATE OF OMAN

SPECIAL ECONOMIC ZONE


AUTHORITY AT DUQM

www.duqm.gov.om
1. INTRODUCTION
2. ACCESSIBILITY TO DUQM
3. SEZAD PREVIOUS MASTERPLAN
4. DUQM URBAN PLANNING
5. SPECIAL ECONOMIC ZONE DISTRICTS
6. SEZAD PROJECT TENDERING PROCESSES
7. SEZAD’S PROJECTS
8. PROJECT DISTRIBUTION
9. ROAD NETWORKS
10. DUQM RENEWABLE ENERGY
11. OMAN RAIL WAY TO DUQM
12. DUQM AIRPORT ZONE

2
Duqm Special Economic Zone Authority (SEZAD) was established by Royal Decree No.
(119/2011) in 2011 to:
- Manage, regulate, and develop all economic activities in Duqm.
- Plan, design, and implements long-term strategies for infrastructural development.
- Attract investments to promote a wide spectrum of economic activities.
- Oversee the urban expansion of the modern Duqm city while protecting the
environment, thereby ensuring Duqm its rightful place as the best location to visit, live,
work, and invest in the Middle East. 3
ACCESSIBILITY TO DUQM

Duqm is appx. (550 km) from


Muscat (the capital) and almost
same distance from Salalah.
Duqm is accessible through:

• Muscat – Salalah Road via


Hayima (by Road)

• Muscat - Sinaw – Mahout–


Duqm (by Road)

• Muscat - Sur – Mahout –


Duqm (by Coastal Road)

• Via Port of Duqm (by Sea)

• Planned Oman Railway


Network 4
SEZAD PREVIOUS
MASTERPAN

10
8
2 7
1
9
6
3
4 5
SEZAD have recently completed the urban planning study
for the Zone at Duqm by as specialized consultant

Services & Waste


Logistics Land use
Utilities treatment

6
MASTERPLAN LAND USE
Total area: 1745km2
Seafront: 60km

8
SPECIAL ECONOMIC ZONE
DISTRICTS

Rock Garden District

City Center District

Coastal District

Airport district

Civic District

Light & medium Industry

Heavy Industry
SEZAD PROJECT
TENDERING PROCESSES

 SEZAD Tender process and procedures are transparent.


 SEZAD Tender Committee (STC) is authorized party to run the tendering
processes

Tender Tender Tender Tender Tender


Document Announce Opening Evaluation Award

• Scope of • Newspaper • STC • Technical • STC


work (L&I) Decision • Financial Approval
• Evaluation • SEZAD • SEZAD • Award
criteria website Website

12
SEZAD’S PROJECTS

Projects Status

Projects Planned for Completed Projects


2015 to 2020

25%
28%

On-going Projects

26% 15%

3% 3% Projects under Evaluation &


Award Process
Projects under Scope of Works &
Tender Document Preparation

Projects under Tender Process 13


SEZAD’S PROJECTS

Number of Projects
0 5 10 15 20 25 30 35

COMPLETED PROJECTS 29

ONGOING PROJECTS 15

PROJECTS UNDER EVALUATION AND AWARDING


3
PROCESS

PROJECTS UNDER TENDERING PROCESS 3

PROJECTS UNDER SCOPE OF WORKS PREPARATION 26

PROJECTS PLANNED FOR 2015 TO 2020 25


14
SEZAD’S PROJECTS
MAIN COMPLETED
PROJECTS
Duqm Dry Dock (Super
Port of Duqm (Marine
Structures, Civil and
Works)
Marine Works)

Frontier Town Project


Crown Plaza Hotel
(phase1)

Temporary Fishing
Duqm City Hotel
Facilities (Building)

Temporary Fishing
Rock Garden Fencing
Facilities (Ice Factory)
SEZAD’S PROJECTS
MAIN COMPLETED
PROJECTS

Expansion of Duqm
Jalowni Airport
Hospital

Duqm Airport (P1 & Water Supply


P2) Network (Phase1)

Desalination and
Electricity Supply
Power Plant
Network (Phase 1)
(temporary)

Sewage Treatment Internal Roads


Plant (Roads 2 and 3)
SEZAD’S PROJECTS
MAIN COMPLETED
PROJECTS

Street Light of Road 2 & 3


Nafun Road
At New DUQM Town

Conducting Topographic
Survey, and Soil
The Urban Design Master
Investigation, Sampling
Plan for Duqm Town
and Testing for the
Industrial Zones at Duqm

DUQM Survey Land Marking for SEZAD


Monuments Sub-division Plan

SUPPLY OF AERIAL
Services to Provide a 3-D
PHOTOS OR
Physical Model of Special
SATELLITE IMAGERY
Economic Zone at Duqm
FOR SEZAD PROJECTS
SEZAD’S PROJECTS
ON-GOING
► ON-GOING

Target
S.N. PROJECT TITLE Actual Start
Finish

T3/2013 - Consultancy Services for Design and Supervision of Main


1 9-Dec-13 14-Sep-14
Road Improvement at Duqm Center
T2/2013 - Consultancy Services for Design & Supervision of Roads &
2 16-Dec-13 22-Sep-14
Infrastructure in Town of Duqm-Package 1
Provision of Consultancy Services (Design Only Without
3 Construction Supervision) for the Proposed Grading Works at the 13-Apr-14 28-Aug-14
Heavy Industrial Zone in Duqm
T23/2013-Consultancy Design of the Shoreline & Coastal Protection
4 Project for the Duqm Special Economic Zone 24-Apr-14 29-May-15

T1/2013 -Consultancy Services For Feasibility Study, Detailed Design


5 And Construction Supervision Of Duqm Development Drainage 9-Dec-13 8-Sep-14
Network And Protection Schemes – Phase 1
T13/2013-Consultancy FEED, Feasibility Study Supply and Disposal
6 7-Apr-14 21-Sep-15
of Seawater to the Industrial Zone at Duqm Tender

7 T9/2013 - Construction of 150 Housing Units 23-Jan-14 23-Aug-15

T2/2014-Consultancy Services for Design & Supervision of the New


8 21-May-14 28-Jan-15
Municipal Market Project at Duqm
SEZAD’S PROJECTS
ON-GOING
T4/2014-Consultancy Services for Design & Supervision of Interface
9 15-Jun-14 20-Oct-14
Roadway Projects in Duqm (4 SECT)

10 T14/2013-Airport Project Phase 3 (Buildings) 30-Jun-14 29-Jun-16

11 T3/2014-SEZAD Headquarter Building at Duqm 9-Jul-14 12-Oct-15

T7/2013-Consultancy Services For Planning, Feasibility Study,


Preliminary And Final Design, And Preparation Of Tender Documents
12 24-Aug-14 27-Dec-15
For The Development Of The Northern And Central Industrial Zones
At Duqm

T152/2012-Construction of Water Network Supply to Port of Duqm


13 9-Jul-14 31-Dec-15
PAEW Concept

T9/2014-Consultancy Services for Project Definition, FEED and


14 17-Aug-14 15-Jul-18
Supervision of the New Liquid Bulk Berths in the Port of Duqm

Consultancy Services for Design & Supervision of Roads &


15 23-Jan-14 30-Oct-14
Infrastructure for 150 Housing Project
SEZAD’S PROJECTS
PROJECTS UNDER TENDER
PROPOSAL EVALUATION & AWARD
PROCESS
► PROJECTS UNDER TENDER PROPOSAL EVALUATION & AWARD PROCESS

S.N. PROJECT TITLE


Start Finish

T82/2013-Consultancy Supervision of Water Network Supply to


1 28-Jul-13 31-Dec-15
Port of Duqm PAEW Concept)

T1/2014-Consultancy for Design of SEZAD Staff


3 1-Jul-14 30-Aug-14
Accommodation & Recreation at Duqm

T6/2014 Design, Fabricate & Install SEZAD Directional Sign


4 25-Mar-14 13-Sep-14
Boards around the Sultanate of Oman
SEZAD’S PROJECTS
PROJECTS UNDER TENDERING
PROCESS

► PROJECTS UNDER TENDERING PROCESS

S.N. PROJECT TITLE Start Finish

1 T10/2014 EPC for the Airport Access Street Lightings System 12-Jun-14 28-Aug-14

T11/2014 Consultancy Services for Construction Supervision of IP4 at Port of


2 15-Jul-14 19-Sep-14
Duqm

3 T18/2013 Construction of Duqm Port Package IP4 (Government Berth) 10-Aug-14 19-Sep-14
SEZAD’S PROJECTS
PROJECTS UNDER SCOPE OF WORK
&TENDER DOCUMENTS
PREPARATION
► PROJECTS UNDER SCOPE OF WORK & TENDER DOCUMENTS PREPARATION

S.N. PROJECT TITLE Start Finish

1 T13/2014-Consultancy Services for Const. Supervision of IP2 at Port of Duqm 1-Jul-14 31-Aug-14

2 T16/2013-Construction of Duqm Port Package IP2 (Commercial Berth-Zone 3 & 4) 30-Sep-13 29-Sep-14

3 T12/2014-Consultancy Services for Const. Supervision of IP3 at Port of Duqm 1-Jul-14 31-Aug-14

4 T17/2013-Construction of Duqm Port Package IP3 (Commercial Berth-Zone 1 & 2) 30-Sep-13 29-Sep-14

5 T19/2013-Duqm Port Package IP5 (Main Port Admin. Bldg. & Fencing) 30-Sep-13 20-Sep-14

6 T20/2013-Duqm Port Package IP6 (Storage Area) 10-Feb-13 20-Sep-14


7 Consultancy for Design of Industrial Fisheries Hub 30-Sep-13 30-Sep-14
Consultancy Services for Design & Supervision of the Service Corridor for Duqm
8 17-Nov-13 31-Aug-14
Refinery
Consultancy Services for Design & Supervision of the Service Corridor for Oil,
9 17-Nov-13 27-Aug-14
Gas & Petrochemical Pipeline Project
10 Consultancy for Design of Rock Garden Development Project 26-Dec-13 20-Sep-14

11 T6/2013-Landscaping Project for Road # 2 and Road # 3 at Duqm 1-Jul-13 20-Sep-14

12 Consultancy for Design of Integrated Landfill for Duqm 15-Dec-13 30-Sep-14


SEZAD’S PROJECTS
PROJECTS UNDER SCOPE OF WORK
&TENDER DOCUMENTS
PREPARATION
T8/2014-Consultancy Services for Planning, Feasibility Study, Preliminary and
13 Final Design and Preparation of Tender Documents for the Development of the 14-Feb-14 28-Aug-14
Commercial and Residential Zones at Duqm

Consultancy for Design of the Sewerage Network System & Sewage Treatment
14 17-Nov-13 9-Sep-14
Plant (Residential & Commercial Zone)

T5/2014 Consultancy Services for the Design & Supervision of Roads No. 1 & 5
15 1-Apr-14 26-Sep-14
and Drainage Systems Construction at Duqm Port

T7/2014 Consultancy for Design of Utilities (Electricity, Water & Sewerage)


16 27-Mar-14 14-Sep-14
Network at the Industrial Zone, Duqm

T14/2014 Consultancy Services for Design and Supervision of SEZAD Branch


17 19-Jun-14 31-Aug-14
Building in Muscat

18 Construction of Channel Dangert 1 in SEZ Duqm 29-Jun-14 28-Aug-14

Consultancy Services for the Design & Supervision of Grading Works @ Light
19 28-Aug-14 27-Oct-16
Industrial Zone (100 Hectares)

20 Consultancy Services for Design & Surpervision of Duqm Private School 28-Aug-14 23-Mar-17

21 Training Center 28-Aug-14 23-Mar-17

22 Consultancy Services for Design & Surpervision of Duqm Public Parking 28-Aug-14 23-Mar-17
SEZAD’S PROJECTS
PROJECTS UNDER SCOPE OF WORK
&TENDER DOCUMENTS
PREPARATION

Consultancy Services for Design & Surpervision of Duqm Main


23 28-Aug-14 23-Sep-17
Mosque

Consultancy Services for Design & Surpervision of Civil Defense Unit


24 28-Aug-14 23-Mar-17
in Duqm

Consultancy Services for Design & Surpervision of Bus and Taxi 23-Mar-
25 28-Aug-14
Station in Duqm 2017

Consultancy Services for Supervision for construction of fishery


26 01-Oct-14 01-Oct-16
harbor
SEZAD’S PROJECTS
PROJECTS SCHEDULED FOR
2015-2020
► SEZAD PROJECTS SCHEDULED FOR (2015 to 2020)

Planned
S.N. PROJECT TITLE Planned Start
Finish

1 Coastal Development 2-May-15 10-Apr-19


2 Roads Network System & Rail Road Project (Phase 2 ~ N°) 12-Jul-15 19-Aug-20
3 Marina Project 17-Jul-15 28-Aug-18
4 Sewage Treatment Plant (Medium / Light Industrial Zone) 20-Jul-15 22-Mar-18
5 Communication Supply Network System (Industrial Zone) 20-Jul-15 15-Jun-18
6 Custom Checkpoint Facilities 29-Sep-15 13-Jul-18
7 Town Center / Retail Phase 1 29-Oct-15 30-Sep-20
8 Street Light 15-Nov-15 11-Apr-19
9 Commercial Center Building 13-Dec-15 27-May-20
10 Water Supply Network for Commercial & Residential 13-Dec-15 27-Aug-19

11 Communication Network System for Commercial & Residential 13-Dec-15 7-Nov-19

12 Electrical Supply Network for Commercial & Residential 13-Dec-15 19-Dec-19


13 Construction of Gas Supply Networks 13-Dec-15 19-Aug-20
14 Road Markings & Signs and Traffic Signals 7-Feb-16 4-Jul-19
15 Store Buildings & Small Industrial Buildings 3-Mar-16 23-Oct-18
16 Pedestrian Crossing & Safety Barriers 12-Jun-16 7-Nov-19
SEZAD’S PROJECTS
PROJECTS SCHEDULED FOR
2015-2020

17 Boundary Security Fencing for Special Economic Zone at Duqm 30-Jun-16 5-Aug-19

18 Construction of Solid Waste Facilities / Landfill for Solid Waste 30-Jun-16 12-Jul-20

19 Hospital / Clinic 30-Jun-16 27-Jul-20

20 Slope Protection 16-Oct-16 19-Aug-19

21 Landscaping (Phase 2 ~ N°) 8-Jan-17 4-Jun-20

22 Drainage Network System-Phase 2 22-Oct-17 21-Oct-20

23 Integrated Sports Center 10-Nov-16 22-Jul-19

24 Social Community Center 20-Jul-17 10-Mar-20

25 Recreational Facilities 23-Nov-17 14-Jul-20


SEZAD’S PROJECTS
RELATED PROJECTS

Fish Processing Industries

Port of Duqm Infrastructure Projects

Duqm Airport Services

Drydock Subcontracting and Supply

O&M of Duqm STP

Logistics (warehouse, stores, transport services, etc)

Minerals Exploration and Processing


PROJECTS DISTRIBUTIONS

Projects for Industrial & Petrochemical Zones

Projects for Commercial and Residential Zones

Projects for Services, Utilities and Drainage systems

Projects for Logistics and Storages

Projects for Community (Local) Development

Projects for Tourism Development

Projects for Environmental Monitoring 28


SEZAD will provide services for the industries including the
petrochemicals through Central Utilities Companies (CUC)

Industrial Cooling
Electricity Sewage Communication Gas Waste Steam
water water

29
=

30
CONECTIVITY
PORT FROM/TO AIRPORT

FISHERIES
PORT Port to Airport
33 Km
Dual carriage way
3 lanes each way
PORT
Medium Industry

Light Industry/
Logistics

Port Road No. 1 &


Road 2 north to
AIRPORT
Commercial Berth
11.5 Km

Dual carriage way


SAAY
VILLAGE 3 lanes each way
Exceptional Vehicles
(15 X 15)
DUQM RENEWABLE
ENERGY AREA
Maximum
capacity at
Phase 5
coming from
renewable is
approx.
400MW

32
OMAN RAILWAY TO DUQM

Offering services for:


• Freight transport
• Passenger transport
(long-distance and
suburban)
• Intermodal services33
DUQM AIRPORT

Package 3: Buildings EARLY OPERATION


Passenger terminal Building for 500,000
Pax., Air traffic Control complex of 39m Early operation of Duqm Airport started
High, Cargo Terminal with 25,000tons on 23 July, 2014
Capacity, GSE maintenance centre and Fire Package 3 was awarded to specialized
Training Area & Related Civil Works contractor
THANK YOU

www.duqm.gov.om