You are on page 1of 14

on7.

i3 Owu
08,2:4.2o23
REPUBLIC 0F THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

fibs OFFICE 0F THE SECRETARY


MANILA

MAH 2 3 20Z3

DEPARTMENT ORDER SUBJECT: Amendments to DPWH Standard


Specification for ITEM 611 - TREE
PLANTING
No. 34
Series of 2023
3lttl23

In order to ensure uniformity in the application/ adoption of the Pay Items of Work to be
used/adopted by those who are involved in the preparation of the Design Plans and Quantities,
Program of Works (POW) and Approved Budget for the Contract (ABC) for Infrastructure
Projects Nationwide, the attached revised DPwll Standard Specification for Item 611 -
Tree Planting is hereby prescribed for adoption in Government infrastructure projects.

This Standard Specification was revised to include vital provisions from Department Order No.
238, Series of 2022 (Mandatory Tree Planting as Part of the Environmental Sustainability
Program for DPWH Flcod Control Projects) and to support the environmental sustainability
initiatives of the Department. The revised Pay Item Subscripts are now included in the Project
and Contract Management Application (PCMA) and shall form patt of the DPWH Standard
Specifications for Highways, Bridges and Airports, Volume 11.

This Order shall fake effect immediately.

14.12 MLl/JDV/RPF

Depertrr.n:molcopuob,bl#ewft#Hkyhway8

1111111111111111111111111111111111111

WIN3U01854
Amendment to DPWH Standard Specification for
ITEM 611 -TREE PLANTING

611.1 Description

This Item shall consist of providing and planting deciduous shade, flowering trees,
evergreen, and/or fruit-bearing trees/seedlings/saplings on the identified areas and in the
arrangements indicated by the Engineer in coordination with the Department of Environment
and Natural Resources (DENR) Community Environment and Natural Resource Office
(CENRO) or Provincial Environment and Natural Resource Office (PENRO) concerned,
including labor and other incidentals necessary to complete the Item.

This Item shall also be in support and in compliance with the National Greening Program
(NGP) under Executive Order No. 26, Series of 2011 and other environmental sustainability
initiatives of the Government.

611.2 Material Requirements

611.2.1 Topsoil

Topsoil shall conform to the requirements of Item 608, Topsoil.

611.2.2 Mulching, Bracing, Anchor and Wrapping Materials

Mulching material shall consist of approved wood chips, ground or crushed corn cobs, wood
shavings, sawdust or peat moss. Wood chips shall be combination of wood slivers with
ground wood or sawdust.

Bracing stakes for plants shall be 50 mm x 50 mm of rough wood free from unsound loose
knots, rot, cross grain and sapwood or other defects that may impair its strength.

Anchor stakes shall be of the same quality as bracing stakes and of the size specified under
operations calling for their use.

Wrapping material for trees shall be waterproof paper or burlap.

The tying material to be used in wrapping trees shall be jute twine or similar material not
less than 2-ply for trees 7.5 mm or less in diameter and 3-ply for trees over 7.5 mm in
diameter.

The wire to be used in bracing trees 7.5 mm or less in diameter shall be 3 mm (No. 11)
galvanized steel wire and for trees over 75 mm in diameter, 40 mm (No. 9) galvanized steel
wire shall be used. All wires shall be new and free from bends or kinks.

611.2.3 Trees

All trees furnished under this Item shall be the type, dimension and species specified in the
Provisions and recommended by the DENR.

When specified in the Provisions, certain varieties of plants will be furnished by


administration.
Amendment to DPWH Standard Specification for
ITEM 611 -TREE PLANTING
Page 2 of 5

The Contractor shall submit complete and detailed information concerning the sources of
supply for each item of plant materials before planting operations.

All existing laws and regulations requiring inspection for plant diseases and infections shall
be complied with and each delivery shall be accompanied by necessary certificates of
clearance to be presented to the Engineer.

Plants furnished by the Contractor shall be healthy, shapely and well-rooted and roots shall
show no evidence of having been restricted or deformed at any time. Plants shall be well-
grown and free from insect pest and disease.

Root condition of plants furnished by the Contractor in containers shall be determined by the
removal of earth from the roots of not less than two plants nor more than two (2) percent of
total number of plants of each specie or variety except when container-grown plants are
from several sources, the roots of not less than two plants of each specie or variety from
each source will be inspected by the Engineer. In case the sample plants inspected are
found to be defective, the entire lot or lots of plants represented by the defective samples
shall be rejected. Any plant rendered unsuitable for planting because of this inspection shall
be considered as samples and will not be paid for.

611.3 Construction Requirements

Planting of trees shall be undertaken in accordance with the approved methods/procedures


of DENR.

611.3.1 Balling of plants and Trees

Balling of plants and trees shall conform to the applicable requirements of Item 100,
Clearing and Grubbing.

611.3.2 Digging Plants

All plants, nursery-grown or collected, shall be dug with care and skill immediately before
shipping and avoiding all possible injury to the plants, loss or damage of the roots, particular
attention being given to fibrous roots in this respect. After the plants are dug, their roots
shall not be permitted to dry out. They shall not be exposed to hot temperatures. All plants
shall be dug in dormant state and shall be so held until planted.

611.3.3 Temporary Storage and Plant Spray

After delivery and inspection, the plants shall be sprayed with an approved anti-desiccant
prior to planting, heeling-in or storing, except in the case of collected stock which shall not
be heeled-in or stored, but shall be sprayed with anti-desiccant immediately and planted
within 36 hours after digging.

The spray shall cover both upper and lower surfaces of the branches and foliage to the point
of run-off. Spray nozzles shall be the type to produce a fine mist.

Spraying shall be included for payment in the pertinent planting item. Following spray
treatment with anti-desiccant, all plants which cannot be planted promptly shall be heeled-in
in a trench, spread and the roots covered with moist soil. If plants are not to be stored for a
Amendment to DPWH Sta'ndard Specification for
ITEM 611 -TREE PLANTING
Page 3 of 5

period longer than 10 days, they shall be placed in an approved well-ventilated, cool and
moist storage shed and the roots completely covered with moist straw. All plants heeled-in
or stored shall be properly maintained by the Contractor until planted. In the event heeled-in
plant material must be held over for a longer period, such heeled-in material shall be lifted
and replanted in a satisfactory manner in nursery rows.

The ball of soil and roots of balled and burlapped plants, if not immediately planted after
delivery and inspection, shall be adequately protected by topsoil covering until removed for
planting in a manner appropriate to the conditions and satisfactory to the Engineer.

Such emergency storage of plant shall be at the entire risk of the Contractor, including
maintenance of same.

611.3.4 Layout of Planting

Before digging pocket holes or beds, the Contractor shall lay out, by suitable staking, the
location of all pocket holes and beds. The layout of planting shall be approved by the
Engineer.

611.3.5 Roots and Top Pruning

The ends of all broken and damaged roots, 6 mm diameter or larger, shall be pruned with a
clean cut, remo`Ving no more than the injured portion. All plants shall be pruned to balance
the top with the root system keeping the natural shape of the species. All dead woods shall
be removed. All cuts and wounds, 12 mm or over in diameter, shall be painted with tree
wound dressing immediately after the pruning.

611.3.6 Pocket Holes

Pocket holes shall be dug at the locations shown on the Plans or as directed by Engineer.
The holes shall be dug to the depth and cross-section specified and should be of sufficient
size to provide for not less than 150 mm of top soil backfill beneath and around the root
system. The holes shall be dug with the sides vertical. Surplus excavation from the bed and
pocket holes shall be disposed off as directed by the Engineer.

611.3.7 Backfill

The pocket holes shall be backfilled with topsoil as each plant is set. The topsoil shall be
well-tamped by the worker's feet, rods or other approved tamping devices as it is shoveled
into the holes. The backfill in holes on slopes shall be built-up on the lower side to catch and
hold water. During planting the topsoil surrounding the plant be slightly depressed to hold
water.

611.3.8 planting

The operation of the actual planting shall not be performed at any time when the soil is not
in a friable or workable condition. The Engineer shall also approve the location of each
individual plant taking into consideration its size and shape, in order that the best possible
arrangement will result.

One plant shall be planted in the center of each pocket hole and in the arrangement shown
on the Plans. The plants shall be set on tamped topsoil backfill brought to the height
Amendment to DPWH Standard Specification for
ITEM 611 -TREE PLANTING
Page 4 of 5

necessary to plant them at the same depth they grew, carefully spreading out the roots of
barefoot stock in their natural position. Upright plants shall be kept in a vertical position.
After placing the plant in the hole, the backfill shall be carefully made, tamping with the
worker's feet and with round-end rods or other approved tamping devices to insure topsoil
in and about all the roots. The topsoil shall be settled in and about the plant roots by
application of water but at no time shall tamping or further topsoil backfill be made while
this wet topsoil backfill is of a consistency that would permit its being compacted or puddled
by so doing. All compaction shall be such that no plant will settle lower than the depth
above specified. No air pocket shall be left around the root of any plants.

After filling halfway on the earth ball, the burlap shall be loosened and the top half cut off
and removed after which the balance of the pocket hole shall be backfilled and tamped.

After planting and prior to mulching, fertilizers shall be applied evenly over the top of the
backfilled area. Care shall be used so that the fertilizer does not get into contact with the
stem, trunk, branches or leaves of the plants.

611.3.9 Mulching

Within 24 hours after planting, mulching material shall be spread to cover the plant hole and
the area 150 mm outside the periphery of the plant hole. The depth and application for
wood chips shall be a minimum of 150 mm. For ground or crushed corn cobs, sawdust or
peat moss the minimum depth shall be 100 mm.

611.3.10 Watering and Maintenance

All trees/seedlings/saplings shall be watered during the planting operations, subject to


direction and approval of the Engineer. From time to time during the duration of the
Contract, sufficient water shall be applied so that not only will the topsoil backfill about each
plant be kept moist, but also for moisture to extend into the surrounding soil.

The Contractor shall, during the duration of the Contract, properly care for all
trees/seedlings/saplings furnished, planted or stored, performing such watering, weeding,
cultivating or other ordinary maintenance work as shall be necessary to keep the stock in a
live and healthy condition.

Trees/seedlings/saplings which have died back into the crown or beyond a normal pruning
line shall be replaced by the Contractor at no additional expense.

611.3.11 Bracing

All deciduous and evergreen trees shall be braced immediately after planting. Deciduous
trees from 1.20 in to 1.80 in in height shall have one vertical support stake. Deciduous trees
from 1.80 in to 2.50 in in height shall have two vertical support stakes.

Balled and burlapped deciduous or evergreen trees within the above size ranges shall be
supported with the number of stakes specified for the group but instead of being placed
vertically, shall be driven so that the stake does not enter or contact the earth ball around
the plant roots. The stake or stakes shall be so placed that after being driven in place, the
upper foot of the stake is within approximately 100 mm of the trunk at one-half of the
height of the tree. If two are required, they shall be driven on opposite sides of the tree with
the stake tops on opposite sides for fastening.
Amendment to DPWH Standard Specification for
ITEM GIL -TREE PLANTING
Page 5 of 5

All trees, deciduous or evergreen over two and one-half meters shall be braced by the tripod
method as directed by the Engineer.

611.3.12 Dead Trees

Before completion and final acceptance of the project, all unhealthy trees or that have died
back into the crown or beyond the normal pruning line shall be replaced by the Contractor
at his own expense with trees of the specified species or variety, size and quality and
meeting the Specification.

611.4 Method of Measurement

The quantity to be paid for shall be the number of trees of each specie or variety called for
in the Plans or in the provisions furnished, planted and accepted/certified by the Engineer
with the necessary mulch, topsoil, water, fertilizer and other incidentals to complete the
Item.

611.5 Basis of Payment

The quantities as determined in Section 611.4, Method of Measurement, shall be paid for at
the Contract Unit Price each of the trees of each species or variety furnished, planted and
accepted which price and payment shall constitute full compensation for furnishing all labor,
tools and incidentals to complete the Item.

Payment shall be made under:

Pay Item Unit of


Description
Number Measurement
611 (1) Trees (Furnishing and Transplanting) Each

611 (2) Trees (Transplanting) Each

611 (3) Seedlings/Saplings for Other Programs/Initiatives Each

Roferences:

1. DPWH Standard Specifications for Highways, Bridges and Airports, Volume 11, 2012 Edition, Item 611 -
Tree Planting
2. Department Order No. 73, Series of 2014 (Prohibited Uses Within the Right-of-Way Of National Roads)
3. Department Order No. 238, Series of 2022 (Mandatory Tree Planting as Part Of the Environmental
Sustainability Program for DPWH Flood Control Prtyects)
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
Bluebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSTIFICATIONS

ITEM 611 -TREEPLANllNG/Section611.1,Description, 611.1 Description 611.1 Description

This Item shall consist of furnishing and planting This Item shall consist of fuFFiiship.g proli/`d/`"g and This is to align the specificatlon with
p. 484 deciduous shade, flowering trees and evergreen planting deciduous shade, flowering trees, the provisions of DENR and with the
trees less than 150 mm in diameter on the areas evergreen, trees less tb.aF, 150 mm ip, diameteF oFi National Greening Program (NGP)
LL`_ ___--__I :_ LL_ ______-___L_ :_I:I--L_I __+11-\^1\.\*.,\^11\^111\11\-\^1,\^,,=\-1,,\-.,\^,...-,\^^\\*\^\,"
and in the arrangements indicated on the Plans or and D.O. 238, Series of 2022
LL`_ r\'__- __ __ :-I:^_L_I I-.. LL`- I---:----+11-11\+11'.,\,1\*`,'```-1`^^``-`-1,,````--1.=`'``-`-. ,
as indicated by the Engineer, including the digging (Mandatory Tree Planting as Part of
:__I..I:__ LI-- I:__?__ -_I _-__---L:__ _, __-I,_1``l\.-\`\-`ll>a`11`-`-lT±=alll=\*1,\*\,,\-r\^,\*~.`,"\,.r\,\.|`\~~
and preparation of pocket holes, furnishing and the Environmental Sustainability
L`_I_- I..__:_L:__ __I _I_-:__ LL`_ __-_--__.11`,1`-`,,1`-1`1'`-1"11=,`-1.`^,,``^`-```=`"`."`-`'`-`.`,`^',
placing the necessary topsoil, mulch, water, Program for DPWH Flood Control
fertilizer and other incidentals necessary to tepseil, in,ul€F., .,-,.atef, feftilizeF and/or frzty-f- Projects)
complete the Item. bearingtre s/ e dlings/ aplingsonthe.Identifedareas ndinthear angementsindicatedbytheEngine rinco rdinationwith eDepartmentofEnvironmentandNaturalResources(DENR)Com unityEnvironmentandNaturalResourceOf ice(CENRO)orP ovincia/EnvironmentandNaturalResourceOf ice(PENRO)concerned,includinglaborandotherincidentalsnec s arytocomplet heItem.ThisItemshalbeinsup ortandincompliancewith eNationalGre ni gProgram(NGP)underExecutiveOrderNo.26,Seriesof201 andother nvironmentalsu tainabiltyintiativesoftheGovernment.

ITEM 611 -TREE 611.2.2 Mulching 611.2.2 Mulching, 4rac/.ng, Anchor adar Revised the subsection title to
PLAN||NG/ Wrapping Materials consider the other material
Subsection 611.2.2, requirements included in the
Mulching, p. 485 existing provision

Page 1 Of 8
SuMMARY OF JUSTIFICAlloNS ON THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
Bluebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS ]usTIFlcAnoNs


ITEM 611 -TREEPLANTING/Subsection611.2.3, 611.2.3 Trees 611.2.3 Trees

All trees furnished under this Item shall be 150 All trees furnished under this Item sb,all be 150 The first paragraph was revised and
Trees, pp. 485-486 mm or less in diameter and shall be true to name Ff]m eF less ip, diam.etef aFid ^hall be I;4e rfFEalerfg the recommending authority was
and type and shall follow standard names of trees flame±fid type, dimension and species specified changed to the Department of
in accordance with the Bureau of Forestry in the Provisions and recommended by the DENR. Environment and Natural
Standards as adopted by the Department of Public --J ^L-Il `-1'-," A--I-~J ----- -, ,-__^ .. Resources.Theterm ``government was
Works and Highways.Whenspecifiedinthe Provisions, certain varieties -----I--^-.":+I+ +L^ r}. .-^.. . ^F t=^-^-, t`+__J_..J_`.`.`.`,I`1.-I'`-`-'' -IIV,+,\,1*,\-1,1,\, ,1, -`,L,I.,uJ,,|JW,|.|J~~-A--+^JL`,+L^n^_-A_^^+^`r,. I-,I_\J'J_..I,_`--w\*\,I,®:+.\|\, u,\-\,~',|, , , -, L\, ,|J, , ~, \, ,\__A,JZ_L.-._.,_, , , , ,=, , 1, ., WhenspecifiedintheProvisions,certainvarieties

of plants will be furnished by adm;`ntifr7f/on. tits changed to ``administration" for


of plants will be furnished by the government. =,\, , \., , ,, , ,\-, ,L- consistency.

The Contractor shall submit complete and detailed The Contractor shall submit complete and detailed
information concerning the sources of supply for information concerning the sources of supply for
each item of plant materials before planting each item of plant materials before planting
operations. Operations.

All existing laws and regulations requiring All existing laws and regulations requiring
inspection for plant diseases and infections shall inspection for plant diseases and infections shall
be complied with and each delivery shall be be complied with and each delivery shall be
accompanied by necessary certificates of accompanied by necessary certificates of
clearance to be presented to the Engineer.PlantsfurnishedbytheContractorshall be clearance to be presented to the Engineer.plantsfurnishedbytheContractorshall behealthy,shapelyandwell-rootedandrootsshall

healthy, shapely and well-rooted and roots shall show no evidence of having been restricted or
show no evidence of having been restricted or deformed at any time. Plants shall be well-grown
deformed at any time. Plants shall be well-grownandfreefrominsectpestanddisease. and free from insect pest and disease.

Page 2 of 8
SUMMARY OF JUSTIFICATIONS 0N THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
Bluebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSTIFICATIONS


Root condition of plants furnished by the Root condition of plants furnished by the
Contractor in containers will be determined by the Contractor in containers +wit/ s"al/ be determined
removal of earth from the roots of not less than by the removal of earth from the roots of not less
two plants nor more than two (2) percent of total than two plants nor more than two (2) percent of
number of plants of each specie or variety except total number of plants of each specie or variety
when container-grown plants are from several except when container-grown plants are from
sources, the roots of not less than two plants of several sources, the roots of not less than two
each specie or variety from each source will be plants of each specie or variety from each source
inspected by the Engineer. In case the sample will be inspected by the Engineer. In case the The sentence was rephrased or
plants inspected are found to be defective, the sample plants inspected are found to be defective, reworded.
Government reserves the right to reject the entire -. -€. -.---- ---. - -- =. = -. -

lot or lots of plants represented by the defective entire lot or lots of plants represented by the
samples. Any plant rendered unsuitable for defective samples sAa// 4e n€/.ecteol. Any plant
planting because of this inspection will be rendered unsuitable for planting because of this
considered as samples and will not be paid for. inspection wi4/ sAa// be considered as samples andwillnotbepaidfor.

ITEM 611 -TREE 611.3 Construction Methods 611.3 Construction Aegzt/reme»tsP/antingoftreesshallbeundertaken in ``Constructi on M eth ods" were
PLANllNG/ Section cha nged to ``Co nstruction
611.3, Construction Requirements" as per standard
Methods, pp. 486 accordance with the a pproved format of the DPWH Standard
methods/procedures of DENR. SpecificationProvideda generic provisionemphasizingthatthemethodsshallbeapprovedbytheDENR.

ITEM 611 -TREE 611,3.1 Balling of Plants and Trees 611.3.1 Balling of Plants and Trees The provision for Subsection
PLANTING/ 611.3.1, Bamng of Plants and Trees
Subsection 611.3.1, Balling is employed in plants and trees to be Bal/ing of plants and trees shall conform to the was refereed to Item 100, Clearing
Balling of Trees and transplanted or transferred. To ball out the trees, applicable requirements of Item 100, Clearing and and Grubbing. Requirements for
Plants, p. 486 the depth to which the root system reaches is first Grubb.inq. earth ballinq were already included

Page 3 of 8
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
B[uebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSTIFICATIONS

determined. Digging around the tree is then done, in the revised specification of said
r,_''s__ :_ ^__I_. ,_J :_ _I__+_ __J ,-^_^ +_ I._,,|J,,,,,},,J~,,,I,,\,r-\J''I,,'`-''`^,`-I'`.`'`-`..,-`,.,`-
being careful not to cut many roots. Watering the Item of Work.
..____I_-,-J --,----F-~~-I T-L~-I' -, ,+ ,I,-I.,---L,|`,,Jf,,|J,,L+u\,,|,-,,J,~,'~+.'I\,+,11.I`,`--~''`-+I`.+,`,,
soil before balling is prohibited. The surface of the
•L`~ J__-L` .^ ...L:^L .L`^ -^^+ -.I-+^_ -^-^L`^^ :-a-`''++.`,r-I',`,''II.`.II`''`-I`,`,`.,,`,``.I..I`-.`..'`.`,'.,I''.,`
earth is kept as smooth as possible. After the tree
J_J,---:--I r\,--I---~-I,-J +L-+---:^ +A--J---\J+,~,,,,,,,~\,'\,,,,=,,,,:,|Z,\,\,.`\*+.``-~'`.`.'',`''`..I`-`,I'`./
is dug out, the roots and earth is wrapped
L`^:__ -_-_E..I __, L_ ^..L _---I ---J~- ,^|-,--I--+L~-1,-,,,:,\^J'-I\,.I'\,~,\,`-`.+II'`.II,I`,`,`-,.''`.``-I'''=-.'`-
immediately with the sacking material. The tree
-^..I I-^C^-^ L`.Il..-A :-.-^L:L`:+^J Th^ ^„J`^^ ^f th^•J\,,,\,-,1,,-|,|J,,,,,:,,.,F'.+,I'`.,.+\-`-.I''`.-1`'I.1`.`,`,I`''`-
could now be tipped over and rolled to a new
^_^L` i_ I,__L __ ^__-+L~ -- ----:L~l- ^&--th-+--~1,IL,,,.,,\\.I.,+11`,.,,,,\,\,L,,1*.,I,1,1^,,\,,\-,,,,1\-,1,,\-,,\-\,
location. These plants shall be hauled by the ball
:_ J-._ _..+ +L_ -_-J,- --J --^L~ :- ,\,-----,.,\J\*:,\,1,,,L,,\-,\,\,1-,,,,,\,1-1^,1,,,+,,,,1,,,,,\-1^
only and not by the plant itself. The slightest
:_._._JZ-,-I.. ',,:+L~ +L- ---I,i-- --+-,:~1 Th- ,--,,,,,,,\-|J,|,||-,,,,,u,1,,\-|,-\,.\...g'''r-~+,,,-,,,,,\,,,\~\,
indication of manufactured earth balls or hauling
__..lJ --.., L-+I---A --,----I --lI-A +----,\\.\,|A,\|,,\,,,1,\-,,I,I,\-\|\,,\,,\,I.-'\,..+,-~\,...`,''
of the plants itself will be a cause for rejection of
I-^_.:_. Th^^^ -I- J`^ ^L`-lI L`^ L`-.,l^| L`., +I-^ L`-I,\,\,+,+,\, , , ,1-.,\-F, |J, |-,+, ,\*, *,\-' r-\~,\+I- ,~, \-1,1~"^_I. __J__,L`. ,L__I__+:+^_ICTh--'Z_I+,__,`, , ,\~, 1, ,`,1, ,1, `-I, |,I., .1^,`~. . '.- '.9.,`.`-`,`:-A:- +:- -C- -, `-A, ,-A- Jt,L\-'l- ,F\~, I;- ' `J'`^` '`,' `,I.' `1' `,'`.`'` -'`.`-`.`-'`' .,`.' `,`,I '`.`-' 'J_£I.L__I__^I,-_,C. .:' L__^.. __C^--^<^^:^.^,\, L, -I, | , |^, 1^-' '` `.,~1*`.`-`~.,`,'`,.'`-J\-\.|,\, ,\, ^. _1^_I__,-., 1\., I, \,I'~~,.
such plants.

I, , ~ t\ , --.__ A,__&__ _,___ Ill_,I___, I,__I---,-,-,-,,--,.-..-..I-.-..I.`--.-..-..`----^L_^_--_L^.,-_JC_-.L`:^-..--^^^^L`.IIL`^J-L~^,,,+,,++.,,\,+,\,,,.,\-\*,\,,+,,,.,I,,*,I,\,.,\-~,,,1*,,\,\-+,,\-


The provision for ``Tree Planting
ITEM 611 -TREE 611.3,8.1 Tree Planting along National RoadThetreestobeusedforthispurposeshallbethe
PLAN||NG/ Along National Roads" was deleted
Subsection 611.3.8.1, since said activity is prohibited as
• I__.._L,_^ LL_ -__, --I_+___ _, .. ,L~:-l^ --_..,1,,,~,,-.,,1,,\-,\,|,L.,,.,~\,,,,.,`,,,...I-,,I,.`,,.
Tree Planting Along varieties, the root systems of which grow prescribed in Department Order No.
J_..._..._-J --+I.^- +I--^ -rJ^..,.-J +^ -. ,^:I 73, Series of 2014, Prohibited Use.s
National Road, pp. downward rather than sideward to avoid
~:+,.-+:^^~ ..,L^-^ +I.^ -^^*~ ^^-^-A -:A^\`'-.A -^A.,,,1,1,,,\,,,.,,,,,1-,\.,,,\-,\,\,,^,+,,,,+,\,\*`,I+-+,'-\,.\,\,"1~
488-489ITEM611 -TREE situations where the roots spread sideward and Within the Right-of-Way of National
___^__. .__+I. . J-^L-_. ` th----J --J -:J-,\,-'', -I-L\-`-\,I,.,\-11\~`-I'u,\*\,.,u\,,,,,\-,\,1~\,,,,,\,+,,+,\,,,\*,,\+,,\,1,+,,
consequently destroy the road and sidewalk slabs. Roads.

T..___ -L~-ll L- -I--+-A :- - ---+ --\" |,,:+I,:- ,1~-,,\,+..,.,,,1*,,I,\-I,.|,,.|\,-...I-,,\,-,,-,,,,,,+,,,,,1.,,\,


Trees shall be planted in a neat row, within the
-__J -:.I-, ^C ..,.. . /n^|^I\ ._A .^ ~'^^^ `- _^--.'L`I'`,1,`-.I,,'```,I''`.,\'``,-./`-I.--`,`..`,.,`._`,I,`,.,+,I-,'`.
road right-of-way (ROW) and as close as possible
•_ LL_ I.^.Ai I:_:. ...:.L ^..ce^:__. _11^..,.^^^ __ i.L`.i.1+,L,,-,\\,,,,,,,,,L,,,,1,,.,1*,,,\-,1-,,1-1*,,\,,,1*,,\-+-.,\,1,,1*1.
to the ROW limit, with sufficient allowance so that
*L_ L.,---...L~--Z,,'I,, -,-,\,-,\,;11 --+ ---~---L -,I,\.,,\-`.\,-...`,,..,~",=.`,.'.'''`„..-`-'.-I-_-.I-''
PLANTING/ the trees when fully grown will not encroach on
+I-_ _J=_I_:__ _-_-_i. --+-,,-1~ -I--~:---I -+L~-~u,+|J\JJ|,'''''',,I,,\,,,+.,1.,1,,,1,\*\.,,\-,+,\-+I.\,1,,,\,+,1,,+-.
Subsection 611.3.8.1, the adjoining property or touch electric and other
_. I__l^__J ..wl:L, I:--- Th- ---+-~ J,----J~-*`,,-,,,~1,1,\~®"'~,''''`-.,.II'`-`.`-''``-I``,`.`-I,``-'
Tree Planting Along overhead utility lines. The center-to-center
^_-^:_ - L^L. ,___ .-^^^ ^L`.II L~^ 1 ^ -f` _^J-^-^
spacinq between trees shall be 10-20 meters -,,,11+,, ,\+ 1,-1,,+.\-, , 11 \-+,., +,, ,,I,, ,,\- \\, -\, , , ,1-1\-,

Page 4 of 8
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOIL
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
BIuebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSTIFICATIONS


_^_I,\,-- /--\ t=_- ---A --A:--- ,\,:+I, - ------'1,'''`,`'`.`,\'''/'I`,I'`,`.``',`-`.`'-''`,'.'`''.g`-''`-'```',
National Road, pp. metres (in). For road sections with a generally
~ \ , , \ \ \ ~ \, , . -- -. ___. ±_± ± - -. eI'\,IL'I.^,|,L,,\,I,,,I''I'\-I``,````.-,`-`-.,`,II`,I'`-`,'`.`-`,I
488-489ITEM611 -TREE north-south alignment, t:he trees on one side of
L_ ___A -L^_|| L_ -,____-_J .,i-i -,I-,L~_ ,-___ _,I,-,\,|,\J.,,,1,,.1,`-.,|^J=,:,\,I+-`~'`.,1-''-,-.'`-~'`-`,.,`,''
the road shall be staggered vis-a-vis the trees on
+I.^ ^+L`^- ^:J^ ^, +L`^ -^-J "r~ -_-.-__^_+ ..,:11,,,\.\,1,,\.,+,,\*\-\,,1,,\..\,\<--,..I+,-.I_.'=`-'..+,I.+.'..I
the other side of the road. This arrangement will
L-I-,- ---, ,~-+L\-+ ---, ,-L -, ,-I:-L+ 1,,;11 f-lI --+1~-I'\-,I,1++,\-.,1,1,,\~u.+-,\,''\,.=..`......a.'`.'''"I_"`,.'`.''`.
help to ensure that enough sunlight will fall on the
-__J __J ,I..._ I._I_ J,- I,---+I,- ---I A_` -.I--,\,\,\,\,,,\*~,,11.,,,\,,r,\,,\\-\-ru,\-,\,\*\,\*,,\-,\-,.
road and thus help to keep the road dry even
J. .-:__ ,L_ -_:_', ___-__\,,~....9\''\~I1,..I,`,`-I-|,-,,,
during the rainy season.

For roads without curbs, the trees shall be planted t=^--^`J-. .,:+L`_. .+ ^. .^^ +F`^ +-^^^ ^L`-II L`^ ^I-^+^A,\,,,\,1~1,.,,,,L,,\,1*+\,1*,\,.,,,,,\-1,\-\-.,1,,,1,,,1,\-I,,|J,,,:\-\*
with a minimum clear distance of 0.60 in beyond ..,;+A -~:^;~.,~ -i^-, A;^-^,^ ^f r\ £n ~ L`^,,^.A,,,1,,,*,,,I,,,.I.1*.,.\,I+,\-I-..,,-..\,`,\,.`,.--.I.-`,,\,I._
+L~--A---, +I,--L,-,,lJ-~ 1~,,+ ;-------I---th--1,,`-`-1*=\-\,,u,`-`,.,\,,,,\,`-I,,,I-+,,,,,\,--1,\~,\,1,1,+,,-,,
the edge of the shoulder, but in no case less than
® A _-C___ Ll^_ _J_^ _, +L_ __.,____L I-_--__J_.,,,,,,,,,\,,,,1,,\-\-\~9\-\,,,,,\,I.,\~'+,..'\~'.`.I\,I.\,--
3.0 in from the edge of the pavement. For roads
...:,L _..-L`_ __-:_..I_I.. ,_ ..-L__ _-_-- J,L`_ ,-_-_,,,1,,\-,A,,,1,,,,1,I,'\,\,.1,I.,.I.-.--,._.`._-,,.''`-`..`.`.
with curbs, particularly in urban areas, the trees
-L-II L`^ _I__._J ..,:LL -_:_:_.._ ^^th-^l, ^£ 1 A-,''\,''1,\-I,'|,I.+\,`r'''~''`..`'''..'''`-'``.-`-``,`.`-.``,I..`,`,
shall be planted with a minimum setback of 1.00
_ L`_. ,__J +I._ £___ _, +L_ _..-LI...,`-,\,.`\,v'`,I-`,+,`,.,..'`.`._.-.
in beyond the face of the curb.

\A,I-_-_ LL_-_ _-_ I_--:J,,\J,--I J--:--------I- +L~,,,,\-,\-1-,,\-,\-1~,\-,\,,,J,||*\*,,,1*,1*,1*,,,1*,\-\-1*,,1+I.,,1''`-


Where there are longitudinal drainage canals, the
-__- -1^-1' J~- -I--,-A -- +L~- -, .+-- -:J- -, -, ,-I,1,\.\..,.,,,1*,,1,\.,,,1*,,1\-\*1,,,1,,\-\,1*1\-,+,,I-\-\,,1,1~\-,,
trees shall be planted on the outer side of such
-\---.---..-...-`-.-`'``'`-``,''``,`-.`,````''`.,`.`.I'`,',`.''r-'''``~'.,`-`,`'`,''`,,
canals. On the roadway curves and intersections,
L_ __-:___L J__`.__ _+__J_-J^ __ _:_I-, J:_+____L,,\.I,\.,,,,,1-,,,\*\-1,,=,,+,1^,,,\*\*,\*+,\,''|,.a..\\,.1,1^,"\,\,
the pertinent design standards on sight distance
^L_I' I._ _I-^^_,^J
shall be observed.

^i__ L-_.._-__L`,_ L`___-I_ ,-_. ,r__ ..,.:*z__ -L`_J''`,''`'`.'`-I',``.,'`.''`--I-'`.`,\'-''''`,,''_'`'''=`,''`._,


Non-traversable hazards (ravine, waiting shed,
^,_ \ _,___ J.L_ I,__ _C ,--_-_L_'' L~- ---. ,,J-J ..,.',`.1~./11'\,'',,u,\-,,,,\.\,,L,\.1-.,,,,+*,,\,\-I,,\,,,,,\.\^,,,1,,
etc.) along the line of trees shall be provided with
___-__-:_L_ I-_-i__ _ _ _.._-J-.,I^ ._J _I__-I,`.,,,,'`,I,I.`1``,.,.-I''`.I`,,`-'=',=``..I`.'`.'.',,-''`.`-'`-`-II,
appropriate barriers, e.g., guardrails, and clearly
__-I,_J __ ,L-, th--- A- --+ ---- L~-_--A- +,,,\,,,\\,1+,.,+,u,|JIL,,\-.,\-1*\,,,1,1I,\,|,\-,,\*\^*,\11,L|,
marked, so that these do not pose hazards to
motorists, - _ , _ -'. -

The Contractor concerned shall undertake and be


"_ ,__L-_-_-__-----J -1^-11..-A---I,---J I+-
-_^.^-^:I-'^ ,^- +L`^ _-:^+^~-.-^ _, +L^ _I-.+^J,\-.J',|,,,+,,|,,\-,1,,u,\-,,,-,,,~\,,,r~,,\~\-\,,+,,+~,,,\,,,+\~+~
responsible for the maintenance of the planted
•__^_ J..;__ LL^ ^^-dr_-..,_--__L, _^-:_I _{ .I-_,,+.\..,1*1,,,,,,L,,\-`.`,,,+I-\,,'.-..,~..~,I,`,I'`,|,`,.+..`+
PLANllNG/ trees during the contract warranty period of the
-__J _-_i_A ---,-~-A L~\ , L:- ---+,-A Th-
Subsection 611.3.8.1, road project covered by his contract. The

Page 5 Of 8
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
Bluebook Volume 11, 2012 Edition

ITEM EXISTING PFIOVISION AMENDMENTS JUSTIl=ICATIONS


^__+--.+^-/~ ..-:..^^---^ ..i^-lr rL`±11±^)-)1111|J111±
Tree Planting Along contractor's maintenance work shall comply with FVTTT7ai:;..|I - I I I.ill lL-I I..I I-- , , `,, ,` .. ,i., , .`,, . ,,,, , , . . ., ,
•.I.^ _-_..:^:^.^ ^F ^,.I.^^^:^-Z:11 -1n/l^/-:Lai±1naCTTcyTVVT-rvTllJI-.|IJ---.i`|u`J--..J.-`i\--..in-..II=£L-^_-_I..11
National Road, pp. the provision of subsection 611.3.10 (Watering
__.I ^,_:_J-_.^-.^--\ Th---:-+---^^--i +,--,,_-LiCITTuI-TullI.+IlulI--/.III-II..-.I..-I..I.1`-`-`r...`.`..--..-..
488-489 and Maintenance). The maintenance of trees shall
I-_ £-:.L£..Il-. ..-J^.A-Ir^--^ `^ ;r`+^^--I ^-A ^£_±Lz3-zTTc.ruliiiilyullu-Iu.i`-IIu-u......`.3....rr.-..`r....`.
be faithfully undertaken as an integral part of the
..__..I_.. -_.J _-:.+^^-^^^ ^-^^'._ -nA -L`:-1J|TcguTaT-vauTir.iilT.-rluil--ril`|:i.u.Iiull.I-...-w-`-
regular road maintenance program and shall be
:_-I. .I,-,I :. +L`^ -,`.-,`.A-+L^-^f^r^ -I. -i±ahliJ±riiJarlzTITcn]ac=TrrlLI1`:I-iz`|Ii-LiI-I-i`il-.I.I.I.`,a..,.-.,,`,,.`
included in the reports therefore as a regular work
:.^_ ....J^. ^.+:.,:L, ^1^ .nf\ ^F +LA_ l|1aLiiii-ITT-rTT-TTTIT=rA:+uvl-yI.`1.-`//`i.u..,,,:,,,,,r.,
item under Activity No. 209 of the Highway
- --_ ± _-, _._____i _ __._..= _.-=_-,`,CJ,,,,1,,u,,+~,+~,,,,Lr-,1^.I'1.`~.`-.,.
Maintenance Activity Standards.

".^ .-_^ _I-.+:.~ -L-lI L`^ .I^J^*-I/^^ n^+_Ahli,T'T=L'++I,,u,,L,,,:,J,,|J,,I,-1,,.1++.'``..`-''''`,``,''',


The tree planting shall be undertaken not only
_I _-._ __,:__-I -^.A-----,----J i-, ,--I+,, ,hi-aT-7TI:!II.lu`|II.11Ill.Z`|-rll`l:glu..r..1`.`-.`+.`-`r..`--I`-`~-r`r. .
along national roads programmed for construction
_.. I.-._.._..__._-, L~, ,, -I---I----\,:A;A--1+:--iUT-1TT|Jr`lv-III-IILilJu..JI-`J.I.`Jr.:1`,r`.--...=..`i.Ivr--.
or improvement, but also along existing national
_^-J- _-_^^:.11., th^-^ ^„ho:J^ A^.i^J^jn^A _LlrL±i1Tvaa---F7CcrczTTyLIIl|--`Ju-I`--`J-v-r`iFr-ui-'.'-"
roads especially those outside developed urban
_-^--..,1^^.,^ th^-^ --^ ^^ ho^^-^r ^rul---£aiiii=aacaT-a--TTTcr-.IT-::I+cll-I1`,.,...`,,`,,,,,.,.,,....
areas where there are no trees or only a few trees
L-. ,^ I-^---I--.^J t=^-^..~L ^`i..^+;^^ E^-1iEIJ1TTavc-CFTTF7l.Irl.l=l|.I`Jl-`.-11-r`I--I.I:|I`i..`i-zi.ir`-
have been planted. For such existing roads, the
\~ --_ __-._-_ ___-____I ±_-e._.-_= -..=.=.==--.--==_--._-=,.rT¥T|TrcFT-Ic;.:I./Iul1.11I:l-II.11.IJ-.Ar1`1`.I.A+.``.II.+r-..`-
required tree planting shall be undertaken by the
n:^..:.. r=^^:..^^.:^^ ~^^ ^^^^^-^L_ n,alEaaTpr-crTCF-TT:)lII`=|:IIII>1`JIII---`'`'--I'I--.III--I-`'
District Engineering Office concerned. The tree
_I-_.:.- -I--lI L^ . ...A^*-Lir`^ ;A L`^£L±a)1J±1±JJ±T7TqTTFTrTS]-;Zlrclll.I-ulI.I-Iowl`-n.I,w`,.,,`.`,,,.,.....,
planting shall be undertaken in both contractual ..-_=^^+~ ..I -,-+-A, hl , +A-;-;r+:r±J±.aLT7Tngcl;l-.JIIll|ii`i)--i~.rru`i.I..Ilr.I.I.-..`rlI,
projects and projects by administration.

ITEM 611 -TREEPLANTING/Subsection611.3.10, 611.3.10 Watering and Maintenance 611.3.10 Watering and Maintenance

All plants shall be watered during the planting AI p)ialaRs trees/seed/.ings/saplings siniRiM be Replaced the term ``plants" and
``life" with a more appropriate term..
Watering and operations, subject to direction and approval of watered during the planting operations, subject to
Maintenance, pp. the Engineer. From time to time during the life of direction and approval of the Engineer. From time
489-490 the Contract, sufficient water shall be applied so to time during the life dw„.ng of the Contract,
that not only will the topsoil backfill about each sufficient water shall be applied so that not only
plant be kept moist, but also for moisture to will the topsoil backfill about each plant be kept
extend into the surrounding soil.TheContractorshall,during the life of theContract,properlycareforallplantsfurnished, moist, but also for moisture to extend into thesurroundingsoil.

Page 6 of 8
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOR
DPWH STANDARD SPECIFICATION FOR ITEM 611 -TREE PLANTING
Bluebook VolLlme 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSTIFICATI0NS

planted or stored, performing such watering, The Contractor shall, during the life c/wra[/.ar of the
weeding, cultivating or other ordinary Contract, p roperly ca re fo r aII
maintenance work as shall be necessary to keep trees/seedlings/saplings fuwisiirvnd, prrdrrferd or
the stock in a live and healthy condition.Plantswhichhavediedbackintothe crown or stored, performing such watering, weeding,cultivatingorotherordinarymaintenanceworkasshallbenecessarytokeepthestockinaliveand

beyond a normal pruning line shall be replaced by healthy condition.P)aipksTrees/seedl i ngs/sa pl i ngs which heNe diRrdbackintothecrownorbeyondanormalpruninglineshallbereplacedbytheContractoratnoadditionalexpense..o.`,4eGG.r`e,-,F},f#e,B. . The phrase ``to the Government"
the Contractor at no additional expense to theGovernment. was deleted.

ITEM 611 -TREEPLANTING/Subsection611.3.12, 611.3.12 Dead Trees 611.3.12 Dead Trees

Before completion and final acceptance of the The phrase ``not healthy"
Before completion and final acceptance of the was
Dead Trees, p. 490 project, all trees not healthy or that have died project, all uwhea/£A/ frees f}ef or that have died changed to ``unhealthy''.
back into t:he crown or beyond the normal pruning back into the crown or beyond the normal pruning
line shall be replaced by the Contractor at his own line shall be replaced by the Contractor at his own
expense with trees of the specified species or expense with trees of the specified species or
variety, size and quality and meeting the variety, size and quality and meeting the
Specification. Specification.

ITEM 611 -TREEPLANllNG/Section611.5,Methodof 611.4 Method of Measurement 611.4 Method of Measurement

The quantity to be paid for shall be the number of The quantity to be paid for shall be the number of Replaced the word ``furnished" by
`` provi ded " for a more
Measurement, p. 490 trees of each specie or variety called for in the seedlings/saplings of each specie or variety called
Plans furnished, planted and accepted with the for in the Plans or /„ 41e pnoi//5/.ans, planted and understandable term. It was also
necessary mulch, topsoil, water, fertilizer and acf!fxpfued/certified by the Engineer with the specified that this shall be certified
other incidentals to complete the Item. necessary mulch, topsoil, water, fertilizer andotherincidentalstocompletetheItem. by the Engineer prior to payment.

Page 7 of 8
SUMMARY OF JUSTIFICATIONS ON THE PROPOSED AMENDMENT FOR
DpwH STANDARD SpEclFlcATloN FOR ITEM 611 -TREE pLANnNG
Bluebook Volume 11, 2012 Edition

ITEM EXISTING PROVISION AMENDMENTS JUSIIFICA"ONS

ITEM 611 -TREEPLANllNG/Section611.5,Basisof 611,5 Basis of Payment 611.5 Basis of Payment

The quantities as determined in Section 611.4, The quantities as determined in Section 611.4, Included new pay item numbers for
Payment, pp. 490- Method of Measurement, shall be paid for at the Method of Measurement, shall be paid for at the tree replacement program and
491 Contract Unit Price each of the trees of each Contract Unit Price each of the trees of each mandatory tree planting in line with
species or variety furnished, planted and accepted species or variety furnished, planted and accepted D.O. 238, Series of 2022,
which price and payment. which price and payment shall constitute full Mandatory Tree Planting as part of
compensation for furnishing all labor, tools and the Environmental Sustainability
Payment shall be made under:PNa::titDescription Meausnuj:°Jent611(1)I::::o(,::[ri:lingandEach incidentals to complete the Item.Paymentshallbemadeunder:PayItem Unit of Program for DPWH Flood controlProjects.

611 (2) Trees ITransplanting) Each N umber Desc'.I Pt'°h Measu rement611(1)I:=nsD(,::::i%h)'ngandEach611(2)TreesITransplanting)EachED.--i.`„-.'' .-11=

Page 8 of 8

You might also like