PROJECT: CPSC HOSTEL BUILDING

LOCATION: CPSC compound, Balbagon, Mambajao, Camiguin


DATE: May 5, 2023

SKIM COAT
Quantity Length (m) Height (m) AREA (sq.m)
1 29.99 2.75 82.4725
1 24.34 2.75 66.935
1 14.93 2.75 41.0575
1 14.87 2.75 40.8925
1 14.74 2.75 40.535
1 13.66 2.75 37.565
2 1.80 0.68 2.448
1 19.94 2.75 54.835
1 20.23 2.75 55.6325
1 1.08 2.75 2.97
1 5.08 1.3 6.604
1 2.125 4.18 8.8825
1 17.78 3.87 68.8086
1 2.00 3.87 7.74
1 21.29 4.13 87.9277
Less: 14 1.4 1.2 -23.52
4 1.6 2.1 -13.44
4 0.6 0.6 -1.44
8 0.9 2.1 -15.12
4 0.7 2.1 -5.88
1 1.0 2.1 -2.1
4 0.43 0.6 -1.032

TOTAL: 542.7738

SUMMARY
Item Unit Cost (Php/sq.m) Area (sq.m) Cost (Php)
Skim Coat 40.00 542.7738 ₱21,710.95
GRAND TOTAL: ₱21,710.95

Prepared & Checked by:


Engr. Judy F. Abao
22.594
11
7.36
4.6
1.846
2.97
1.1
0.33
8.085
1.736
0.728
0.248
2.9319
1.164
1.08
1.685
First Day = 69.4579 ₱ 2,778.32 213.7166
₱18,932.64 ₱1,262.18