You are on page 1of 82

LAPORAN BULANAN

Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : VII ( TUJUH )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 FEB S/D 28 FEB 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 36.575 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 38.464 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 1.89 %

KUANTITAS BOBOT S/D BULAN LALU BULAN INI S/D BULAN INI
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 6.65 0.101 0.96 0.015 7.61 0.116
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,788.82 0.359 1,309.00 0.124 5,097.82 0.483
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,230.86 1.436 744.00 0.868 1,974.86 2.304
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 809.78 0.224 1,878.00 0.520 2,687.78 0.744
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 735.00 0.417 - - 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,901.58 13.340 972.00 0.815 16,873.58 14.155
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 269.06 0.315 4,668.45 5.458
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 900.00 0.027 2,525.00 0.077 3,425.00 0.104
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,396.02 1.358 1,631.00 0.924 4,027.02 2.282
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,692.00 0.355 1,289.00 0.270 2,981.00 0.626
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 176.00 0.054 111.00 0.034 287.00 0.088
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 34.50 3.962 38.464

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
36.37337960327

1.409964584615
0.201423512088

36.57480311536

VII VIII IX X XI XII XIII


19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###
0.96

1,309.00 1,309.00
744.00 - -

-
### 1,878.00 (1,878.00)
### - -
### -

972.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45
### 269.06

### - -
###
### - - - - - 0.00
- - - -
2,525.00 856.25 856.25 856.25 856.25
- - - - 0.00
-
56.00 54.00
34.00
1,631.00 4,027.02

1,289.00 2,981.00
51,138.25
111.00 287.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXXI ( TIGA PULUH SATU )
No. Paket Kontrak : PAKET 13 TANGGAL : 19 Feb S/D 25 Feb 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 33.553 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 38.464 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 4.91 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 7.37 0.112 0.24 0.004 7.61 0.116
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 4,697.82 0.445 400.00 0.038 5,097.82 0.483
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,763.86 2.058 211.00 0.246 1,974.86 2.304
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 2,178.78 0.603 509.00 0.141 2,687.78 0.744
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 735.00 0.417 - - 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 16,643.58 13.962 230.00 0.193 16,873.58 14.155
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 269.06 0.315 4,668.45 5.458
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 2,825.00 0.086 600.00 0.018 3,425.00 0.104
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 3,540.02 2.006 487.00 0.276 4,027.02 2.282
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 2,392.00 0.502 589.00 0.124 2,981.00 0.626
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 287.00 0.088 - - 287.00 0.088
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 37.11 1.354 38.464

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 400.00
211.00 - -

### -

### - -
### -

230.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 269.06

### - -
###
### - - - - - 0.00

- - - -
856.25 856.25 856.25 856.25
- - - - 0.00

-
56.00 54.00
34.00
4,027.02

2,981.00
51,138.25
287.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 12 Feb S/D 18 Feb 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 37.110 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 20.95 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 7.13 0.109 0.24 0.004 7.37 0.112
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 4,499.82 0.426 198.00 0.019 4,697.82 0.445
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,607.86 1.876 156.00 0.182 1,763.86 2.058
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 1,618.78 0.448 560.00 0.155 2,178.78 0.603
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 735.00 0.417 - - 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 16,433.58 13.786 210.00 0.176 16,643.58 13.962
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 2,250.00 0.069 575.00 0.018 2,825.00 0.086
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,870.02 1.626 670.00 0.380 3,540.02 2.006
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 2,192.00 0.460 200.00 0.042 2,392.00 0.502
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 256.00 0.078 31.00 0.009 287.00 0.088
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 36.13 0.984 37.110

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 198.00
156.00 - -

### -

### - -
### -

210.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
706.25 706.25 706.25 706.25
- - - - 0.00

-
56.00 54.00
34.00
3,540.02

2,392.00
51,138.25
287.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXIX ( DUA PULUH SEMBILAN )
No. Paket Kontrak : PAKET 13 TANGGAL : 5 Feb S/D 11 Feb 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 36.126 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 19.97 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 6.89 0.105 0.24 0.004 7.13 0.109
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 4,178.82 0.396 321.00 0.030 4,499.82 0.426
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,432.86 1.671 175.00 0.204 1,607.86 1.876
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 1,259.78 0.349 359.00 0.099 1,618.78 0.448
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 735.00 0.417 - - 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 16,131.58 13.533 302.00 0.253 16,433.58 13.786
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 1,500.00 0.046 750.00 0.023 2,250.00 0.069
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,546.02 1.443 324.00 0.184 2,870.02 1.626
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 2,192.00 0.460 - - 2,192.00 0.460
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 226.00 0.069 30.00 0.009 256.00 0.078
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 35.32 0.807 36.126

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 321.00
175.00 - -

### -

### - -
### -

302.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
562.50 562.50 562.50 562.50
- - - - 0.00

-
56.00 54.00
34.00
2,870.02

2,192.00
51,138.25
256.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 29 Jan S/D 4 Feb 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 34.903 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 18.75 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 6.65 0.101 0.24 0.004 6.89 0.105
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,788.82 0.359 390.00 0.037 4,178.82 0.396
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,230.86 1.436 202.00 0.236 1,432.86 1.671
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 809.78 0.224 450.00 0.125 1,259.78 0.349
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 735.00 - - - 735.00 -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,901.58 13.340 230.00 0.193 16,131.58 13.533
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 900.00 0.027 600.00 0.018 1,500.00 0.046
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,396.02 1.358 150.00 0.085 2,546.02 1.443
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,692.00 0.355 500.00 0.105 2,192.00 0.460
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 176.00 0.054 50.00 0.015 226.00 0.069
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 34.09 0.817 34.903

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 390.00
202.00 - -

### -

### - -
### -

230.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
375.00 375.00 375.00 375.00
- - - - 0.00

-
56.00 54.00
34.00
2,546.02

2,192.00
51,138.25
226.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : VI ( ENAM )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 Jan S/D 31 Jan 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 28.719 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 34.502 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 5.783 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 5.69 0.087 0.96 0.015 6.65 0.101
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,253.82 0.308 535.00 0.051 3,788.82 0.359
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 870.86 1.016 360.00 0.420 1,230.86 1.436
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 500.00 0.138 809.78 0.224
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - 735.00 0.417 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,293.60 12.830 607.98 0.510 15,901.58 13.340
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 541.00 1.075 385.40 0.766 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - 900.00 0.027 900.00 0.027
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,196.02 1.245 200.00 0.113 2,396.02 1.358
3,208.00 2,166.58 6,950,388.64 0.01 - - - - - -
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,590.00 0.334 102.00 0.021 1,692.00 0.355
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 50.00 0.015 176.00 0.054
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 32.01 2.494 34.50

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
1.409964584615
0.201423512088
27.91359209558
0.805694048352
28.71928614393

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###
0.96

535.00 535.00
360.00 - -

### -

### - -
### -

607.98
- -
-
-

-
-
-

###
### 385.40 65.52 57.81 69.37
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
225.00 225.00 225.00 225.00
- - - - 0.00

-
56.00 54.00
34.00
200.00 2,396.02

1,692.00
51,138.25
176.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 22 Jan S/D 28 Jan 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 34.502 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 18.35 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 6.41 0.098 0.24 0.004 6.65 0.101
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,788.82 0.359 - - 3,788.82 0.359
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,230.86 1.436 - - 1,230.86 1.436
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 529.78 0.147 280.00 0.078 809.78 0.224
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 320.00 0.181 415.00 0.235 735.00 0.417
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,293.60 12.830 607.98 0.510 15,901.58 13.340
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 400.00 0.012 500.00 0.015 900.00 0.027
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,396.02 1.358 - - 2,396.02 1.358
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,692.00 0.355 - - 1,692.00 0.355
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 176.00 0.054 - - 176.00 0.054
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 33.66 0.842 34.50

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### 280.00 (280.00)

### - -
### -
415.00

607.98
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
225.00 225.00 225.00 225.00
- - - - 0.00

-
56.00 54.00
34.00
2,396.02

1,692.00
51,138.25
176.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 15 Jan S/D 21 Jan 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 33.660 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 17.50 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 6.17 0.094 0.24 0.004 6.41 0.098
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,788.82 0.359 - - 3,788.82 0.359
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,230.86 1.436 - - 1,230.86 1.436
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 220.00 0.061 529.78 0.147
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 120.00 0.068 200.00 0.113 320.00 0.181
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,293.60 12.830 - - 15,293.60 12.830
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 926.40 1.841 - - 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - 400.00 0.012 400.00 0.012
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,396.02 1.358 - - 2,396.02 1.358
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,692.00 0.355 - - 1,692.00 0.355
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 176.00 0.054 - - 176.00 0.054
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 33.47 0.190 33.660

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

-
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
100.00 100.00 100.00 100.00
- - - - 0.00

-
56.00 54.00
34.00
2,396.02

1,692.00
51,138.25
176.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 8 Jan S/D 14 Jan 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.156 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 33.470 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 17.31 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 5.93 0.090 0.24 0.004 6.17 0.094
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,485.82 0.330 303.00 0.029 3,788.82 0.359
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 1,110.86 1.296 120.00 0.140 1,230.86 1.436
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 - - 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - 120.00 0.068 120.00 0.068
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,293.60 12.830 - - 15,293.60 12.830
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 741.00 1.473 185.40 0.368 926.40 1.841
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,396.02 1.358 - - 2,396.02 1.358
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,692.00 0.355 - - 1,692.00 0.355
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 176.00 0.054 - - 176.00 0.054
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 32.86 0.609 33.470

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 303.00
120.00 - -

### -

### - -
### -

-
- -
-
-

2,496.66 -
-
-

###
### 185.40 31.52 27.81 33.37
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,396.02

1,692.00
51,138.25
176.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 Jan S/D 7 Jan 2018
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 23.684 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 32.862 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 9.18 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 5.69 0.087 0.24 0.004 5.93 0.090
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,253.82 0.308 232.00 0.022 3,485.82 0.330
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 870.86 1.016 240.00 0.280 1,110.86 1.296
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 - - 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,293.60 12.830 - - 15,293.60 12.830
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 541.00 1.075 200.00 0.397 741.00 1.473
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,196.02 1.245 200.00 0.113 2,396.02 1.358
3,208.00 2,166.58 6,950,388.64 0.01 - - - - - -
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,590.00 0.334 102.00 0.021 1,692.00 0.355
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 50.00 0.015 176.00 0.054
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 32.01 0.853 32.862

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 232.00
240.00 - -

### -

### - -
### -

-
- -
-
-

-
-
-

###
### 32.00 34.00 30.00 36.00
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,396.02

1,692.00
51,138.25
176.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : V ( LIMA )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 DES S/D 31 Des 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 22.27 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 32.01 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 9.73 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 4.45 0.068 1.24 0.019 5.69 0.087
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,003.82 0.285 250.00 0.024 3,253.82 0.308
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 770.86 0.899 100.00 0.117 870.86 1.016
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - 309.78 0.086 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 13,988.60 11.735 1,305.00 1.095 15,293.60 12.830
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - 11,115.00 0.283 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - 1,667.25 0.046 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - 749.94 2.333 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - 882.00 2.450 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - 212.98 0.024 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 406.00 0.807 541.00 1.075
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,673.56 4.295 725.83 0.849 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 1,922.70 1.417 1,353.70 0.998 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,879.73 1.065 316.29 0.179 2,196.02 1.245
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,375.19 0.289 214.81 0.045 1,590.00 0.334
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 43,897.63 0.160 7,240.62 0.026 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 112.00 0.034 14.00 0.004 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 22.62 9.384 32.009

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
22.27373375712

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###
0.80 (0.24)

- 250.00
100.00 - -

-
-
-

### -

### - -
### -

1,075.00
- -
11,115.00
1,667.25

127.49
149.94
212.98

###
### 350.00 69.02 60.90 73.08
### - - - - 100.45 101.00 -201.45

### 725.83

### - -
###
### 1,353.70 257.20 216.59 189.52 243.67 -1,110.03

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
316.29 2,196.02

214.81 1,590.00
7,240.62 51,138.25
14.00 126.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXIII ( DUA PULUH TIGA )
No. Paket Kontrak : PAKET 13 TANGGAL : 25 Des S/D 31 Des 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 22.274 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 32.008 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 9.73 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 5.45 0.083 0.24 0.004 5.69 0.087
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,253.82 0.308 - - 3,253.82 0.308
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 870.86 1.016 - - 870.86 1.016
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 - - 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 15,063.60 12.637 230.00 0.193 15,293.60 12.830
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 485.00 0.964 56.00 0.111 541.00 1.075
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,196.02 1.245 - - 2,196.02 1.245
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,590.00 0.334 - - 1,590.00 0.334
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 - - 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 31.70 0.308 32.008

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

230.00
- -
-
-

-
-
-

###
### 8.96 9.52 8.40 10.08
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,196.02

1,590.00
51,138.25
126.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXII ( DUA PULUH DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 18 Des S/D 24 Des 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 20.864 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 31.701 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 10.84 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 5.21 0.079 0.24 0.004 5.45 0.083
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,253.82 0.308 - - 3,253.82 0.308
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 870.86 1.016 - - 870.86 1.016
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 309.78 0.086 - - 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 14,833.60 12.444 230.00 0.193 15,063.60 12.637
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,667.25 0.046 - - 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 749.94 2.333 - - 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 212.98 0.024 - - 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 285.00 0.566 200.00 0.397 485.00 0.964
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,399.39 5.143 - - 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 3,276.40 2.415 - - 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,196.02 1.245 - - 2,196.02 1.245
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,590.00 0.334 - - 1,590.00 0.334
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 51,138.25 0.187 - - 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 - - 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 31.11 0.594 31.701

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

230.00
- -
-
-

-
-
-

###
### 32.00 34.00 30.00 36.00
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,196.02

1,590.00
51,138.25
126.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XXI ( DUA PULUH SATU )
No. Paket Kontrak : PAKET 13 TANGGAL : 11 Des S/D 17 Des 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 19.383 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 31.107 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 11.72 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 4.97 0.076 0.24 0.004 5.21 0.079
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,003.82 0.285 250.00 0.024 3,253.82 0.308
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 770.86 0.899 100.00 0.117 870.86 1.016
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - 309.78 0.086 309.78 0.086
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 14,633.60 12.276 200.00 0.168 14,833.60 12.444
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 1,020.45 0.028 646.80 0.018 1,667.25 0.046
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 493.78 1.536 256.16 0.797 749.94 2.333
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 169.39 0.019 43.59 0.005 212.98 0.024
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 150.00 0.298 285.00 0.566
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 4,192.52 4.901 206.87 0.242 4,399.39 5.143
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 2,979.46 2.196 296.94 0.219 3,276.40 2.415
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 2,046.73 1.160 149.29 0.085 2,196.02 1.245
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,493.19 0.313 96.81 0.020 1,590.00 0.334
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 48,297.63 0.176 2,840.62 0.010 51,138.25 0.187
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 - - 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 29.02 2.091 31.107

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 250.00
100.00 - -

### -

### - -
### -

200.00
- -
-
646.80

43.55
-
43.59

###
### 24.00 25.50 22.50 27.00
### - - - - 100.45 101.00 -201.45

### 101.37

### - -
###
### 53.45 56.42 47.51 41.57 53.45 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,196.02

1,590.00
51,138.25
126.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XX ( DUA PULUH )
No. Paket Kontrak : PAKET 13 TANGGAL : 4 Des S/D 10 Des 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 17.902 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 29.015 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 11.11 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 4.71 0.072 0.26 0.004 4.97 0.076
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,003.82 0.285 - - 3,003.82 0.285
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 770.86 0.899 - - 770.86 0.899
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 14,288.60 11.987 345.00 0.289 14,633.60 12.276
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 11,115.00 0.283 - - 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - 1,020.45 0.028 1,020.45 0.028
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - 493.78 1.536 493.78 1.536
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 882.00 2.450 - - 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 108.59 0.012 60.80 0.007 169.39 0.019
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 - - 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,972.12 4.644 220.40 0.258 4,192.52 4.901
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 2,572.70 1.897 406.76 0.300 2,979.46 2.196
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,979.73 1.122 67.00 0.038 2,046.73 1.160
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,453.19 0.305 40.00 0.008 1,493.19 0.313
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 46,297.63 0.169 2,000.00 0.007 48,297.63 0.176
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 126.00 0.038 - - 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 26.54 2.475 29.015

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

345.00
- -
-
1,020.45

83.94
-
60.80

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 108.00

### - -
###
### 73.22 77.28 65.08 56.95 73.22 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
2,046.73

1,493.19
48,297.63
126.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XIX ( DELAPAN BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 27 Nov S/D 3 DES 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 16.422 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 26.540 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 10.118 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 4.45 0.068 0.26 0.004 4.71 0.072
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 3,003.82 0.285 - - 3,003.82 0.285
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 770.86 0.899 - - 770.86 0.899
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 13,988.60 11.735 300.00 0.252 14,288.60 11.987
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 5,321.56 0.136 5,793.44 0.148 11,115.00 0.283
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 401.56 1.115 480.44 1.335 882.00 2.450
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 49.44 0.006 59.15 0.007 108.59 0.012
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 - - 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,673.56 4.295 298.56 0.349 3,972.12 4.644
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - - - - - - - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 1,922.70 1.417 650.00 0.479 2,572.70 1.897
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,879.73 1.065 100.00 0.057 1,979.73 1.122
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,375.19 0.289 78.00 0.016 1,453.19 0.305
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 43,797.63 0.160 2,500.00 0.009 46,297.63 0.169
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 112.00 0.034 14.00 0.004 126.00 0.038
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 23.88 2.659 26.540

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

9,625.00
4,140.00 - -
13,765.00 5,793.44
-

-
81.67
59.15

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 146.29

### - -
###
### 117.00 123.50 104.00 91.00 117.00 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,979.73

1,453.19
46,297.63
126.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : IV( EMPAT )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 Nov S/D 30 Nov 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 15.787 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 23.881 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 8.09 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.64 0.055 0.81 0.012 4.45 0.068
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 931.79 0.088 2,072.03 0.196 3,003.82 0.285
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 529.52 0.618 241.34 0.282 770.86 0.899
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 7,650.40 6.418 6,338.20 5.317 13,988.60 11.735
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - 5,321.56 0.136 5,321.56 0.136
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - 401.56 1.115 401.56 1.115
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - 49.44 0.006 49.44 0.006
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - 135.00 0.268 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,020.37 3.531 653.19 0.764 3,673.56 4.295
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - 1,922.70 1.417 1,922.70 1.417
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,459.44 0.827 420.29 0.238 1,879.73 1.065
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,022.38 0.215 352.81 0.074 1,375.19 0.289
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 34,157.01 0.125 9,740.62 0.036 43,897.63 0.160
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 88.00 0.027 24.00 0.007 112.00 0.034
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 14.01 9.868 23.881

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
1.48071610498
0.21153087214
14.94090475258
0.84612348856
15.78702824114

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###
0.81

2,072.03 2,072.03
241.34 - -

### -

### - -
### -

6,338.20
- -
5,321.56
-

-
68.27
49.44

###
### 21.60 22.95 20.25 24.30
### - - - - 100.45 101.00 -201.45

### 320.06

### - -
###
### 346.09 365.31 307.63 269.18 346.09 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
420.29 1,879.73

352.81 1,375.19
43,897.63
112.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XVIII ( DELAPAN BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 20 Nov S/D 26 Nov 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 14.941 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 23.881 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 8.940 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 4.19 0.064 0.26 0.004 4.45 0.068
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 2,703.82 0.256 300.00 0.028 3,003.82 0.285
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 770.86 0.899 - - 770.86 0.899
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 - - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 - - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 13,988.60 11.735 - - 13,988.60 11.735
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - 5,321.56 0.136 5,321.56 0.136
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - 401.56 1.115 401.56 1.115
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - 49.44 0.006 49.44 0.006
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 - - 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,470.11 4.057 203.45 0.238 3,673.56 4.295
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 1,922.70 1.417 - - 1,922.70 1.417
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,777.73 1.007 102.00 0.058 1,879.73 1.065
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,306.19 0.274 69.00 0.014 1,375.19 0.289
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 41,397.63 0.151 2,400.00 0.009 43,797.63 0.160
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 102.00 0.031 10.00 0.003 112.00 0.034
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 20.91 1.611 23.881

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

300.00 300.00
- - -

### -

### - -
### -

-
- -
5,321.56
-

-
68.27
49.44

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 203.45

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,879.73

1,375.19
43,797.63
112.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XVII ( TUJUH BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 13 Nov S/D 19 Nov 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 13.838 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 22.270 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 8.432 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.93 0.060 0.26 0.004 4.19 0.064
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 2,340.69 0.222 363.13 0.034 2,703.82 0.256
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 670.86 0.783 100.00 0.117 770.86 0.899
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 12,631.05 10.596 1,357.55 1.139 13,988.60 11.735
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 - - 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,351.58 3.918 118.53 0.139 3,470.11 4.057
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 1,524.23 1.124 398.47 0.294 1,922.70 1.417
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,669.44 0.946 108.29 0.061 1,777.73 1.007
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,206.19 0.253 100.00 0.021 1,306.19 0.274
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 39,657.01 0.145 1,740.62 0.006 41,397.63 0.151
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 102.00 0.031 - - 102.00 0.031
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 20.455 1.815 22.270

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 363.13
100.00 - -

### -

### - -
### -

1,357.55
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 58.08

### - -
###
### 71.72 75.71 63.76 55.79 71.72 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,777.73

1,306.19
41,397.63
102.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XVI ( ENAM BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 6 Nov S/D 12 Nov 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 12.736 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 20.455 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 7.720 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.67 0.056 0.26 0.004 3.93 0.060
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 1,731.79 0.164 608.90 0.058 2,340.69 0.222
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 629.52 0.734 41.34 0.048 670.86 0.783
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 10,310.40 8.649 2,320.65 1.947 12,631.05 10.596
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 135.00 0.268 - - 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,207.71 3.750 143.87 0.168 3,351.58 3.918
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 957.23 0.706 567.00 0.418 1,524.23 1.124
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,571.44 0.891 98.00 0.056 1,669.44 0.946
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,111.38 0.233 94.81 0.020 1,206.19 0.253
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 37,157.01 0.136 2,500.00 0.009 39,657.01 0.145
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 102.00 0.031 - - 102.00 0.031
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 17.73 2.727 20.455

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 608.90
41.34 - -

### -

### - -
### -

2,320.65
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 70.50

### - -
###
### 102.06 107.73 90.72 79.38 102.06 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,669.44

1,206.19
39,657.01
102.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XV ( LIMA BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 30 Okt S/D 5 Nov 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 11.633 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 17.728 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 6.095 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.64 0.055 0.03 0.000 3.67 0.056
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 931.79 0.088 800.00 0.076 1,731.79 0.164
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 529.52 0.618 100.00 0.117 629.52 0.734
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 7,650.40 6.418 2,660.00 2.231 10,310.40 8.649
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 70.00 0.139 65.00 0.129 135.00 0.268
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 3,020.37 3.531 187.34 0.219 3,207.71 3.750
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 457.23 0.337 500.00 0.369 957.23 0.706
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,459.44 0.827 112.00 0.063 1,571.44 0.891
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 1,022.38 0.215 89.00 0.019 1,111.38 0.233
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 34,157.01 0.125 3,000.00 0.011 37,157.01 0.136
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 88.00 0.027 14.00 0.004 102.00 0.031
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 14.49 3.238 17.728

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 800.00
100.00 - -

### -

### - -
### -

2,660.00
- -
-
-

-
-
-

###
### 10.40 11.05 9.75 11.70
### - - - - 100.45 101.00 -201.45

### 91.80

### - -
###
### 90.00 95.00 80.00 70.00 90.00 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,571.44

1,111.38
37,157.01
102.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : III ( STIGA )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 Okt S/D 31 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 10.845 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 14.489 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 3.64 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.81 0.15 0.190 0.035 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.00 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.02 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.03 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 2.60 0.04 1.04 0.016 3.64 0.055
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 486.69 0.05 445.10 0.042 931.79 0.088
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 330.37 0.39 199.15 0.232 529.52 0.618
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.02 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.34 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - 7,650.40 6.418 7,650.40 6.418
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - 70.00 0.139 70.00 0.139
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 1,426.67 1.668 1,593.70 1.863 3,020.37 3.531
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - 457.23 0.337 457.23 0.337
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,045.15 0.59 414.29 0.235 1,459.44 0.827
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 717.57 0.15 304.81 0.064 1,022.38 0.215
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 23,916.39 0.09 10,240.62 0.037 34,157.01 0.125
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 64.00 0.02 24.00 0.007 88.00 0.027
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 5.06 9.426 14.49

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
1.102674908768
0.157524986967
10.53020511751
0.315049973934
10.84525509144

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

### 0.1900
###

###
0.26

931.79 445.10
445.10 - -
199.15

### -

### - -
### -

7,650.40
- -
-
-

-
-
-

###
### 11.20 11.90 10.50 12.60
### - - - - 100.45 101.00 -201.45

### 1,593.70

### - -
###
### 82.30 86.87 73.16 64.01 82.30 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
414.29 1,459.44

304.81 1,022.38
10,240.62 34,157.01
88.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XIV ( EMPAT BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 23 Okt S/D 29 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 10.530 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 14.489 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 3.959 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 1.00 0.183 - - 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.38 0.051 0.26 0.004 3.64 0.055
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 686.69 0.065 245.10 0.023 931.79 0.088
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 440.20 0.514 89.32 0.104 529.52 0.618
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 6,100.00 5.117 1,550.40 1.301 7,650.40 6.418
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - 70.00 0.139 70.00 0.139
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 2,816.92 3.293 203.45 0.238 3,020.37 3.531
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - 457.23 0.337 457.23 0.337
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,359.44 0.770 100.00 0.057 1,459.44 0.827
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 922.38 0.194 100.00 0.021 1,022.38 0.215
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 31,657.01 0.116 2,500.00 0.009 34,157.01 0.125
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 78.00 0.024 10.00 0.003 88.00 0.027
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 12.25 2.236 14.49

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 245.10
89.32 - -

### -

### - -
### -

1,550.40
- -
-
-

-
-
-

###
### 11.20 11.90 10.50 12.60
### - - - - 100.45 101.00 -201.45

### 99.69

### - -
###
### 82.30 86.87 73.16 64.01 82.30 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,459.44

1,022.38
34,157.01
88.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XIII ( TIGA BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 16 Okt S/D 22 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 9.063 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 12.254 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 3.190 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.99 0.181 0.010 0.002 1.000 0.183
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 3.12 0.048 0.26 0.004 3.38 0.051
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 686.69 0.065 - - 686.69 0.065
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 440.20 0.514 - - 440.20 0.514
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 4,737.00 3.974 1,363.00 1.143 6,100.00 5.117
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 2,339.79 2.735 477.13 0.558 2,816.92 3.293
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,254.15 0.711 105.29 0.060 1,359.44 0.770
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 922.38 0.194 - - 922.38 0.194
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 28,916.39 0.106 2,740.62 0.010 31,657.01 0.116
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 78.00 0.024 - - 78.00 0.024
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 10.48 1.777 12.25

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
### 0.28

###

- -
- - -

### -

### - -
### -

1,363.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 233.79

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,359.44

922.38
31,657.01
78.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XII ( DUA BELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 9 Okt S/D 15 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 7.597 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 9.114 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 1.517 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.90 0.164 0.090 0.016 0.990 0.181
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 2.86 0.044 0.26 0.004 3.12 0.048
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 486.69 0.046 200.00 0.019 686.69 0.065
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 380.20 0.444 60.00 0.070 440.20 0.514
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 - - - 268.00 -
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 - - - 3,366.00 -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN -
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 2,750.00 2.307 1,987.00 1.667 4,737.00 3.974
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 1,933.12 2.260 406.67 0.475 2,339.79 2.735
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,154.15 0.654 100.00 0.057 1,254.15 0.711
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 817.57 0.172 104.81 0.022 922.38 0.194
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 25,916.39 0.095 3,000.00 0.011 28,916.39 0.106
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 78.00 0.024 - - 78.00 0.024
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 6.77 2.341 9.114

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 200.00
60.00 - -

### -

### - -
### -

1,987.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 199.27

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,254.15

922.38
28,916.39
78.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : XI ( SEBELAS )
No. Paket Kontrak : PAKET 13 TANGGAL : 2 Okt S/D 8 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 6.258 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 6.773 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.515 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.81 0.148 0.090 0.016 0.900 0.164
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 2.60 0.040 0.26 0.004 2.86 0.044
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 486.69 0.046 - - 486.69 0.046
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 330.37 0.385 49.83 0.058 380.20 0.444
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 - - - 268.00 -
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 - - - 3,366.00 -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 1,100.00 0.923 1,650.00 1.384 2,750.00 2.307
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 1,426.67 1.668 506.45 0.592 1,933.12 2.260
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 1,045.15 0.592 109.00 0.062 1,154.15 0.654
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 717.57 0.151 100.00 0.021 817.57 0.172
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 23,916.39 0.087 2,000.00 0.007 25,916.39 0.095
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 64.00 0.020 14.00 0.004 78.00 0.024
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 4.62 2.149 6.773

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
49.83 - -

### -

### - -
### -

1,650.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 248.16

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,154.15

817.57
25,916.39
78.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : II ( DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 1 Sept S/D 30 Sept 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 4.793 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 5.986 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 1.19 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.45 0.082 0.360 0.066 0.810 0.148
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 1.30 0.020 1.30 0.020 2.60 0.040
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 93.59 0.009 393.10 0.037 486.69 0.046
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 90.37 0.105 240.00 0.280 330.37 0.385
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 - - 268.00 0.024 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 - - 3,366.00 1.339 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - 1,100.00 0.923 1,100.00 0.923
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 5.60 0.015 52.92 0.143 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 738.49 0.036 6,579.06 0.321 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 175.57 0.205 1,251.10 1.463 1,426.67 1.668
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 522.86 0.296 522.29 0.296 1,045.15 0.592
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 354.76 0.074 362.81 0.076 717.57 0.151
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 12,175.77 0.044 11,740.62 0.043 23,916.39 0.087
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 30.00 0.009 34.00 0.010 64.00 0.020
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 0.95 5.040 5.986

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
0.877
0.125285714286
4.041556268765
0.751714285714
4.793270554479

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

### 0.3600
### 0.36

###
1.30

393.10 393.10
240.00 - -
240

### -

### - -
### -

1,100.00
- -
-
-

-
-
-

###
### - - - -
### 1,052.65 1,118.44 986.86 1,184.23 100.45 101.00 2,035.43

### 1,251.10

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
522.29 1,045.15

362.81 717.57
11,740.62 23,916.39
34.00 64.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : X ( SEPULUH )
No. Paket Kontrak : PAKET 13 TANGGAL : 25 Sept S/D 1 Okt 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 4.919 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 5.986 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 1.068 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.72 0.131 0.090 0.016 0.810 0.148
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 2.34 0.036 0.26 0.004 2.60 0.040
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 393.59 0.037 93.10 0.009 486.69 0.046
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 290.37 0.339 40.00 0.047 330.37 0.385
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 3,366.00 1.339 - - 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 500.00 0.419 600.00 0.503 1,100.00 0.923
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 58.52 0.158 - - 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 7,317.55 0.357 - - 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 1,081.67 1.265 345.00 0.403 1,426.67 1.668
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 941.15 0.533 104.00 0.059 1,045.15 0.592
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 638.57 0.134 79.00 0.017 717.57 0.151
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 21,916.39 0.080 2,000.00 0.007 23,916.39 0.087
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 54.00 0.016 10.00 0.003 64.00 0.020
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 4.92 1.068 5.986

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 93.10
40.00 - -

### -

### - -
### -

600.00
- -
-
-

-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 169.05

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
1,045.15

717.57
23,916.39
64.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : IX ( SEMBILAN )
No. Paket Kontrak : PAKET 13 TANGGAL : 18 Sept S/D 24 Sept 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 4.042 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 4.918 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.877 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.72 0.131 - - 0.720 0.131
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 2.04 0.031 0.30 0.005 2.34 0.036
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 393.59 0.037 - - 393.59 0.037
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 290.37 0.339 - - 290.37 0.339
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 2,742.68 1.091 623.32 0.248 3,366.00 1.339
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - 500.00 0.419 500.00 0.419
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 44.90 0.121 13.62 0.037 58.52 0.158
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 5,909.53 0.288 1,408.02 0.069 7,317.55 0.357
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 898.39 1.050 183.28 0.214 1,081.67 1.265
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 941.15 0.533 - - 941.15 0.533
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 638.57 0.134 - - 638.57 0.134
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 18,575.77 0.068 3,340.62 0.012 21,916.39 0.080
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 54.00 0.016 - - 54.00 0.016
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 3.91 1.004 4.918

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
### 0.27

###

- -
- - -

### -

### - -
### -

500.00
- -
-
-

-
-
-

###
### - - - -
### 225.28 239.36 211.20 253.44 100.45 101.00 277.28

### 89.81

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
941.15

638.57
21,916.39
54.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : VIII ( DELAPAN )
No. Paket Kontrak : PAKET 13 TANGGAL : 11 Sept S/D 17 Sept 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 3.165 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 3.914 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.750 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.63 0.115 0.090 0.016 0.720 0.131
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 1.80 0.027 0.24 0.004 2.04 0.031
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 393.59 0.037 - - 393.59 0.037
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 290.37 0.339 - - 290.37 0.339
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 1,962.45 0.780 780.23 0.310 2,742.68 1.091
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN -
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 30.40 0.082 14.50 0.039 44.90 0.121
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 4,001.64 0.195 1,907.89 0.093 5,909.53 0.288
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 685.39 0.801 213.00 0.249 898.39 1.050
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 798.86 0.453 142.29 0.081 941.15 0.533
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 544.76 0.114 93.81 0.020 638.57 0.134
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 16,575.77 0.060 2,000.00 0.007 18,575.77 0.068
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 54.00 0.016 - - 54.00 0.016
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 3.10 0.819 3.914

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

-
- -
-
-

-
-
-

###
### - - - -
### 305.26 324.34 286.18 343.42 100.45 101.00 447.23

### 104.37

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
941.15

638.57
18,575.77
54.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : VII ( TUJUH )
No. Paket Kontrak : PAKET 13 TANGGAL : 4 Sept S/D 10 Sept 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 2.288 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 3.095 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.808 %

KUANTITAS BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.54 0.099 0.090 0.016 0.630 0.115
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 1.56 0.024 0.24 0.004 1.80 0.027
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 393.59 0.037 - - 393.59 0.037
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 150.93 0.176 139.44 0.163 290.37 0.339
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 960.00 0.382 1,002.45 0.399 1,962.45 0.780
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 17.90 0.048 12.50 0.034 30.40 0.082
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 2,356.91 0.115 1,644.73 0.080 4,001.64 0.195
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 375.69 0.439 309.70 0.362 685.39 0.801
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 622.86 0.353 176.00 0.100 798.86 0.453
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 444.76 0.093 100.00 0.021 544.76 0.114
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 14,175.77 0.052 2,400.00 0.009 16,575.77 0.060
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 40.00 0.012 14.00 0.004 54.00 0.016
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 1.90 1.191 3.095

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII
19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
139.44 - -

-
### -
### - -
### -

-
- -
-
-

-
-
-

###
### - - - -
### 263.16 279.60 246.71 296.05 100.45 101.00 357.76
### 151.75

### - -
###
### - - - - - 0.00
- - - -
- - - -
- - - - 0.00
-
56.00 54.00
34.00
798.86

544.76
16,575.77
54.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : VI ( ENAM )
No. Paket Kontrak : PAKET 13 TANGGAL : 28 Agust S/D 3 Sept 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 1.657 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 1.904 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.247 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.45 0.082 0.090 0.016 0.540 0.099
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 1.30 0.020 0.26 0.004 1.56 0.024
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 6,403.55 46,635.23 298,631,027.07 0.61 93.59 0.009 300.00 0.028 393.59 0.037
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 4,521.24 574,288.90 2,596,497,946.24 5.27 90.37 0.105 60.56 0.071 150.93 0.176
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 268.00 44,940.82 12,044,139.76 0.02 268.00 0.024 - - 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 3,366.00 195,668.43 658,619,935.38 1.34 - - 960.00 0.382 960.00 0.382
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 - 124,648.30 - - - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 4,549.63 136,309.96 620,159,883.31 1.26 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 - 1,934.45 - - - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 8,166.00 278,989.93 2,278,231,768.38 4.63 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 30,992.82 412,991.75 12,799,778,969.24 26.00 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 71,487.00 12,536.08 896,166,750.96 1.82 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
1,407.60 11,710.80 16,484,122.08 0.03
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 4,861.20 1,531,428.76 7,444,581,488.11 15.12 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,871.02 1,367,519.43 9,396,253,353.92 19.09 - - - - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 1,556.04 55,000.00 85,582,200.00 0.17 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 58.52 1,327,173.54 77,666,195.56 0.16 5.60 0.015 12.30 0.033 17.90 0.048
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 926.40 978,343.59 906,337,501.78 1.84 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 7,317.55 24,019.05 175,760,599.33 0.36 738.49 0.036 1,618.42 0.079 2,356.91 0.115
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 4,668.45 575,531.35 2,686,839,330.91 5.46 175.57 0.205 200.12 0.234 375.69 0.439
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 - 150,000.00 - -
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 - 481,429.98 - - - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 5,039.85 362,910.05 1,829,012,215.49 3.72 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 839.98 3,009,448.63 2,527,876,660.23 5.13 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 13,323.33 15,001.76 199,873,399.06 0.41 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 1,784.79 254,012.70 453,359,326.83 0.92 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 122.00 341,316.08 41,640,561.76 0.08 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 510.00 172,906.92 88,182,529.20 0.18 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.41 522.86 0.296 100.00 0.057 622.86 0.353
3,208.00 2,166.58 6,950,388.64 0.01
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 2,975.00 103,302.25 307,324,193.75 0.62 354.76 0.074 90.00 0.019 444.76 0.093
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 113,005.00 1,796.22 202,981,841.10 0.41 12,175.77 0.044 2,000.00 0.007 14,175.77 0.052
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 287.00 150,176.27 43,100,589.49 0.09 30.00 0.009 10.00 0.003 40.00 0.012
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,229,810,326.15 100.00 0.97 0.933 1.904

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 300.00
60.56 - -

### -

### - -
### -

-
- -
-
-

-
-
-

###
### - - - -
### 258.95 275.13 242.76 291.32 100.45 101.00 348.81

### 98.06

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
622.86

444.76
14,175.77
40.00

### #REF! #REF! #REF! #REF!


LAPORAN BULANAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I BULAN KE : I ( SATU )
No. Paket Kontrak : PAKET 13 TANGGAL : 24 Juli S/D 31 Agust 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 1.347 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.972 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : -0.38 %

S/D BULAN LALU BULAN INI S/D BULAN INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 - - 0.450 0.082 0.450 0.08
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 - - 10.00 0.004 10.00 0.00
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 - - 30.00 0.015 30.00 0.02
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 - - 80.00 0.030 80.00 0.03
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 - - 1.30 0.020 1.30 0.02
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 - - 93.59 0.009 93.59 0.01
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 - - 90.37 0.105 90.37 0.11
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 - - 268.00 0.024 268.00 0.02
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - 5.60 0.015 5.60 0.02
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - 738.49 0.036 738.49 0.04
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 - - 175.57 0.205 175.57 0.21
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 - - 522.86 0.297 522.86 0.30
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 - - 354.76 0.075 354.76 0.07
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 - - 12,175.77 0.044 12,175.77 0.04
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 - - 30.00 0.009 30.00 0.01
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 - 0.972 0.972

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Bunga Raya Lestari

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST INDRA PRAJA, ST


NIP. 19651231 200502 1 001 Site Engineer General Superitendent
0.72284454658
0.103263506654
0.934018863029
0.413054026617
1.347072889645

VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

### 0.0900
###

###
0.26

- 93.59
90.37 - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### 118.16 125.54 110.77 132.93 100.45 101.00 49.64

### 86.03

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
522.86
354.76
12,175.77
30.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : V ( LIMA )
No. Paket Kontrak : PAKET 13 TANGGAL : 21 Agust S/D 27 Agust 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 0.934 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.972 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.038 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.36 0.066 0.090 0.016 0.450 0.082
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 1.04 0.016 0.26 0.004 1.30 0.020
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 93.59 0.009 - - 93.59 0.009
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 67.76 0.079 22.61 0.026 90.37 0.105
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 120.00 0.011 148.00 0.014 268.00 0.024
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - 5.60 0.015 5.60 0.015
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - 738.49 0.036 738.49 0.036
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 113.89 0.133 61.68 0.072 175.57 0.205
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 391.34 0.222 131.52 0.075 522.86 0.297
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 316.25 0.067 38.51 0.008 354.76 0.075
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 12,175.77 0.044 - - 12,175.77 0.044
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 30.00 0.009 - - 30.00 0.009
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 0.71 0.266 0.97

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
22.61 - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### 118.16 125.54 110.77 132.93 100.45 101.00 49.64

### 30.22

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
522.86
354.76
12,175.77
30.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : IV ( EMPAT )
No. Paket Kontrak : PAKET 13 TANGGAL : 14 Agust S/D 20 Agust 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 0.629 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.705 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.076 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.27 0.049 0.090 0.016 0.360 0.066
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 0.78 0.012 0.26 0.004 1.04 0.016
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 93.59 0.009 - - 93.59 0.009
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 30.00 0.035 37.76 0.044 67.76 0.079
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 - - 120.00 0.011 120.00 0.011
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - - - - -
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - - - - -
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 50.00 0.058 63.89 0.075 113.89 0.133
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 202.34 0.115 189.00 0.107 391.34 0.222
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 166.25 0.035 150.00 0.032 316.25 0.067
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 6,345.00 0.023 5,830.77 0.021 12,175.77 0.044
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 20.00 0.006 10.00 0.003 30.00 0.009
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 0.39 0.313 0.705

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
37.76 - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 31.31

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
391.34
316.25
12,175.77
30.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : III ( TIGA )
No. Paket Kontrak : PAKET 13 TANGGAL : 7 Agust S/D 13 Agust 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 0.324 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.392 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : 0.07 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.18 0.033 0.090 0.016 0.270 0.049
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.004 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 0.52 0.008 0.26 0.004 0.78 0.012
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 93.59 0.009 - - 93.59 0.009
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 - - 30.00 0.035 30.00 0.035
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 - - - - - -
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - - - - -
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - - - - -
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 - - 50.00 0.058 50.00 0.058
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 100.00 0.057 102.34 0.058 202.34 0.115
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 75.00 0.016 91.25 0.019 166.25 0.035
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 3,000.00 0.011 3,345.00 0.012 6,345.00 0.023
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 10.00 0.003 10.00 0.003 20.00 0.006
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 0.19 0.206 0.392

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
30.00 - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### 24.50

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
202.34
166.25
6,345.00
20.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : II ( DUA )
No. Paket Kontrak : PAKET 13 TANGGAL : 31 Juli S/D 6 Agust 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 0.216 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.186 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : -0.030 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 0.09 0.016 0.090 0.016 0.180 0.033
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 10.00 0.004 - - 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 30.00 0.015 - - 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 80.00 0.030 - - 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 0.26 0.004 0.26 0.004 0.52 0.008
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 - - 93.59 0.009 93.59 0.009
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 - - - - - -
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 - - - - - -
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - - - - -
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - - - - -
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 - - - - - -
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 - - 100.00 0.057 100.00 0.057
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 - - 75.00 0.016 75.00 0.016
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 - - 3,000.00 0.011 3,000.00 0.011
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 - - 10.00 0.003 10.00 0.003
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 0.07 0.116 0.186

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- 93.59
- - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
100.00
75.00
3,000.00
10.00

### #REF! #REF! #REF! #REF!


LAPORAN MINGGUAN
Nama Paket : PENGADAAN KONSTRUKSI JALAN (PROGRAM PERCEPATAN) PAKET 13 : LAB. KENANGA - KAWINDA TO'I MINGGU KE : I ( SATU )
No. Paket Kontrak : PAKET 13 TANGGAL : 24 Juli S/D 30 Juli 2017
Proyek / Bagpro : PPK PEMBANGUANAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU RENCANA SCHEDULE : 0.108 %
Kontraktor : PT. LANCAR SEJATI REALISASI KOMULATIF : 0.070 %
Konsultan : PT. SURYA MARZQ KONSULTINDO, KSO. PT. GARIS PUTIH SEJAJAR DEVIASI : -0.04 %

S/D MINGGU LALU MINGGU INI S/D MINGGU INI


KUANTITAS BOBOT
NO. KUANTITAS BOBOT
URAIAN SATUAN HARGA SATUAN JUMLAH HARGA ADDENDUM HARGA SATUAN JUMLAH HARGA ADDENDUM KET
PEMBAYARAN KONTRAK KONTRAK (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
01 (%)

Divisi 1. UMUM
1.2 Mobilisasi LS 1.00 89,880,248.00 89,880,248.00 0.18 1.00 89,880,248.00 89,880,248.00 0.18 - - 0.090 0.016 0.090 0.016
1.8(1a) Rangka Rambu Multi Pesan Buah 10.00 200,000.00 2,000,000.00 0.00 10.00 200,000.00 2,000,000.00 0.00 - - 10.00 0.004 10.00 0.004
1.8(3) Rambu Multi Pesan Buah 30.00 250,000.00 7,500,000.00 0.02 30.00 250,000.00 7,500,000.00 0.02 - - 30.00 0.015 30.00 0.015
1.8(4) Traffic Cone Buah 80.00 185,000.00 14,800,000.00 0.03 80.00 185,000.00 14,800,000.00 0.03 - - 80.00 0.030 80.00 0.030
1.8(9) Kendaraan untuk Pemeliharaan Jalan Bulan 16.33 7,500,000.00 122,475,000.00 0.25 16.33 7,500,000.00 122,475,000.00 0.25 - - 0.26 0.004 0.26 0.004
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 36,673.56 46,635.23 1,710,279,905.52 3.48 36,673.56 46,635.23 1,710,279,905.52 3.48 - - - - - -
2.2(1) Pasangan Batu dengan Mortar M3 5,310.66 574,288.90 3,049,853,089.67 6.20 5,310.66 574,288.90 3,049,853,089.67 6.20 - - - - - -
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 1,600.00 44,940.82 71,905,312.00 0.15 1,600.00 44,940.82 71,905,312.00 0.15 - - - - - -
3.1.(1b) Galian Batu Lunak M3 400.00 195,668.43 78,267,372.00 0.16 400.00 195,668.43 78,267,372.00 0.16 - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 250.00 124,648.30 31,162,075.00 0.06 250.00 124,648.30 31,162,075.00 0.06 - - - - - -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 1,377.00 136,309.96 187,698,814.92 0.38 1,377.00 136,309.96 187,698,814.92 0.38 - - - - - -
3.3 Penyiapan Badan Jalan M2 121,485.00 1,934.45 235,006,658.25 0.48 121,485.00 1,934.45 235,006,658.25 0.48 - - - - - -
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 5,607.00 278,989.93 1,564,296,537.51 3.18 5,607.00 278,989.93 1,564,296,537.51 3.18 - - - - - -
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A M3 33,268.20 412,991.75 13,739,492,137.35 27.92 33,268.20 412,991.75 13,739,492,137.35 27.92 - - - - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair Liter 84,105.00 12,536.08 1,054,347,008.40 2.14 84,105.00 12,536.08 1,054,347,008.40 2.14 - - - - - -
6.1 (2)a Lapis Perekat - Aspal Cair Liter 12,615.75 13,510.46 170,444,585.75 0.35 12,615.75 13,510.46 170,444,585.75 0.35 - - - - - -
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) Ton 5,625.34 1,531,428.76 8,614,807,460.78 17.51 5,625.34 1,531,428.76 8,614,807,460.78 17.51 - - - - - -
6.3(3)b Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) Ton 6,562.98 1,367,519.43 8,975,002,668.70 18.24 6,562.98 1,367,519.43 8,975,002,668.70 18.24 - - - - - -
6.3(4)a Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) Ton - - -
6.3(4)b Aditif anti pengelupasan Kg 2,700.78 55,000.00 148,542,900.00 0.30 2,700.78 55,000.00 148,542,900.00 0.30 - - - - - -
DIVISI 7. STRUKTUR
7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert M3 14.40 1,327,173.54 19,111,298.98 0.04 14.40 1,327,173.54 19,111,298.98 0.04 - - - - - -
7.1 (8) Beton mutu rendah fc'=15 Mpa untuk (K175) M3 918.24 978,343.59 898,354,218.08 1.83 918.24 978,343.59 898,354,218.08 1.83 - - - - - -
7.3 (1) Baja tulangan BJ24 polos Kg 1,935.81 24,019.05 46,496,317.18 0.09 1,935.81 24,019.05 46,496,317.18 0.09 - - - - - -
7.9 (1) Pasangan Batu M3 198.50 575,531.35 114,242,972.98 0.23 198.50 575,531.35 114,242,972.98 0.23 - - - - - -
7.15(1) Pembongkaran Pasangan Batu M3 187.42 150,000.00 28,113,000.00 0.06 187.42 150,000.00 28,113,000.00 0.06
7.15(2) Pembongkaran Beton M3 19.47 481,429.98 9,373,441.71 0.02 19.47 481,429.98 9,373,441.71 0.02 - - - - - -
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor M3 467.28 362,910.05 169,580,608.16 0.34 467.28 362,910.05 169,580,608.16 0.34 - - - - - -
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M3 81.77 3,009,448.63 246,082,614.48 0.50 81.77 3,009,448.63 246,082,614.48 0.50 - - - - - -
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 29,205.00 15,001.76 438,126,400.80 0.89 29,205.00 15,001.76 438,126,400.80 0.89 - - - - - -
8.4.(1) Marka Jalan Termoplastik M2 840.83 254,012.70 213,581,498.54 0.43 840.83 254,012.70 213,581,498.54 0.43 - - - - - -
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade Buah 38.00 341,316.08 12,970,011.04 0.03 38.00 341,316.08 12,970,011.04 0.03 - - - - - -
8.4.(5) Patok Pengarah Buah 107.28 172,906.92 18,549,454.38 0.04 107.28 172,906.92 18,549,454.38 0.04 - - - - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan M2 7,788.00 278,989.93 2,172,773,574.84 4.42 7,788.00 278,989.93 2,172,773,574.84 4.42 - - - - - -
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras M' 12,980.00 103,302.25 1,340,863,205.00 2.73 12,980.00 103,302.25 1,340,863,205.00 2.73 - - - - - -
10.1(3)b Pemotongan Rumput/semak pada Rumija M2 272,000.00 1,796.22 488,571,840.00 0.99 272,000.00 1,796.22 488,571,840.00 0.99 - - - - - -
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert M' 20,768.00 150,176.27 3,118,860,775.36 6.34 20,768.00 150,176.27 3,118,860,775.36 6.34 - - - - - -
- - - -
TOTAL (%) 49,203,413,005.37 100.00 49,203,413,005.37 100.01 - 0.070 0.070

Disetujui Oleh, Diperiksa Oleh : Dibuat Oleh,


PPK Pembangunan dan Pengawasan Jalan dan Jembatan KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
Wilayah Bima - Dompu PT. Surya Marzq Konsultindo , Kso. PT. Garis Putih Sejajar PT. Lancar Sejati
Pengawas Utama

BEJO SISWANTO SLAMET HARIANTO, ST INDRA PRAJA, ST


NIP. 19681215 200801 1 013 Chief Inspector/Quality Engineer General Superitendent
VII VIII IX X XI XII XIII

19des#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

###
###

###

- -
- - -

### -

### - -
### -

-
- -
-
-
-
-
-
-

###
### - - - -
### - - - - 100.45 101.00 -201.45

### -

### - -
###
### - - - - - 0.00

- - - -
- - - -
- - - - 0.00

-
56.00 54.00
34.00
-
-
-
-

### #REF! #REF! #REF! #REF!


JADWAL UMUM PELAKSANAA
TERHADAP KONTRAK TAHUN JAMAK

PPK : Pembangunan dan Pengawasan Jalan dan Jembatan Wilayah Bima - Dompu

No Paket Kontrak : Paket 13

Nama Paket : Pengadaan Konstruksi Jalan (Percepatan) Lab. Kenanga - Kawinda

No Kontrak : 620/34/JM1/KTR/2017, Tanggal 24 Juli 2017

Kontraktor : PT. LANCAR SEJATI

Prop/Kab/Kodya : Nusa Tenggara Barat

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

VOLUME JUMLAH HARGASATUAN (Rp) BOBOT % 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 1-Jan 8-Jan
No. Uraian Pekerjaan SAT HARGA SATUAN s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan 14-Jan

KONTRAK ADD-01 KONTRAK ADD-01 KONTRAK ADD-01 7Hr 14Hr 21Hr 28Hr 35Hr 42Hr 49Hr 56Hr 63Hr 70Hr 77Hr 84Hr 91Hr 98Hr 105Hr 112Hr 119Hr 126Hr 133Hr 140Hr 147Hr 154Hr 161Hr 168Hr 175Hr

DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 1.00 89,880,248.00 89,880,248.00 89,880,248.00 0.18 0.18 0.046 0.046 0.046

1.8.(1a) Rangka Rambu Untuk Multi Pesan Ls 10.00 10.00 200,000.00 2,000,000.00 2,000,000.00 0.00 0.00 0.001 0.001 0.001

1.8.(3) Rambu Multi Pesan Buah 30.00 30.00 250,000.00 7,500,000.00 7,500,000.00 0.02 0.02 0.005 0.005 0.005

1.8.(4) Traffic Cone Buah 80.00 80.00 185,000.00 14,800,000.00 14,800,000.00 0.03 0.03 0.010 0.010 0.010

1.8.(9) Kendaraan Untuk Pemeliharaan Jalan Buah 16.33 16.33 7,500,000.00 122,475,000.00 122,475,000.00 0.25 0.25 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air m3 36,673.56 6,403.55 46,635.23 1,710,279,905.52 298,631,027.07 3.47 0.61 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021

2.1.(1) Pasangan Batu Dengan Mortar m3 5,310.66 4,521.24 574,288.90 3,049,853,089.67 2,596,497,946.24 6.20 5.27 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa m3 1,600.00 268.00 44,940.82 71,905,312.00 12,044,139.76 0.15 0.02 0.006 0.006 0.006 0.006

3.1.(1b) Galian Batu Lunak m3 400.00 3,366.00 195,668.43 78,267,372.00 658,619,935.38 0.16 1.34 0.334 0.334 0.334 0.334

3.2.(1a) Timbunan Biasa dari Sumber Galian m3 250.00 - 124,648.30 31,162,075.00 - 0.06 - 0.000 0.000 0.000 0.000

3.2.(2a) Timbunan Pilihan dari Sumber Galian m3 1,377.00 4,549.63 136,309.96 187,698,814.92 620,159,883.31 0.38 1.26 0.210 0.210 0.210 0.210

3.3.(1) Penyiapan Badan Jalan m2 121,485.00 - 1,934.45 235,006,658.25 - 0.48 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(2b) Lapis Pondasi Agregat Kelas S m3 5,607.00 8,166.00 278,989.93 1,564,296,537.51 2,278,231,768.38 3.18 4.63

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A m3 33,268.20 30,992.82 412,991.75 13,739,492,137.35 12,799,778,969.24 27.91 26.00 0.929 0.929 0.929 0.929 0.929 0.929 0.929

DIVISI 6. PERKERASAN ASPAL


6.1.(1)(a) Lapis Resap Pengikat- Aspal Cair Liter 84,105.00 71,487.00 12,536.08 1,054,347,008.40 896,166,750.96 2.14 1.82

6.1.(2)(a) Lapis Perekat-Aspal Cair Liter 12,615.75 12,615.75 13,510.46 170,444,585.75 170,444,585.75 0.35 0.35
6.1.(2)(a) Lapis Perekat-Aspal Cair Liter 1,407.60 11,710.80 16,484,122.08 0.03
6.3.(3a) Lataston Lapis Aus (HRS-WC) (grasasi senjang/semi senjang) Ton 5,625.34 4,861.20 1,531,428.76 8,614,807,460.78 7,444,581,488.11 17.50 15.12

6.3.(4a) Lataston Lapis Pondasi (HRS-BASE) (gradasi senjang/semi senjang) Ton 6,562.98 6,871.02 1,367,519.43 8,975,002,668.70 9,396,253,353.92 18.23 19.09
6.3.(8) Bahan Anti Pengelupasan Kg 2,700.78 1,556.04 55,000.00 148,542,900.00 85,582,200.00 0.30 0.17

DIVISI 7. STRUKTUR
7.1.(5)b Beton Mutu Sedang dengan fc'=30 Mpa(K-350) untuk Slab dan Box culvert m3 14.40 58.52 1,327,173.54 19,111,298.98 77,666,195.56 0.04 0.16 0.039 0.039

7.1.(8) Beton Mutu Rendah dengan fc'=15 Mpa(K-175) m3 918.24 926.40 978,343.59 898,354,218.08 906,337,501.78 1.82 1.84

7.3.(1) Baja Tulangan U 24 Polos Kg 1,935.81 7,317.55 24,019.05 46,496,317.18 175,760,599.33 0.09 0.36 0.089 0.089

7.9.(1) Pasangan Batu m3 198.50 4,668.45 575,531.35 114,242,972.98 2,686,839,330.91 0.23 5.46 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188

7.15.(1) Pembongkaran Pasangan Batu m3 187.42 - 150,000.00 28,113,000.00 - 0.06 - 0.000

7.15.(2) Pembongkaran Beton m3 19.47 - 481,429.98 9,373,441.71 - 0.02 - 0.000 REALISASI

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.1.(1) Lapis Pondasi Agregat Kelas A untuk Pekerjaan Minor m3 467.28 5,039.85 362,910.05 169,580,608.16 1,829,012,215.49 0.34 3.72 0.059 0.059 0.059 0.198 0.198 0.225 0.149 0.395 0.395 0.395 0.395 0.395 0.395 0.395

8.1.(5) Campuran Aspal Panas untuk Pekerjaan Minor m3 81.77 839.98 3,009,448.63 246,082,614.48 2,527,876,660.23 0.50 5.13 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428

8.1.(9) Residu Bitumen Liter 29,205.00 13,323.33 15,001.76 438,126,400.80 199,873,399.06 0.89 0.41 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034

8.4.(1) Marka Jalan Termoplastik m2 840.83 1,784.79 254,012.70 213,581,498.54 453,359,326.83 0.43 0.92

8.4.(3a) Rambu Jalan Tunggal dgn Permukaan Pemantul Engineer Grade Buah 38.00 122.00 341,316.08 12,970,011.04 41,640,561.76 0.03 0.08
8.4.(5)b Patok Pengarah Buah 260.00 510.00 172,906.92 44,955,799.20 88,182,529.20 0.09 0.18
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

10.1.(2).1 Pembersihan / perataan / pemadatan bahu jalan m2 7,788.00 7,788.00 278,989.93 2,172,773,574.84 2,172,773,574.84 4.41 4.41 0.000 0.000 0.000 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069

3,208.00 2,166.58 6,950,388.64 0.01 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

10.1.(3)a Pembersihan dan pembuangan lumpur pada selokan samping diperkeras m' 12,980.00 2,975.00 103,302.25 1,340,863,205.00 307,324,193.75 2.72 0.62 0.000 0.000 0.000 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010

10.1(3)b Pemotongan rumput / semak pada rumija m2 272,000.00 113,005.00 1,796.22 488,571,840.00 202,981,841.10 0.99 0.41 0.000 0.000 0.000 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

10.1(3)c Pembersihan saluran diperkeras, gorong-gorong / slab culvert m' 20,768.00 287.00 150,176.27 3,118,860,775.36 43,100,589.49 6.34 0.09 0.000 0.000 0.000 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

Jumlah Rp. 49,229,819,350.19 Rp. 49,229,810,326.15 100.00 100.00


Rencana Progress Mingguan Akumulatif (%) - - 0.108 0.108 0.108 0.305 0.305 0.723 0.630 0.630 0.630 0.630 0.746 0.746 0.721 0.721 0.526 0.526 0.526 0.526 1.343 1.343 1.343 1.343 1.569 1.569 1.569
ORIGINAL
Rencana Progress Mingguan Kumulatif (%) - - - 0.108 0.216 0.324 0.629 0.934 1.657 2.287 2.917 3.547 4.177 4.923 5.669 6.390 7.111 7.637 8.163 8.689 9.215 10.558 11.901 13.244 14.587 16.156 17.725 19.294
Rencana Progress Mingguan Akumulatif (%) 0.108 0.108 0.108 0.305 0.305 0.723 0.630 0.877 0.877 0.877 1.339 1.339 1.467 1.467 1.103 1.103 1.103 1.103 1.481 1.481 1.481 1.481 1.410 1.410 1.410
ADD - 01
Rencana Progress Mingguan Kumulatif (%) 0.108 0.216 0.325 0.629 0.934 1.657 2.288 3.165 4.042 4.919 6.258 7.597 9.063 10.530 11.633 12.736 13.838 14.941 16.422 17.902 19.383 20.864 22.274 23.684 25.094

Realisasi 0.070 0.116 0.206 0.313 0.266 0.933 1.191 0.819 1.004 1.068 2.149 2.341 1.777 2.236 3.238 2.727 1.815 1.611 2.659 2.475 2.091 0.594 0.308
REALISASI
Realisasi Komulatif (%) 0.070 0.186 0.392 0.706 0.972 1.905 3.096 3.915 4.919 5.988 8.137 10.478 12.255 14.491 17.729 20.456 22.271 23.882 26.541 29.017 31.108 31.702 32.010

DEVIASI DEVIASI (0.038) (0.030) 0.068 0.076 0.038 0.248 0.809 0.751 0.878 1.069 1.879 2.881 3.191 3.960 6.096 7.721 8.433 8.941 10.120 11.114 11.725 10.838 9.736

Disetujui Oleh : Diperiksa Oleh :


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI
PEMBANGUNAN DAN PENGAWASAN JALAN DAN JEMBATAN WILAYAH BIMA - DOMPU PT. SURYA MARZQ KONSULTINDO KSO PT. GARIS PUTIH SEJAJAR

H. ZAINUL IRPAN, ST YUYUN MULIADIN, ST


NIP. 19651231 200502 1 001 Site Engineer
PELAKSANAAN ( TIME SCHEDULE )
AK TAHUN JAMAK

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov

Ket
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov

182Hr 189Hr 196Hr 203Hr 210Hr 217Hr 224Hr 231Hr 238Hr 245Hr 252Hr 259Hr 266Hr 273Hr 280Hr 287Hr 294Hr 301Hr 308Hr 315Hr 322Hr 329Hr 336Hr 343Hr 350Hr 357Hr 364Hr 371Hr 378Hr 385Hr 392Hr 399Hr 406Hr 413Hr 420Hr 427Hr 434Hr 441Hr 448Hr 455Hr 462Hr 469Hr 476Hr 483Hr 490Hr
M
a
s
0.046 a
P
e
m
el
ih
ar
a
a
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 n
3
6

100%
5
0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 H
ar
i
0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 K
al
e
n
d
er

0.000 0.000 - -

0.210 0.210 - -

0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231 0.231

75%
0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929 0.929

0.364 0.364 0.364 0.364 0.364

L 0.069 0.069 0.069 0.069 0.069


I
B 0.007 0.007 0.007 0.007 0.007
U
RENCANA R 3.024 3.024 3.024 3.024 3.024
ADD - 01
I 3.817 3.817 3.817 3.817 3.817
D
U
L 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017

F
I
0.039 0.039 T
R
I 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097

0.089 0.089

50%
0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188

RENCANA
KONTRAK

0.307 0.307 0.307

0.042 0.042

0.090 0.090

0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069

25%
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.643 1.643 1.260 1.260 1.386 1.386 - - 4.592 4.592 4.592 4.592 4.592 4.086 4.086 4.086 4.086 4.086 0.485 0.485 0.485 0.485 0.485 0.485 0.485 0.485 0.500 0.403 0.371 0.049

20.863 22.432 24.001 25.570 27.139 28.708 30.277 31.846 33.415 34.984 36.553 38.122 39.691 41.260 42.829 44.472 46.115 47.375 48.635 50.021 51.407 51.407 51.407 55.999 60.591 65.183 69.775 74.367 78.453 82.539 86.625 90.711 94.797 95.282 95.767 96.252 96.737 97.222 97.707 98.192 98.677 99.177 99.580 99.951 100.000
1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.410 1.620 1.620 1.148 1.148 1.250 1.250 - - 4.617 4.617 4.617 4.617 4.617 3.536 3.536 3.536 3.536 3.536 0.419 0.419 0.419 0.419 0.419 0.419 0.419 0.419 0.626 0.529 0.397 0.049

26.504 27.914 29.324 30.734 32.143 33.553 34.963 36.373 37.783 39.193 40.603 42.013 43.423 44.833 46.243 47.863 49.483 50.631 51.778 53.029 54.279 54.279 54.279 58.897 63.514 68.131 72.749 77.366 80.903 84.439 87.976 91.512 95.048 95.467 95.886 96.305 96.723 97.142 97.561 97.979 98.398 99.024 99.553 99.951 100.000

= Dompu, 17 Januari 2017

Dibuat Oleh :
Kontraktor
PT. LANCAR SEJATI

CHANDRA DINATA
Direktur
JADWAL WAKTU PELAKSANAAN (TIME SCHEDULLE)
BOQ. GABUNGAN (I,II,III)
PPK : Pembangunan dan Pengawasan Jalan dan Jembatan Wilayah Bima - Dompu
Nama Paket : Pengadaan Konstruksi Jalan ( Program Percepatan ) Paket 13: Lab. Kenanga - Kawinda To'i
Prop/ Kab / Kodya : Nusa Tenggara Barat ( NTB )
JANGK
HARGA Bobot BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN
No Uraian Pekerjaan Volume Satuan JUMLAH HARGA
SATUAN % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS 89,880,248.00 89,880,248.00 0.183 0.064 0.064
1.8(1a) Rangka Rambu Multi Pesan 10.00 Buah 200,000.00 2,000,000.00 0.004 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.8(3) Rambu Multi Pesan 30.00 Buah 250,000.00 7,500,000.00 0.015 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.8(4) Traffic Cone 80.00 Buah 185,000.00 14,800,000.00 0.030 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
1.8(9) Kendaraan untuk Pemeliharaan Jalan 16.33 Bulan 7,500,000.00 122,475,000.00 0.249 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air 36,673.56 M3 46,635.23 1,710,279,905.52 3.476 1.159 1.159 1.159
2.2(1) Pasangan Batu dengan Mortar 5,310.66 M3 574,288.90 3,049,853,089.67 6.198 1.550 1.550 1.550 1.550
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa 1,600.00 M3 44,940.82 71,905,312.00 0.146 0.073 0.073
3.1.(1b) Galian Batu Lunak 400.00 M3 195,668.43 78,267,372.00 0.159 0.159
3.1.2 Galian Batu - M3 - - -
3.1.3 Galian Struktur dengan kedalaman 0 - 2 meter - M3 - - -
3.1.7 Galian Perkerasan Beraspal tanpa Cold Milling Machine - M3 - - -
3.1.8 Galian Perkerasan Berbutir - M3 - - -
3.2.(1a) Timbunan Biasa dari sumber galian 250.00 M3 124,648.30 31,162,075.00 0.063
3.2.(2a) Timbunan Pilihan dari sumber galian 1,377.00 M3 136,309.96 187,698,814.92 0.381
3.3 Penyiapan Badan Jalan 121,485.00 M2 1,934.45 235,006,658.25 0.478 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN -
4.2.(2a) Lapis Pondasi Agregat Kelas B - M3 - - -
4.2.(2b) Lapis Pondasi Agregat Kelas S 5,607.00 M3 278,989.93 1,564,296,537.51 3.179
DIVISI 5. PERKERASAN BERBUTIR
5.1.1 Lapis Pondasi Agregat Kelas A 33,268.20 M3 412,991.75 13,739,492,137.35 27.924 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931 0.931
5.1.2 Lapis Pondasi Agregat Kelas B - M3 - - -
DIVISI 6. PERKERASAN ASPAL
6.1 (1)a Lapis Resap Pengikat - Aspal Cair 84,105.00 Liter 12,536.08 1,054,347,008.40 2.143
6.1 (2)a Lapis Perekat - Aspal Cair 12,615.75 Liter 13,510.46 170,444,585.75 0.346
6.3(3)a Lataston Lapis Aus (HRS-WC), (gradasi senjang / semi senjang) 5,625.34 Ton 1,531,428.76 8,614,807,460.78 17.509
6.3(3)b Lataston Lapis Aus Perata (HRS-WC) (L), (gradasi senjang / semi senjang) - Ton - - -
6.3(4)a Lataston Lapis Pondasi (HRS Base) (gradasi senjang/semi senjang) 6,562.98 Ton 1,367,519.43 8,975,002,668.70 18.241
6.3(4)b Lataston Lapis Perata (HRS Base L) (gradasi senjang/semi senjang) - Ton - - -
6.3.(8) Aditif anti pengelupasan 2,700.78 Kg 55,000.00 148,542,900.00 0.302
- - - - - - -
DIVISI 7. STRUKTUR

7.1 (5)a Beton mutu sedang dengan fc’=30 MPa untuk slab dan Box culvert 14.40 M3 1,327,173.54 19,111,298.98 0.039 0.039
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) 918.24 M3 978,343.59 898,354,218.08 1.826 0.913 0.913
7.3 (1) Baja Tulangan BJ 24 Polos 1,935.81 Kg 24,019.05 46,496,317.18 0.094 0.094
7.9 (1) Pasangan Batu 198.50 M3 575,531.35 114,242,972.98 0.232 0.116 0.116
7.15(1) Pembongkaran Pasangan Batu 187.42 M3 150,000.00 28,113,000.00 0.057 0.029 0.029
7.15(2) Pembongkaran Beton 19.47 M3 481,429.98 9,373,441.71 0.019 0.019
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.1(1) Lapis Pondasi Agregat Kelas A untk Pekerjaan Minor 467.28 M3 362,910.05 169,580,608.16 0.345
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor 81.77 M3 3,009,448.63 246,082,614.48 0.500
8.1(9) Residu Bitumen untuk Pekerjaan Minor 29,205.00 Liter 15,001.76 438,126,400.80 0.890
8.4.(1) Marka Jalan Termoplastik 840.83 M2 254,012.70 213,581,498.54 0.434
8.4.(3a) Rambu Jalan Tunggal dgn Perm.Pemantul Engineer Grade 38.00 Buah 341,316.08 12,970,011.04 0.026
8.4.(5) Patok Pengarah 107.28 Buah 172,906.92 18,549,454.38 0.038
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

10.1(2).1 Pembersihan / peralatan / pemadatan bahu jalan 7,788.00 M2 278,989.93 2,172,773,574.84 4.416 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074
10.1(3)a Pembersihan dan Pembuangan Lumpur pada Selokan Samping diperkeras 12,980.00 M' 103,302.25 1,340,863,205.00 2.725 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045
10.1(3)b Pemotongan Rumput/semak pada Rumija 272,000.00 M2 1,796.22 488,571,840.00 0.993 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
10.1(3)c Pembersihan Saluran Diperkeras, gorong-gorong / slab culvert 20,768.00 M' 150,176.27 3,118,860,775.36 6.339 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106
Jumlah Nilai Pekerjaan 49,203,413,005.37 100.00
Kemajuan Pekerjaan Mingguan (%) 0.108 0.108 0.108 0.305 0.305 0.723 0.630 0.630 0.630 0.630 0.746 0.746 0.721 0.721 0.526 0.526 0.526 0.526 1.343 1.343 1.343 1.343 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569
Kemajuan Pekerjaan Kumulatif (%) 0.108 0.216 0.324 0.629 0.934 1.657 2.287 2.917 3.547 4.177 4.923 5.669 6.390 7.111 7.637 8.163 8.689 9.215 10.558 11.901 13.244 14.587 16.156 17.725 19.294 20.863 22.432 24.001 25.570 27.139

KETERANAGAN
> JANGKA WAKTU PELAKSANAAN 490 ( EMPAT RATUS SEMBILAN PULUH ) HARI KALENDER
DWAL WAKTU PELAKSANAAN (TIME SCHEDULLE)
BOQ. GABUNGAN (I,II,III)

JANGKA WAKTU PELAKSANAAN 490 HARI KALENDER


BULAN VIII BULAN IX BULAN X BULAN XI BULAN XII BULAN XIII BULAN XIV BULAN XV BULAN XVI
Ket
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

0.027 0.027 PEMELIHARAAN


0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.159
- -

-
-
0.021 0.021 0.021

0.016 0.016 0.016 0.016 0.016

0.795 0.795 0.795 0.795

0.931 0.931 0.931 0.931 0.931

0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834 0.834

0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869 0.869

0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012

0.172 0.172
0.500
0.890
0.434
0.026
0.345

0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074 0.074
0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106

1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.569 1.643 1.643 1.260 1.260 1.386 1.386 - - 4.592 4.592 4.592 4.592 4.592 4.086 4.086 4.086 4.086 4.086 0.485 0.485 0.485 0.485 0.485 0.485
28.708 30.277 31.846 33.415 34.984 36.553 38.122 39.691 41.260 42.829 44.472 46.115 47.375 48.635 50.021 51.407 51.407 51.407 55.999 60.591 65.183 69.775 74.367 78.453 82.539 86.625 90.711 94.797 95.282 95.767 96.252 96.737 97.222 97.707

Mataram, 12 Juni 2017


PT. LANCAR SEJATI

CHANDRA WINATA
Direktur