1 2 3 4 5 6 7

100

03 04 05 06 07 08 09 10 11 12 13
MILLIMETERS
10
0

E5
01 02

E4
E

G
Stair

E6

TranslatorRoom
D A
H E C B
A12 A13 A14 A15
A3 A4 A5 A6 A7 A8 A9 A10 A11 A16
A1 A2 E18 A18
D
E1 A17 I
E2 E3 E7 E8 E10
Foyer
E17 E19 O
E9 E11 E12 E13 E14 E16
E15
M L
J P
Q

Stair

H.C Toilet Key Plan:

A JUNE 2023 SCHEMATIC PACKAGE


Rev. Date Revision Description
Project:

Dhahran EXPO-Convention Center

Client:

B
DESIGN LOADS LEGEND (UNIFORM LOADS) DESIGN LOADS LEGEND (LINE LOADS) Main Consultant:

Legend / Usage SIDL (KN/M2) LL (KN/M2) Partitions (KN/M2)


Electric/L.C/IT/Gas/Generator/Telecom/Control/Garbage Room
3.00
2.00 floor finish+1.00 service
7.50 Load Symbol Load Type Load (KN/M')
Food Service/Restaurant/Showrooms/Shopping Areas & Serving 3.00 5.00 SUB. Consultant:
2.00 floor finish+1.00 service Curtain Wall with muilions. 1.70
Corridors/Bank/Mine Market
3.00 5.00 300mm Hollow Concrete Blocks* (H=5150mm) Including Plastering. 30.00
Stairs 2.00 floor finish+1.00 service

3.00 3.00 1.00 200mm Hollow Concrete Blocks* (H=5150mm) Including Plastering.
Toilets/Lockers/Kitchen 2.00 floor finish+1.00 service 21.60

200mm Solid Concrete Blocks** (H=5150mm) Including Plastering+Ceramic***. 26.50


Drawing Title:

*Density of Hollow Concrete Block shall not exceed 16.50 KN/m3


**Density of Solid Concrete Block shall not exceed 21.00 KN/m3
MEZZANINE FLOOR LOADING PLAN
***Density of Ceramic shall not exceed 23.50 KN/m3
MEZZANINE FLOOR LOADING PLAN
1 1 : 200 Designed Drawn Checked Approved Rev.
OA AO WG EA
Size Scale Plot Date
A
A0 As JUNE 2023
indicated

Drawing Number
A 20029-MIM-DWG-DE-012-00- A