Professional Documents
Culture Documents
Project Status - 31.03.23
Project Status - 31.03.23
on LSTK basis for Group-II ( For SH, NQO & MHN Complex ).
OFFSHORE MARINETECH PVT. LTD. Replacement Contract No. : MR/MH/MM/LSTK/SM/GI HDR AND LNE/2018-19/Y15KC19002/9030009674
ONSHORE ACTIVITY OFFSHORE ACTIVITY STATUS AS ON DT.31.03.2023
Final Installation
SOW ACTUAL Raw- ONGC/TPI Shutdown & Dismantling
PRIORITY Process Well Head SOW ACTUAL Material Pre- Inspection Dispatch to Positive Temporary Piping,Valves,Instru Precommissioning Commissioning
Sr.No. Total GI Engineering Material NDT Dispatch De- of Existing NDT OFFSHORE STATUS
LEVEL Complex Platform #Header #Header Procurement Fabrication (Fabricated JNPT/NHAV Isolation Diversion mentation / Activity Activity
Lines Lines Inspection Clearance pressurization Piping Sys.
Spools) A Structural Supports
1 P2 NQO LE 1 6 1 6 Completed Completed Completed Completed Completed Completed Completed Completed Awaited - - - - - - - NO WORK FRONT AT SITE
2 NA NQO LC 1 10 1 10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
3 P2 NQO LD 1 8 1 8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
4 P1 NQO NE 0 3 1 3 Completed Completed Completed Completed Completed Completed Completed Completed Awaited - - - - - - - MATERIAL SHIFTING IN PROGRESS TO CARRYOUT WORK.
5 P1 NQO N6 1 7 1 6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
6 NA NQO NH 1 5 1 5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
7 NA NQO LB 1 7 1 7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
8 P1 NQO LA 1 7 1 7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
9 P3 NQO N4 1 8 0 0 Completed Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled
10 NA NQO N8 1 10 1 10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
11 P3 NQO N12 1 7 1 7 Completed Completed Completed Completed Completed Inprogress - - - - - - - - - - Inspection awaited.
12 P3 NQO N20 0 2 0 2 Completed Completed Completed Completed Completed Inprogress - - - - - - - - - - Inspection awaited.
13 P3 NQO ND 1 4 0 0 Completed Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled Cancelled
14 NA SHP IM 1 10 1 10 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
Project : Replacement of Gas Injection Headers & Gas Injection Lines at Offshore Unmanned/Process Platforms of Mumbai High Asset on LSTK basis for Group-II ( For SH, NQO & MHN Complex ).
OFFSHORE MARINETECH PVT. LTD. Replacement Contract No. : MR/MH/MM/LSTK/SM/GI HDR AND LNE/2018-19/Y15KC19002/9030009674
ONSHORE ACTIVITY OFFSHORE ACTIVITY STATUS AS ON DT.31.03.2023
Final Installation
SOW ACTUAL Raw- ONGC/TPI Shutdown & Dismantling
PRIORITY Process Well Head SOW ACTUAL Material Pre- Inspection Dispatch to Positive Temporary Piping,Valves,Instru Precommissioning Commissioning
Sr.No. Total GI Engineering Material NDT Dispatch De- of Existing NDT OFFSHORE STATUS
LEVEL Complex Platform #Header #Header Procurement Fabrication (Fabricated JNPT/NHAV Isolation Diversion mentation / Activity Activity
Lines Lines Inspection Clearance pressurization Piping Sys.
Spools) A Structural Supports
15 P1 SHP EC 1 6 1 6 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
16 NA SHP ED 1 3 1 4 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
17 NA SHP S1-4 1 5 1 5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
19 NA SHP IE 1 9 1 8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
20 NA SHP IT 1 5 1 5 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
22 P2 SHP SS 0 0 1 5 Completed Completed Completed Completed Completed Inprogress AWAITED FOR INSPECTION
25 NA SHP S1_5 1 7 1 7 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed COMPLETED
COMPLETED.
Flushing line added in SOW, therefore total lines for
replacement to be read as 09 Nos (includes GI lines, Header
26 NA SHP S1_6 1 5 1 8 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed & flushing line ) inplace of 08 lines (GI & Hdr)
29 P2 MHN N_1 1 7 1 7 Completed Completed Completed Completed Completed Inprogress - - - - - - - - - - AWAITED FOR INSPECTION
30 P1 MHN N_5 1 7 1 12 Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed - 90% COMPLETED.
31 P2 MHN NL 1 4 1 6 Completed Completed Completed Completed Completed Inprogress - - - - - - - - - - AWAITED FOR INSPECTION
32 P3 MHN NM 1 7 1 7 Completed Completed Completed Completed Completed Inprogress - - - - - - - - - - AWAITED FOR INSPECTION
TOTAL 28 188 24 164
PRIORITY
LEVEL: -
P1 CRITICAL
P2 HIGH
P3 MEDIUM
P4 LOW