You are on page 1of 8

SRI BINARAYA SDN BHD

M&E MASTER SUBMISSION LIST


(SHOP DRAWING SUBMISSION)

PROJECT TITLE: NEXUS CHERAS

SERVICES : MECHANICAL & ELECTRICAL : EKTECH SYSTEMS ENGINEERING SDN BHD UPDATED DATE : 15/6/2023

1st Submission (REV 0) 2nd Submission (REV-1) 3rd Submission (REV-2) 4th Submission (REV-3)
Submission Ref. Target Status Status Target Replied Status Remarks Target Actual Replied Status
No. Description Drawing No. Actual Date Replied Date Target Date Actual Date Replied Date Actual Date
Code Date Date Date Date Date Date

ELV SERVICES
1 MAIN SCHEMATIC DIAGRAM PUBLIC ADDRESS ESE/VONE4079/ELV/CN/17 30 Jun 23
SYSTEM

ELV SERVICES
2 MAIN SCHEMATIC DIAGRAM ACCESS CONTROL
ESE/VONE4079/ELV/CN/21 30 Jun 23

ELV SERVICES
3 ESE/VONE4079/ELV/CN/16 30 Jun 23
MAIN SCHEMATIC DIAGRAM CCTV
ELV SERVICES
4 MAIN SCHEMATIC DIAGRAM TELEPHONE FOR ESE/VONE4079/ELV/CN/18 30 Jun 23
SERVICE APARTMENT
ELV SERVICES
5 MAIN SCHEMATIC DIAGRAM SMATV FOR SERVICE ESE/VONE4079/ELV/CN/19 30 Jun 23
APARTMENT

ELV SERVICES
6 ESE/VONE4079/ELV/CN/22 30 Jun 23
MAIN SCHEMATIC DIAGRAM BARRIER GATE

ELV SERVICES
7 ESE/VONE4079/ELV/CN/23 30 Jun 23
MAIN SCHEMATIC DIAGRAM PANIC BUTTON

ELV SERVICES
8 MAIN SCHEMATIC DIAGRAM FIREMAN INTERCOM
ESE/VONE4079/ELV/CN/20 30 Jun 23

ELV SERVICES ESE/ELV/NEXUS1/TL


9 LEGEND DRAWING
ESE/VONE4079/ELV/CN/00
/011
6 Jun 23 6 Jun 23 PENDING

ELV SERVICES ESE/ELV/NEXUS1/TL


9 SITE PLAN
ESE/VONE4079/ELV/CN/01
/008
16 Feb 22 16 Feb 22 22 Feb 22 A

ELV SERVICES ESE/ELV/NEXUS1/TL


10 ESE/VONE4079/ELV/CN/02 27 Oct 22 27 Oct 22 7 Nov 22 C 29 Nov 22 29 Nov 22 10 Jan 23 C 16 Feb 22 16 Feb 22 22 Feb 22 A
LOWER GROUND FLOOR PLAN /001/005/008

ELV SERVICES ESE/ELV/NEXUS1/TL


11 ESE/VONE4079/ELV/CN/03 27 Oct 22 27 Oct 22 7 Nov 22 C 29 Nov 22 29 Nov 22 10 Jan 23 C 16 Feb 22 16 Feb 22 22 Feb 22 A 6 Jun 23 6 Jun 23 PENDING
GROUND FLOOR PLAN /001/005/008/011

ELV SERVICES ESE/ELV/NEXUS1/TL


12 ESE/VONE4079/ELV/CN/04 27 Oct 22 27 Oct 22 7 Nov 22 C 29 Nov 22 29 Nov 22 10 Jan 23 C 16 Feb 22 16 Feb 22 22 Feb 22 A 6 Jun 23 6 Jun 23 PENDING
LEVEL 1 FLOOR PLAN /001/005/008/011

ELV SERVICES ESE/ELV/NEXUS1/TL


13 ESE/VONE4079/ELV/CN/05 27 Oct 22 27 Oct 22 7 Nov 22 C 29 Nov 22 29 Nov 22 10 Jan 23 C 16 Feb 22 16 Feb 22 22 Feb 22 A 6 Jun 23 6 Jun 23 PENDING
LEVEL 2-6 FLOOR PLAN /001/005/008/011

ELV SERVICES ESE/ELV/NEXUS1/TL


14 LEVEL 7 FLOOR PLAN
ESE/VONE4079/ELV/CN/06
/008/011
16 Feb 22 16 Feb 22 22 Feb 22 A 6 Jun 23 6 Jun 23 PENDING

ELV SERVICES ESE/ELV/NEXUS1/TL


15 ESE/VONE4079/ELV/CN/07 16 Feb 22 16 Feb 22 22 Feb 22 A 6 Jun 23 6 Jun 23 PENDING
LEVEL 8 FLOOR PLAN /008/011
ELV SERVICES ESE/ELV/NEXUS1/TL PENDING
16 ESE/VONE4079/ELV/CN/08 6 Jun 23 6 Jun 23
LEVEL 9 FLOOR PLAN /011 STATUS
ELV SERVICES ESE/ELV/NEXUS1/TL PENDING
17 LEVEL 10 TO 22 AND 24 TO 40 FLOOR PLAN
ESE/VONE4079/ELV/CN/09
/011
6 Jun 23 6 Jun 23
STATUS
ELV SERVICES ESE/ELV/NEXUS1/TL PENDING
18 LEVEL 23 FLOOR PLAN
ESE/VONE4079/ELV/CN/10
/011
6 Jun 23 6 Jun 23
STATUS
PENDING
ELV SERVICES
19 ESE/VONE4079/ELV/CN/11 13 Jun 23 12 Jun 23 COMMENT
LEVEL 41 FLOOR PLAN
UNOFFICIAL
PENDING
ELV SERVICES
20 LMR FLOOR PLAN
ESE/VONE4079/ELV/CN/12 13 Jun 23 12 Jun 23 COMMENT
UNOFFICIAL
ELV SERVICES ESE/ELV/NEXUS1/TL
21 ESE/VONE4079/ELV/CN/15 29 Dec 22 29 Dec 22 10 Jan 23 A 16 Feb 22 16 Feb 22 22 Feb 22 A
MDF ROOM DETAILS /007/008

ELV SERVICES ESE/ELV/NEXUS1/TL


22 ESE/VONE4079/ELV/CN/14 29 Dec 22 29 Dec 22 10 Jan 23 A 16 Feb 22 16 Feb 22 22 Feb 22 A
GUARD HOUSE BARRIER GATE DETAILS /007/008

ELV SERVICES ESE/ELV/NEXUS1/TL


23 ESE/VONE4079/ELV/CN/26 29 Dec 22 29 Dec 22 10 Jan 23 A 16 Feb 22 16 Feb 22 22 Feb 22 A
SECURITY ROOM DETAILS /007/008

ELV SERVICES ESE/ELV/NEXUS1/TL


24 DETAIL RISER LG TO LEVEL 2
ESE/VONE4079/ELV/CN/24
/007/008
29 Dec 22 29 Dec 22 10 Jan 23 B 16 Feb 22 16 Feb 22 22 Feb 22 A

ELV SERVICES ESE/ELV/NEXUS1/TL


25 DETAIL RISER LEVEL 3 TO LEVEL 8
ESE/VONE4079/ELV/CN/25
/007/008
29 Dec 22 29 Dec 22 10 Jan 23 B 16 Feb 22 16 Feb 22 22 Feb 22 A

ELV SERVICES ESE/ELV/NEXUS1/TL


26 DETAIL AND ELEVATION FOR ELV SERVICES
ESE/VONE4079/ELV/CN/27
/008
16 Feb 22 16 Feb 22 22 Feb 22 A

ELV SERVICES
ESE/ELV/NEXUS1/TL PENDING
27 ELV LAYOUT ESE/VONE4079/ELV/CN/13 14 Jun 22 14 Jun 22
/013 STATUS
APARTMENT UNIT TYPE A,B,B1&C

Note:
A - Approve
B - Approved with Comment
C - Reject
SRI BINARAYA SDN BHD
M&E MASTER SUBMISSION LIST
(CATALOGUES SUBMISSION)
PROJECT TITLE: NEXUS CHERAS
SERVICES : MECHANICAL & ELECTRICAL : EKTECH SYSTEMS ENGINEERING SDN BHD UPDATED DATE : 15/6/2023

1st Submission (REV 0) 2nd Submission (REV-1) 3rd Submission (REV-2)


Target Actual Replied Status Target Actual Replied Status Target Actual Replied Status Remarks
No. Description Brand Model
Date Date Date Date Date Date Date Date Date

CABLES 4 Nov 22 4 Nov 22 16 Nov 22 A


1 CAT5E CABLE BELDEN 4 Nov 22 4 Nov 22 16 Nov 22 A
2 RJ11 CABLE BELDEN 4 Nov 22 4 Nov 22 16 Nov 22 A
3 RJ6 CABLE BELDEN 4 Nov 22 4 Nov 22 16 Nov 22 A
4 OPTICAL INDOOR OUTDOOR DROP CABLE & CERTIFICATE KEBEX 4 Nov 22 4 Nov 22 16 Nov 22 24 Nov 22 24 Nov 22 24 Nov 22 A
5 1.5MM2 PVC CABLE MEGA 4 Nov 22 4 Nov 22 16 Nov 22 24 Nov 22 24 Nov 22 24 Nov 22 A
6 2.5MM PVC CABLE MEGA 4 Nov 22 4 Nov 22 16 Nov 22 A
7 CONDUIT PVC PIPE AND ACCESORRIES WIREMAN 4 Nov 22 4 Nov 22 16 Nov 22 A
8 METAL CABLE TRAY U-LI 4 Nov 22 4 Nov 22 16 Nov 22 A
9 METAL TRUNKING U-LI 4 Nov 22 4 Nov 22 16 Nov 22 A
10 INDOOR RISER (MID SPAN) CABLE & CERTIFICATE KABEX 4 Nov 22 4 Nov 22 16 Nov 22 A

11 FTTH SYSTEM
12 OPTICAL DISTRIBUTION FRAME (ODF) KABEX 14 Jun 23 14 Jun 23 PENDING
13 FIBER TERMINATION BOX 8/12/16/24PORT KABEX 14 Jun 23 14 Jun 23 PENDING
14 FIBER WALL SOCKET (FWS) KABEX 14 Jun 23 14 Jun 23 PENDING
FIBER ASSEMBLY CONNECTOR KABEX 14 Jun 23 14 Jun 23 PENDING
15 FIBER ADAPTER KABEX 14 Jun 23 14 Jun 23 PENDING
PATCHCORD & PIGTAILS KABEX 14 Jun 23 14 Jun 23 PENDING
19
20
21 CCTV SYSTEM
22 IP 4MP IR INDOOR DOME CAMERA HIKVISION 14 Jun 23 14 Jun 23 PENDING
IP 4MP IR OUTDOOR IR CAMERA HIKVISION 14 Jun 23 14 Jun 23 PENDING
23 NETWORK VIDEO RECORDER HIKVISION 14 Jun 23 14 Jun 23 PENDING
VIDEO MANAGEMENT SYSTEM HIKVISION 14 Jun 23 14 Jun 23 PENDING
24 POE NETWORK SWITCH HIKVISION 14 Jun 23 14 Jun 23 PENDING
25 VIDEO FIBER CONVERTER HIKVISION 14 Jun 23 14 Jun 23 PENDING
26 VIDEO SURGE PROTECTOR HIKVISION 14 Jun 23 14 Jun 23 PENDING
27 POWER SURGE PROTECTOR HIKVISION 14 Jun 23 14 Jun 23 PENDING

CA SYSTEM
IP-BASED door access Controller Unit ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Gbps Network Switch ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Facial Recognition panel ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Mobile credential reader ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
QR code reader ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Surge Arrestor ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Electromagnetic Lock c/w sensor ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
BATTERY ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Power Supply Unit ENTRYPASS 14 Jun 23 14 Jun 23 PENDING
Emergency Break Glass ENTRYPASS 14 Jun 23 14 Jun 23 PENDING

FIRE INTERCOM
Master Handset Panel MICRO-CTL MICTRON
14 Jun 23 14 Jun 23 PENDING
800
RTTU MULTIPLEX UNIT MICRO-CTL M800-
14 Jun 23 14 Jun 23 PENDING
RTTU-ALL
Sealed Lead Acid Battery MICRO-CTL MSL12V 14 Jun 23 14 Jun 23 PENDING
Remote Handset MICRO-CTL M8-FTBC 14 Jun 23 14 Jun 23 PENDING
Remote Handset Box MICRO-CTL M8-TBB 14 Jun 23 14 Jun 23 PENDING

PUBLIC ADDRESS SYSTEM


24 DC Automatic Battery Changeover AMPERES BC9740 14 Jun 23 14 Jun 23 PENDING
Power supply AMPERES PS9400 14 Jun 23 14 Jun 23 PENDING
8CH / 12CH Decoder / Zone Selector AMPERES ZS5121 14 Jun 23 14 Jun 23 PENDING
Fire Alarm Interface AMPERES 14 Jun 23 14 Jun 23 PENDING
Media player AMPERES 14 Jun 23 14 Jun 23 PENDING
Emergency Paging Panel AMPERES EP1200 14 Jun 23 14 Jun 23 PENDING
Message Recorder / Player AMPERES 14 Jun 23 14 Jun 23 PENDING
Automatic Amplifier Fault Changeover AMPERES AX3800 14 Jun 23 14 Jun 23 PENDING
Amplifier Monitor Panel AMPERES AM4120 14 Jun 23 14 Jun 23 PENDING
Mixer Pre-Amp AMPERES MX2222 14 Jun 23 14 Jun 23 PENDING
AMPLIFIER AMPERES PA2480 14 Jun 23 14 Jun 23 PENDING
SURFACE CEILING SPEAKER AMPERES CS606 14 Jun 23 14 Jun 23 PENDING
BOX SPEAKER AMPERES BS410 14 Jun 23 14 Jun 23 PENDING
HORN SPEAKER AMPERES HS815 14 Jun 23 14 Jun 23 PENDING
Paging Mic AMPERES PM1120 14 Jun 23 14 Jun 23 PENDING
19'' Equipment Rack AMPERES 14 Jun 23 14 Jun 23 PENDING

29 SMATV SYSTEM
30 FM Channelised Amplifier IKUSI 14 Jun 23 14 Jun 23 PENDING
31 UHF Channelised Amplifier IKUSI 14 Jun 23 14 Jun 23 PENDING
33 Splitter Unit IKUSI 14 Jun 23 14 Jun 23 PENDING
34 Line Amplifier IKUSI 14 Jun 23 14 Jun 23 PENDING
UHF Channelised Antenna IKUSI 14 Jun 23 14 Jun 23 PENDING
35 FM-RADIO ANTENNAS IKUSI 14 Jun 23 14 Jun 23 PENDING
36 Satellite Dish IKUSI 14 Jun 23 14 Jun 23 PENDING
Quattro Optical Low Noise Block (LNB IKUSI 14 Jun 23 14 Jun 23 PENDING
37 Optical Convertor IKUSI 14 Jun 23 14 Jun 23 PENDING

Note :
A- Approved
B- Approved with comments

C- Reject
M&E MASTER SUBMISSION LIST
(METHOD OF STATEMENT SUBMISSION)

PROJECT TITLE: NEXUS CHERAS

SERVICES : EKTECH SYSTEMS ENGINEERING SDN BHD UPDATED DATE : 15/6/2023

1st Submission (REV 0) 2nd Submission (REV-1) 3rd Submission (REV-2)


Status Status Status Remark
No. Description Target Date Actual Date Replied Date Target Date Actual Date Replied Date Target Date Actual Date Replied Date

1 CABLING AND CONDUIT 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

2 CABLING AND FIRE STOPPER INSTALLATION 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

3 FIBER OPTIC 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

4 CCTV 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

5 ACCESS CONTROL SYSTEM 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

6 BARRIER ACCESS CONTROL SYSTEM 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

7 SMATV 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

8 PUBLIC ADDRESS SYSTEM 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

9 FIREMAN INTERCOM 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

10 PANIC BUTTON 29 Nov 22 29 Nov 22 3 Dec 22 C 3 Jan 23 3 Jan 23 10 Jan 23 A

11 SMART HOME AND SMART LOCK 19 Jun 22


4th Submission (REV-3)

4th Submission (REV-3) 5th Submission (REV-4)

Note:
A - Approve
B - Approved with Comment
C - Reject
NEXUS CHERAS

PROGRESS REPORT:
PERIOD :
UPDATED DATE :
SERVICES:
MONTH
DAY T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
DATE
PROJECT & SUPERVISORY STAFF
1 PROJECT MANAGER
2 SITE SUPERVISOR
3 SITE COORDINATOR
WORKER
4 SKILLED WORKER
5 SEMI-SKILLED WORKER
5 GENERAL WORKER
NO. OF WORKERS
NEXUS CHERAS

PROGRESS REPORT:
PERIOD :
SUMMARY OF WORK PROGRESS
PAGE
PREVIOUS CURRENT AHEAD/DELAY (+/-) 2 WEEK LOOK AHEAD SUCCESSOR TRADE

SCH (AS SCH (AS SCH (AS ANTICIP


PER PER PER ATED
PARCEL ACT Δ(%) ACT Δ(%) Δ(%) Δ(DAY) Δ(%) Δ(DAY)
CONTRA CONTRA CONTRA PROGR
CT) CT) CT) ESS (%)

NEXUS CHERAS
Work Description
M&E MASTER SUBMISSION LIST
(SAMPLE BOARD SUBMISSION)

PROJECT TITLE: NEXUS CHERAS UPDATED DATE :

SERVICES :

1st Submission (REV 0)


Target Actual Replied Status Remarks
No. Description Brand Model/Size
Date Date Date

1
2
3
4
5
6
7
8
9
10
13
14

Note:
A - Approve
B - Approved with Comment
C - Reject
CHERAS NEXUS
FAT & DELIVERY SCHEDULE UPDATED DATE :
LEAD ITEM AND TIME
Description Manufacturing Date FAT Date Delivery Date
Remarks
(A) (B) (C )