₱43,800.00 40 Cubic
Dec 18-21, 2021
3 Footings; 3 Columns; 3 Tie-beams
₱15,330.00
₱15,330.00 3832.5
₱2,690.00
₱77,150.00 ₱1,928.75 per cubic (Manual)
₱4,000.00 Padugo
Meal Subsidy (For Continous Pouring
₱8,000.00 Operation)
₱108,200.00
Site ID: PH060001
Cost of Work UOM QTY RATE AMOUNT
Per day Rate of Workers for Two of 1-cement Bagger
day 4.000 ₱10,950.00 ₱43,800.00
Mixer
Miscellaeous ₱4,000.00
₱8,000.00
Grand Total ₱108,200.00
Remarks
40 Cubic
Dec 18-21, 2021
3 Footings; 3 Columns; 3 Tie-beams
3832.5
Padugo
Meal Subsidy (For Continous Pouring
Operation)
Acquiring of Empty Sacks for Site Mixing Concreting Transport of Materials to be used for Concreting