E2 Conduct V. Bangcoyo
b. Conduct Validation of RI Projects RSMDC Conduct R. Apugan in accordance with DO65-
(Road Slope Management Projects) 7 wd 80%-89.99% 7 wd
E2 Conduct M. Ibrahim 14
c. Conduct Validation of RI Projects BMSDC Conduct J. Dela Peña
(Bridge and Flood Control Projects)
E2 Conduct R. Apugan in accordance with DO65-
7 wd 80%-89.99% 7 wd
E2 Conduct J. Tabamo 14
III. ENGINEERING SURVEYS AND INVESTIGATION UNIT, HIGHWAY DESIGN UNIT, AND BRIDGES & OTHER PUBLIC WORKS DESIGN UNIT
CONDUCT OF DETAILED ENGINEERING ACTIVITIES
2.4 Review preliminary design scheme and HDE Review and Discuss J. Poserio Jr.
Discuss with the Designer the
Comments and Suggestions BOPWDE Review and Discuss J. Dela Peña
c.) Electrical
Drawings BOPWDE Review and Discuss R. Apugan in accordance with DGCS,
1 wd 80%-89.99% 1 wd
BOPWDE Review and Discuss M. Desabille Bridge Repair Manual
2.5b. Finalize Road Slope Protection Design BOPWDE Finalize Design R. Apugan
Scheme:
a.) Rectify Preliminary Road Design E2 Prepare M. Ibrahim
Scheme
b.) Design of Road Sections and
Structure Details 4 wd/km In accordance to DGCS 80%-89.99% 4 wd/km
c.) Preparation of Drawings and
Specification in Standard Sheets
d.) Prepare and Compute Back-up
Summary of Quantities
2.5e Finalize Building and Other Infra. Design E2 Finalize Design - Structural O. Oclaret
Scheme
a.) Rectify Preliminary Design Scheme A2 Finalize Design - Architectural M. Desabille
b.) Preparation of Drawings and E2 (EE) Finalioze Design - Electrical E. Sison
Specification in Standard Sheets 5 wd In accordance to DGCS 80%-89.99% 5 wd
c.) Prepare and Compute Back-up A2 Prepare J. Salarda
Summary of Quantities
A2 Prepare G. Dalapo
A2 Prepare F. Eugenio
2.60 Review, Evaluate, Print and Submit Final HDE Review and Submit J. Poserio Jr.
Design Plan
BOPWDE Review and Submit J. Dela Peña
6 hours
BOPWDE Review and Submit R. Apugan In accordance to DGCS 80%-89.99% 1 wd
BOPWDE Review and Submit M. Desabille
DPE Review and Submit H. Caermare 2 hours
2.70 Recommend Approval
in accordance with DO56-
ADE Recommend M. Cabeguin 30 mins. 80%-89.99% 30 mins.
95
2.80 Approved the Final Design Plan
in accordance with DO56-
DE Approved M.F. Ong 30 mins. 80%-89.99% 30 mins.
95
2.90 Recording and Safekeeping of file copy
Approved Detailed Engineering Design AA3 File J. Salvani 3 mins. Recorded & Filed 80%-89.99% 3 mins.
Plan
JOSE R. POSERIO JR. HAROLD C. CAERMARE RONALD T. GEMPISAO LIBERATO S. TAN, JR.
Asst. Chief, PDS Chief, Planning & Design Section Assistant District Engineer District Engineer
Page 16
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
III. ENGINEERING SURVEYS AND INVESTIGATION UNIT, HIGHWAYS DESIGN UNIT, BRIDGES & OTHER PUBLIC WORKS DESIGN UNIT
CONDUCT OF DETAILED ENGINEERING ACTIVITIES
1. Plotted Survey 1.1 80% of Memorandum for conduct of survey,
Data Prepared, Checked and Approved in 1 hour, Q no error minor error major error
with minor error
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 0.6 hours 0.8 hours 1.0 hours 1.2 hours 1.4 hours
1.2 80% of Survey Teams Logistics, Organized In accordance
In accordance with Not in accordance
and Prepared in 2wd in accordance with Q with
Memorandum with Memorandum
memorandum Memorandum
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 1.2 wd 1.6 wd 2.0 wd 2.4 wd 2.8 wd
1.3
80% of Preliminary Investigations and Route
In accordance In accordance with Not in accordance
Surveys for 57 Projects Conducted in 3 Q
with DGCS DGCS with DGCS
wd/km per project, in accordance with DGCS
Page 18
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
2.2b 80% of Results for Test-Pitting and Subsurface
In accordance In accordance with not in accordance
Exploration, Received and Prepared Bridge Q
with DGCS DGCS with DGCS
Design Analyses and Design Parameters in
10wd +5/span in accordance with DGCS E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 6.0 wd + 5/span 8.0 wd + 5/span 10.0 wd + 5/span 12.0 wd + 5/span 14.0 wd + 5/span
2.2c 80% of Results for Test-Pitting and Subsurface
In accordance In accordance with not in accordance
Exploration, Received and Prepared Flood Q
with DGCS DGCS with DGCS
control Design Analyses and Design Parameters
in 6.0 wd/km in accordance with DGCS E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 3.6 wd/km 4.8 wd/km 6.0 wd/km 7.2 wd/km 8.4 wd/km
2.2d 80% of Results for Test-Pitting and Subsurface
In accordance In accordance with not in accordance
Exploration, Received and Prepared Buildings Q
with DGCS DGCS with DGCS
and Other Public Works Design Analyses and
Design Parameters in 3 wd/bldg. in accordance E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
with DGCS T 1.8 wd/bldg. 2.4 wd/bldg. 3.0 wd/bldg. 3.6 wd/bldg. 4.2 wd/bldg.
2.3a
80% of Preliminary Road Design Scheme for
0.54 KM / 2.16 Lane KM of OO1 - Asset
In accordance to In accordance to Not In accordance
Preservation - Preventive Maintenance - Q
DGCS DGCS to DGCS
Secondary Roads, Prepared in 4wd/km in
accordance with DGCS
Page 19
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
2.3e 80% of Preliminary Bridge Replacement Design
Scheme for 4 Bridges of OO1 - Bridge -
Rehabilitation/ Major Repair of In accordance to In accordance to
Permanent Bridges, Prepared in 10wd Q
DGCS DGCS
+5/span per project in accordance with DGCS
Page 20
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
2.3j 80% of Preliminary Bridge Replacement Design
Scheme for 65.68 sq.m. of CSSP -
Sustainable Infrastructure Projects
Alleviating Gaps (SIPAG) - Access Roads
and/or Bridges from the National Road/s In accordance to In accordance to
Q
leading to Major/ Strategic Public DGCS DGCS
Buildings/ Facilities, Prepared in 10wd
+5/span in accordance with DGCS
Page 21
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
T 10.8 wd 14.4 wd 18.0 wd 21.6 wd 25.2 wd
Page 22
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
2.4 80% of Preliminary Design Scheme, Reviewed
and Discussed with the Designer the In accordance to In accordance to Not In accordance
Q
Comments and Suggestions in 1 wd, in DGCS DGCS to DGCS
accordance with DGCS
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 0.6 wd 0.8 wd 1.0 wd 1.2 wd 1.4 wd
2.5a 80% of Road Design Scheme , Finalized in 4 In accordance to In accordance to Not In accordance
Q
wd/km, in accordance with DGCS DGCS DGCS to DGCS
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 2.4 wd/km 3.2 wd/km 4.0 wd/km 4.8 wd/km 5.6 wd/km
2.5b
80% of Road Slope Protection Design Scheme, In accordance to In accordance to Not In accordance
Q
Finalized in 4 wd/km, in accordance with DGCS DGCS DGCS to DGCS
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 2.4 wd/km 3.2 wd/km 4.0 wd/km 4.8 wd/km 5.6 wd/km
2.5c 80% of Bridge Design Scheme, Finalized in 8
In accordance to In accordance to Not In accordance
wd, in accordance with DGCS, Bridge Repair Q
DGCS DGCS to DGCS
Manual
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 4.8 wd 6.4 wd 8.0 wd 9.6 wd 11.2 wd
2.5d
80% of Flood Control Design Scheme, In accordance to In accordance to Not In accordance
Q
Finalized in 4 wd/km, in accordance with DGCS DGCS DGCS to DGCS
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 2.4 wd/km 3.2 wd/km 4.0 wd/km 4.8 wd/km 5.6 wd/km
2.5e 80% of Building and Other Infra. Design
In accordance to In accordance to Not In accordance
Scheme, Finalized in 5 wd, in accordance with Q
DGCS DGCS to DGCS
DGCS
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 3.0 wd 4.0 wd 5.0 wd 6.0 wd 7.0 wd
2.6
80% of the Final Design Plan for 57 Projects
In accordance to In accordance to Not In accordance
Reviewed, Evaluated, Printed and Submitted in Q
DGCS DGCS to DGCS
1 wd per project, in accordance to DGCS
Page 23
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
2.9 80% of 57 Approved DED Plans recorded and recorded and Not recorded and
Q recorded
filed in 3 mins per project. Filed Filed
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 1.8 mins 2.4 mins 3.0 mins 3.6 mins 4.2 mins
3. Approved POW, 3.1 80% of Approved Plans,Quantities and
DUPA and ABC References, Received and Secured in 1 hour Q no error minor error major error
Page 24
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
3. Daily Time Record 3.1 80% of DTR prepared in 30 mins, with minor
Q no error minor error major error
error
E 100% 90% - 99.99% 80% -89.99% 70% -79.99% below 70%
T 18.0 mins 24.0 mins 30.0 mins 36.0 mins 42.0 mins
Page 25
DUE DATE STANDARDS
MAJOR FINAL OUTPUT SUCCESS INDICATOR Q/E/T
(Timeline) 5 4 3 2 1
JOSE R. POSERIO JR. HAROLD C. CAERMARE RONALD T. GEMPISAO LIBERATO S. TAN, JR.
Asst. Chief, PDS Chief, Planning & Design Section Assistant District Engineer District Engineer
Page 26
GENERAL APPROPRIATIONS ACT 2021
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
Page 27 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
DISTRICT PROJECTS
a. ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
1. Asset Preservation Program
a. Preventive Maintenance - Primary Roads
Butuan City-Cagayan de Oro City-Iligan City Rd - K1383 + 528 - K1383 + 633, K1387 +
1 8,148 0.6930 Lane Km
273.44 - K1387 + 515
2 Gingoog- Claveria - Villanueva Rd - K 1327 + 000 - K 1327 + 813 20,000 3.2520 Lane Km
3 Butuan City-Cagayan de Oro City-Iligan City Rd - K1315 + 000 - K1315 + 519 40,351 3.7020 Lane KM
d. Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
4 Butuan City-Cagayan de Oro City-Iligan City Rd - K1281 + (-050) - K1281 + 100 25,000 1114.5050 Sq.m.
5 Butuan City-Cagayan de Oro City-Iligan City Rd - K1312 + 440 - K1312 + 550 30,000 1815.0000 Sq.m.
6 Butuan City-Cagayan de Oro City-Iligan City Rd - K1397 + 718 - K1397 + 818 25,000 882.6200 Sq.m.
7 Butuan City-Cagayan de Oro City-Iligan City Rd - K1397 + 918 - K1398 + 018 50,000 1878.6700 Sq.m.
e. Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
9 Butuan City-cagayan de Oro City-Iligan City Rd - K1302 + (-600) - K1302 + 992 50,000 3.1840 Lane KM
10 Butuan City-cagayan de Oro City-Iligan City Rd - K1304 + 261 - K1305 + 460 35,987 2.4060 Lane KM
Butuan City-cagayan de Oro City-Iligan City Rd - K1306 + 976 - K1307 + 359, K1307 +
11 40,000 2.4460 Lane KM
539 - K1308 + 377
12 Gingoog Bypass Road (Phase 6), Misamis Oriental 50,000 288.0000 Sq.m.
13 Gingoog Bypass Road (Phase 7), Misamis Oriental 55,000 1.1200 Lane KM
3. Bridge Program
a. Replacement of Permanent Weak Bridges
Kibaluyot Br. (B01345MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
14 100,000 1206.8000 Sq.m.
II)
15 Lapinig Br. (B01299MN) along Butuan City-cagayan de Oro City-Iligan City Rd 1,000 1.0000 Number of Bridge
16 Musimusi Br. (B01317MN) along Butuan City-cagayan de Oro City-Iligan City Rd 1,500 1.0000 Number of Bridge
17 Silad Br. 1 (B01304MN) along Butuan City-cagayan de Oro City-Iligan City Rd 1,000 1.0000 Number of Bridge
Sta. Ines Br. 1 (B01294MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
18 51,500 982.6200 Sq.m.
II)
Agay-ayan Br. (B01351MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
19 26,000 477.0000 Sq.m.
II)
Binitinan Br. (B01318MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
20 10,000 896.7600 Sq.m.
III)
Page 28 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
Bolisong Br. (B01300MN) along Butuan Cltv-Caqayan de Oro City-Iligan City Rd (Phase
21 10,000 591.4800 Sq.m.
IV)
22 Catuan Br. (B01349MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase II) 31,850 601.0200 Sq.m.
Dangoan Br. 1 (B01290MN) along Butuan aty-cagayan de Oro City-Iligan City Rd (Phase
23 26,000 496.0800 Sq.m.
III)
Dangoan Br. 2 (B01291MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
24 25,840 496.0800 Sq.m.
II)
25 Lunao Br. (B01350MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase II) 34,000 591.4800 Sq.m.
Malubog Br. (B01344MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
26 38,305 734.5800 Sq.m.
IV)
Mangiskis Br. (B01347MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
27 10,000 286.2000 Sq.m.
III)
Minlagas Br. (B01352MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
28 16,500 305.2800 Sq.m.
II)
Pangasihan Br. (B01341MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
29 10,000 286.2000 Sq.m.
III)
Sta. Ines Br. 2 (B01295MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
30 36,500 686.8800 Sq.m.
II)
Talisayan Br. (B01297MN) along Butuan City-cagayan de Oro City-Iligan City Rd (Phase
31 30,560 581.9400 Sq.m.
II)
33 Construction of Flood Control (Upstream), Sta. Ines Bridge 2, Talisayan, Misamis Oriental 100,000 472.0000 Ln.m.
Construction of Flood Control along Maayam River, Brgy. Agay-ayan, Gingoog City,
34 100,000 480.6800 Ln.m.
Misamis Oriental
35 Construction of Flood Control Structure, Barangay Lunao, Gingoog City, Misamis Oriental 82,000 362.0000 Ln.m.
b. Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Gahub River (Downstream), Gingoog City,
39 37,000 158.0000 Ln.m.
Misamis Oriental
Construction of Flood Control Structure along Gahub River (Downstream, Left Side),
40 40,000 166.0000 Ln.m.
Gingoog City, Misamis Oriental
Construction of Flood Control Structure along Gahub River (Downstream, Right Side),
41 40,000 237.6000 Ln.m.
Gingoog Oty, Misamis Oriental
Construction of Flood Control Structure along Linugos River (Upstream, Right Side),
43 45,000 355.0210 Ln.m.
Magsaysay, Misamis Oriental
Page 29 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
Construction of Flood Control Structure along Mangiskis River (Downstream, Both Sides),
45 45,000 355.0210 Ln.m.
Gingoog City, Misamis Oriental
Page 30 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
Construction of Flood Control Project along Gingoog River, Upstream, Gingoog City,
46 90,000 390.0000 Ln.m.
Misamis Oriental
Construction of Flood Control Structure along Gingoog River (Upstream), Gingoog City,
48 72,000 213.8000 Ln.m.
Misamis Oriental
50 Construction of Revetment at Dangoan River, Upstream, Medina, Misamis Oriental 82,000 399.8000 Ln.m.
Brgy. Silad Road connecting Baranggay Mangga in support of the Coco industry - Copra
52 2,043 0.1580 Ln.m.
drying and Oil Mill Facilities, Sugbongcogon, Misamis Oriental
d. LOCAL PROGRAM
Buildings And Other Structures
Multipurpose / Facilities
1. National Building Program
53 Construction of Multi-Purpose Building, Gingoog City, Misamis Oriental 55,000 1.0000 Number of Buildings
67 Construction of Multi-Purpose Building (Phase 2) in Gingoog City, Misamis Oriental 10,000 1.0000 Number of Buildings
Page 31 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
69 Construction of Multi-Purpose Building, Barangay 22-A, Gingoog City, Misamis Oriental 3,000 1.0000 Number of Buildings
70 Construction of Multi-Purpose Building, Barangay 26, Gingoog City, Misamis Oriental 10,000 1.0000 Number of Buildings
71 Construction of Multi-Purpose Building, Barangay Blanco, Balingasag, Misamis Oriental 3,000 1.0000 Number of Buildings
72 Construction of Multi-Purpose Building, Barangay Dig-aguyan, Medina, Misamis Oriental 3,000 1.0000 Number of Buildings
73 Construction of Multi-Purpose Building, Barangay Gaston, Lagonglong, Misamis Oriental 3,000 1.0000 Number of Buildings
74 Construction of Multi-Purpose Building, Barangay Ili-Ilihon, Salay, Misamis Oriental 3,000 1.0000 Number of Buildings
75 Construction of Multi-Purpose Building, Barangay Lapinig, Balingoan, Misamis Oriental 10,000 1.0000 Number of Buildings
79 Construction of Multi-Purpose Building, Barangay Pahindong, Medina, Misamis Oriental 3,000 1.0000 Number of Buildings
80 Construction of Multi-Purpose Building, Barangay Hermano, Balingasag, Misamis Oriental 3,000 1.0000 Number of Buildings
81 Construction of Multi-Purpose Building, Barangay San Isidro, Medina, Misamis Oriental 3,000 1.0000 Number of Buildings
82 Construction of Multi-Purpose Building, Barangay San Vicente, Medina, Misamis Oriental 3,000 1.0000 Number of Buildings
83 Construction of Multi-Purpose Building, Barangay Silad, Sugbongcogon, Misamis Oriental 3,000 1.0000 Number of Buildings
84 Construction of Multi-Purpose Building, Barangay Tagbocboc, Talisayan, Misamis Oriental 3,000 1.0000 Number of Buildings
86 Construction of Multi-Purpose Building, Brgy. Katipunan, Magsaysay, Misamis Oriental 3,000 1.0000 Number of Buildings
87 Construction of Multi-Purpose Building, Brgy. Lapinig, Balingoan, Misamis Oriental 3,000 1.0000 Number of Buildings
Page 32 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
94 Construction of Multi-Purpose Building, Sugbongcogon, Misamis Oriental 3,000 1.0000 Number of Buildings
95 Construction of Multi-Purpose Building, T4, Brgy. Mintabon, Talisayan, Misamis Oriental 3,000 1.0000 Number of Buildings
Construction of Flood Control Structures along Balatukan River (Phase 1), Barangay
110 20,000 103.1000 Ln.m.
Napaliran, Balingasag, Misamis Oriental
Construction of Waterworks System, Purok 4, Barangay San Jose, Gingoog City, Misamis Number of Water
111 3,000 1.0000
Oriental Supply Systems
Number of Water
112 Construction of Waterworks System in Barangay Kibanban, Balingasag, Misamis Oriental 3,000 1.0000
Supply Systems
Page 33 of 44
PHYSICAL
NO. NAME PROJECT AMOUNT ('000) UNIT
TARGET
National Roads and Bridges
National Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
115 Concreting of Road, Barangay Tagbocboc, Talisayan, Misamis Oriental 36,000 2.3440 Lane KM
117 Construction of Local Road, Brgy. Calawag, Balingasag, Misamis Oriental 10,800 1.0060 Lane KM
Local Roads
Local Infrastructure Program
118 Concreting of Brgy. Campo road going to landfill in Kinoguitan, Misamis Oriental 3,000 0.2400 Lane KM
119 Concreting of Local Road, Brgy. Bonifacio, Municipality of Magsaysay, Misamis Oriental 10,000 0.6660 Lane KM
120 Concreting of Kapatagan Road, Barangay Umagos, Lagonglong, Misamis Oriental 3,000 0.2690 Lane KM
121 Concreting of Local Road, Barangay 24-A, Gingoog City, Misamis Oriental 2,500 0.3600 Lane KM
122 Concreting of Local Road, Brgy. Salicapawan to Sitio Linao, Kinoguitan, Misamis Oriental 3,000 0.3240 Lane KM
123 Concreting of Road in Lagonglong, Phase II, Misamis Oriental 3,000 0.2080 Lane KM
Page 34 of 44
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
Region X
Engineers’ Hill, Bulua, Cagayan de Oro City
Misamis Oriental
Preventive Maintenance - Primary Roads - Butuan City-Cagayan de Oro City-Iligan
1 City Rd - K1285 + 004 - K1287 + 270 1 52,611.00 P00601215MN 9.072 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary
4 Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1313 + 100 - K1315 + 000 1 67,375.00 P00601219MN 3.732 Lane Km Central Office 1st District
Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Misamis Oriental
Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 018 - Square
7 1 100,000.00 P00601459MN 6,000 Central Office 1st District
K1398 + 118 meters
Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Misamis Oriental Misamis Oriental
Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1288 + 850 - Square
8 1 50,000.00 P00601458MN 4,500 1st District 1st District
K1289 + 030 meters
Engineering Office Engineering Office
Misamis Oriental
Road Widening - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - 2.5
13 K1302 + 992 - K1304 + 231 1 52,500.00 P00602540MN Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Road Widening - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd -
14 K1305 + 460 - K1306 + 675 1 50,381.00 P00602540MN 2.428 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Road Widening - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd -
15 K1373 + 978 - K1375 + 452 1 60,000.00 P00602557MN 2.968 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Road Widening - Secondary Roads -Gingoog-Claveria-Villanueva Rd - K1325 + 418 -
18 K1327 + 000 1 67,904.00 P00602543MN 3.122 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Construction of Flood Control Dike along Mangiskis River (Upstream), Sta. 0+000.00 Lineal
38 - Sta. 0+400.00, Gingoog City, Misamis Oriental 1 100,000.00 P00620028MN 625 Central Office 1st District
meters
Engineering Office
Misamis Oriental
Construction of Flood Control Structure along Maayam River, Brgy. Agay-ayan, Sta. Lineal
39 0+000.00 + Sta. 0+600.00, Gingoog City, Misamis Oriental 1 100,000.00 P00620032MN 625 Central Office 1st District
meters
Engineering Office
Misamis Oriental
Construction of Flood Control Structure, Brgy. Lunao, Sta. 0+000.00 - Sta. 0+600.00, Lineal
40 Gingoog City, Misamis Oriental 1 100,000.00 P00620034MN 625 Central Office 1st District
meters
Engineering Office
Misamis Oriental
Construction of Sea Wall, Brgy. Daan Lungsod, K0+000.00 - K0+350.00, Gingoog Lineal
41 City, Misamis Oriental 1 80,000.00 P00620042MN 350 Central Office 1st District
meters
Engineering Office
Construction/ Improvement of Access Roads leading to Declared Tourism Misamis Oriental Misamis Oriental
43 Destinations (Tourism Road Infrastructure Program - TRIP) - Kaulayanan 1 18,750.00 P00633626MN 1.25 Lane Km 0.625 1st District 1st District
Circumferential Road, Sugbongcogon, Misamis Oriental Engineering Office Engineering Office
Construction/ Improvement of Access Roads leading to Declared Tourism Misamis Oriental Misamis Oriental
44 Destinations (Tourism Road Infrastructure Program - TRIP) - Mimbuahan Road 1 19,250.00 P00633627MN 1.283 Lane Km 0.6415 1st District 1st District
leading to Mimbuahan Falls, Sugbongcogon, Misamis Oriental Engineering Office Engineering Office
Construction/ Improvement of Access Roads leading to Declared Tourism Misamis Oriental Misamis Oriental
45 Destinations (Tourism Road Infrastructure Program - TRIP) - Tiningalan Road, 1 24,875.00 P00633663MN 1.658 Lane Km 0.829 1st District 1st District
Sugbongcogon, Misamis Oriental Engineering Office Engineering Office
Preventive Maintenance along Butuan City-Cagayan de Oro City-Iligan City Rd - Misamis Oriental
K1280 + (-728) - K1280 + 554, K1303 + 003 - K1303 + 070, K1303 + 283 - K1307 +
47 359, K1307 + 539 - K1307 + 909, K1308 + 153 - K1308 + 789, K1308 + 814 - K1312 + 1 70,000.00 P00633694MN 12.86 Lane Km Central Office 1st District
510 Engineering Office
Misamis Oriental
51 Construction of Balingasag-Claveria Alternate Road, Package 3, Misamis Oriental 1 75,000.00 P00630416MN 6.92 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
52 Construction of Balingasag-Claveria Alternate Road, Package 4, Misamis Oriental 1 75,000.00 P00630417MN 6.92 Lane Km Central Office 1st District
Engineering Office
Misamis Oriental
Construction of Flood Mitigation Structure along Bolisong River, Kinoguitan, Lineal
55 Misamis Oriental 1 70,000.00 P00630491MN 552.254 Central Office 1st District
meters
Engineering Office
Construction (Completion) of Multi-Purpose Building (Child Development Center), Misamis Oriental Misamis Oriental
Number of
64 Barangays Nabataan and Dampias, and Sitio Tinigbasan, Binuangan, Misamis 1 2,000.00 P00631387MN 1 1st District 1st District
Oriental Buildings
Engineering Office Engineering Office
Number of
Misamis Oriental Misamis Oriental
Construction of Waterworks System, Barangay Camuayan, Balingasag, Misamis Water
83 Oriental 1 7,000.00 P00631941MN 1 1st District 1st District
Supply
Engineering Office Engineering Office
Systems
TOTAL
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
Region X
Engineers’ Hill, Bulua, Cagayan de Oro City
Misamis Oriental
Preventive Maintenance - Secondary Roads - Gingoog-Claveria-Villanueva Rd -
1 1 13,287,000.00 P00706213MN 2.160 Lane Km 2.160 Lane Km 1st District
K1329 + 775 - K1330 + 300
Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide Misamis Oriental
2 - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1281 + 100 1 72,650,000.00 P00706575MN 3,027.080 Square meters 2,196.000 Square meters 1st District
- K1281 + 222 Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide Misamis Oriental
3 - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 318 1 90,000,000.00 P00706343MN 5,555.560 Square meters Square meters 1st District
- K1398 + 418 Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide Misamis Oriental
4 - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 418 1 90,000,000.00 P00706344MN 500.000 Square meters Square meters 1st District
- K1398 + 518 Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide Misamis Oriental
5 - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City Rd - K1398 + 518 1 90,000,000.00 P00706345MN 500.000 Square meters Square meters 1st District
- K1398 + 618 Engineering Office
Misamis Oriental
Road Widening - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City
6 1 9,300,000.00 P00705821MN 0.424 Lane Km 0.424 Lane Km 1st District
Rd - K1284 + 066 - K1284 + 174, K1284 + 269 - K1284 + 373
Engineering Office
Misamis Oriental
Road Widening - Primary Roads - Butuan City-Cagayan de Oro City-Iligan City
7 1 22,831,000.00 P00705822MN 1.068 Lane Km 1.068 Lane Km 1st District
Rd - K1308 + 864 - K1309 + 399
Engineering Office
Misamis Oriental
Road Widening - Secondary Roads - Gingoog-Claveria-Villanueva Rd - K1334 +
8 1 21,291,000.00 P00705823MN 1.702 Lane Km 1.102 Lane Km 1st District
000 - K1334 + 851
Engineering Office
Misamis Oriental
Rehabilitation/ Major Repair of Permanent Bridges - Odiongan Br. (B01342MN) Number of Number of
9 1 5,000,000.00 P00706733MN 1.000 1.000 1st District
along Butuan City-Cagayan de Oro City-Iligan City Rd Bridges Bridges
Engineering Office
Misamis Oriental
Rehabilitation/ Major Repair of Permanent Bridges - Malubog Br. (B01344MN) Number of Number of
10 1 2,000,000.00 P00706734MN 1.000 1.000 1st District
along Butuan City-Cagayan de Oro City-Iligan City Rd Bridges Bridges
Engineering Office
Misamis Oriental
Rehabilitation/ Major Repair of Permanent Bridges - Maanas Br. (B01289MN) Number of Number of
11 1 2,000,000.00 P00706735MN 1.000 1.000 1st District
along Butuan City-Cagayan de Oro City-Iligan City Rd Bridges Bridges
Engineering Office
Misamis Oriental
Rehabilitation/ Major Repair of Permanent Bridges - Talisayan Br. (B01297MN) Number of Number of
12 1 5,000,000.00 P00706736MN 1.000 1.000 1st District
along Butuan City-Cagayan de Oro City-Iligan City Rd Bridges Bridges
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Talisay Br. (B01152MN) along Butuan City -
13 1 5,000,000.00 P00706737MN 438.360 Square meters 438.360 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase III)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Anakan Br. (B01343MN) along Butuan City -
14 1 30,000,000.00 P00706738MN 244.000 Square meters 244.000 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - San Juan Br. (B01348MN) along Butuan City -
15 1 30,000,000.00 P00706739MN 234.570 Square meters 234.570 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Agay-ayan Br. (B01351MN) along Butuan City
16 1 4,000,000.00 P00706740MN 1,005.200 Square meters 1,005.200 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase III)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Lunao Br. (B01350MN) along Butuan City -
17 1 15,000,000.00 P00706741MN 1,317.800 Square meters 1,317.800 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase IV)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Minlagas Br. (B01352MN) along Butuan City -
18 1 5,000,000.00 P00706742MN 584.760 Square meters 584.760 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase IV)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Dangoan Br. 1 (B01290MN) along Butuan City
19 1 5,000,000.00 P00706743MN 876.720 Square meters 876.720 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase IV)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Dangoan Br. 2 (B01291MN) along Butuan City
20 1 5,000,000.00 P00706744MN 876.720 Square meters 876.720 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase IV)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Tup-on Br. (B01293MN) along Butuan City -
21 1 7,000,000.00 P00706745MN 510.180 Square meters 510.180 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase III)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Portulin Br. (B01292MN) along Butuan City -
22 1 7,000,000.00 P00706746MN 429.930 Square meters 429.930 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase III)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Sta. Ines Br. 1 (B01294MN) along Butuan City
23 1 18,000,000.00 P00706747MN 1,419.300 Square meters 1,419.300 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase IV)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Sta. Ines Br. 2 (B01295MN) along Butuan City
24 1 12,000,000.00 P00706748MN 1,230.800 Square meters 1,230.800 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase III)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Bolisong Br. (B01300MN) along Butuan City -
25 1 5,500,000.00 P00706749MN 1,042.800 Square meters 1,042.800 Square meters 1st District
Cagayan de Oro City - Iligan City Rd (Phase V)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Silad Br. 1 (B01304MN) along Butuan City-
26 1 35,700,000.00 P00706750MN 258.830 Square meters 258.830 Square meters 1st District
Cagayan de Oro City-Iligan City Rd
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Balanakon Br. (B01259MN) along Butuan City
27 1 22,000,000.00 P00706751MN 144.000 Square meters 144.000 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Hinandigan Br. (B01258MN) along Butuan City
28 1 22,000,000.00 P00706752MN 151.500 Square meters 151.500 Square meters 1st District
- Cagayan de Oro City - Iligan City Rd (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Kahulugan Br. (B01256MN) along Gingoog-
29 1 22,000,000.00 P00706753MN 151.500 Square meters 151.500 Square meters 1st District
Claveria-Villanueva Rd (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Lingonlingon Br. (B01260MN) along Gingoog-
30 1 22,000,000.00 P00706754MN 153.450 Square meters 153.450 Square meters 1st District
Claveria-Villanueva Rd\ (Phase II)
Engineering Office
Misamis Oriental
Widening of Permanent Bridges - Sinap-angan Br. (B01257MN) along Gingoog-
31 1 22,000,000.00 P00706755MN 150.000 Square meters 150.000 Square meters 1st District
Claveria-Villanueva Rd (Phase II)
Engineering Office
Misamis Oriental
Construction of Flood Control Structure along Balatukan River, Barangay
32 1 100,000,000.00 P00721423MN 776.426 Lineal meters 427.700 Lineal meters 1st District
Kibanban, Balingasag, Misamis Oriental
Engineering Office
Misamis Oriental
Construction of Flood Control Structure along Balatukan River, Barangay
33 1 100,000,000.00 P00721424MN 776.426 Lineal meters 322.300 Lineal meters 1st District
Mambayaan, Balingasag, Misamis Oriental
Engineering Office
Misamis Oriental
34 Mimbuahan Road leading to Mimbuahan Falls, Sugbongcogon, Misamis Oriental 1 1,500,000.00 P00733308MN 0.120 Lane Km 0.099 Lane Km 1st District
Engineering Office
Misamis Oriental
35 Kaulayanan Circumferential Road, Sugbongcogon, Misamis Oriental 1 4,150,000.00 P00733307MN 0.332 Lane Km 0.291 Lane Km Deleted 1st District
Engineering Office
Misamis Oriental
36 Tiningalan Road leading to tourism destination, Sugbongcogon, Misamis Oriental 1 6,700,000.00 P00733309MN 0.378 Lane Km 0.304 Lane Km 1st District
Engineering Office
Misamis Oriental
Lunao-Agay-ayan Circumferencial Road connecting to proposed Lunao Seaport
37 1 5,000,000.00 P00733310MN 0.400 Lane Km 0.178 Lane Km 1st District
in support of Transport and Logistics, Gingoog City, Misamis Oriental
Engineering Office
Misamis Oriental
38 Construction of Bridge (Coastal Bridge), Medina, Misamis Oriental (Phase II) 1 10,000,000.00 P00732002MN 65.682 Square meters Square meters 1st District
Engineering Office
Misamis Oriental
39 Construction of Road, Brgy. Sta Cruz, Magsaysay, Misamis Oriental 1 9,000,000.00 P00732003MN 0.509 Lane Km 0.654 Lane Km 1st District
Engineering Office
Misamis Oriental
40 Construction of Road, Barangay Gaston, Lagonglong, Misamis Oriental 1 10,000,000.00 P00732283MN 0.566 Lane Km 0.506 Lane Km 1st District
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building, Community College of Number of Number of
41 1 5,000,000.00 P00732775MN 1.000 1.000 1st District
Gingoog City, Gingoog City, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building, Gingoog Dormitory, Number of Number of
42 1 15,000,000.00 P00732776MN 1.000 1.000 1st District
Barangay 26, Gingoog City, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Purok 4, Number of Number of
43 1 4,000,000.00 P00732777MN 1.000 1.000 1st District
Barangay South Poblacion, Medina, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
44 1 3,000,000.00 P00732778MN 1.000 1.000 1st District
Mananum Daan, Medina, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Municipal Gym), Barangay Number of Number of
45 1 10,000,000.00 P00732779MN 1.000 1.000 1st District
Lapinig, Balingoan, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
46 1 3,000,000.00 P00732780MN 1.000 1.000 1st District
Kitamban, Binuangan, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Binuangan Number of Number of
47 1 3,000,000.00 P00732781MN 1.000 1.000 1st District
National High School, Binuangan, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
48 1 3,000,000.00 P00732782MN 1.000 1.000 1st District
Saray, Salay, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
49 1 2,000,000.00 P00732783MN 1.000 1.000 1st District
Lumbo, Lagonglong, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
50 1 3,000,000.00 P00732784MN 1.000 1.000 1st District
Umagos, Lagonglong, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Tabok Number of Number of
51 1 3,000,000.00 P00732785MN 1.000 1.000 1st District
Elementary School, Barangay Tabok, Lagonglong, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
52 1 2,000,000.00 P00732786MN 1.000 1.000 1st District
Cogon, Balingasag, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
53 1 2,000,000.00 P00732787MN 1.000 1.000 1st District
Calubo, Kinoguitan, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Number of Number of
54 1 2,000,000.00 P00732788MN 1.000 1.000 1st District
Poblacion, Kinoguitan, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Number of Number of
55 1 20,000,000.00 P00732789MN 1.000 1.000 1st District
Magsaysay, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction of Multi-Purpose Building, LTO Balingasag District office, Number of Number of
56 1 25,000,000.00 P00732790MN 1.000 1.000 1st District
Balingasag, Misamis Oriental Buildings Buildings
Engineering Office
Misamis Oriental
Construction of Level 2 & Level 3 Water Supply System, Barangay San Jose, Number of Water Number of Water
57 1 5,000,000.00 P00733444MN 1.000 1.000 1st District
Gingoog City, Misamis Oriental Supply Systems Supply Systems
Engineering Office
TOTAL 1,073,909,000.00
PLAN ACTUAL
a. OO1 - Asset Preservation - Preventive Maintenance - Secondary Roads 2.16 2.16
b. OO1 - Asset Preservation - Rehab. / Reconstruction of National roads w/ slips, Slope Collapse and Landslide - Primary Roads 9,582.64 2,196.00
d. OO1 - Network Development - Road Widening - Primary Roads 1.49 1.49
e. OO1 - Network Development - Road Widening - Secondary Roads 1.70 1.10
g. OO1 - Bridge - Rehabilitation/ Major Repair of Permanent Bridges 4.00 4.00
h. OO1 - Bridge - Widening of Permanent Bridges 11,220.42 11,220.42
i. OO2 - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 1,552.85 750.00
j. CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) 0.83 0.694
k. CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) 0.40 0.178
n. CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - BRIDGE 65.68 -
o. CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - ROADS 0.51 0.6540
r. CSSP - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities 0.57 0.5060
t. CSSP - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services 16.00 16.00
x CSSP - Basic Infrastructure Program (BIP) - Public Water Supply System (Level II or III) 1.00 1.00
TOTAL= 22,450.25 14,194.21
TOTAl Projects = 57