You are on page 1of 4
0 PBR Product Name SIR A Steel Pipe Plate HEBER ET Je ETS RG IT BI AEE AB 3B China Railway Indonesia Jakarta ke BBW Bandung High Speed Rail Project Manager Consignor Division 1 EMS BS Test Category Consign Sent Test BRIN TH ROT FH ty Xuzhou Inspection Testing Center ELAR ISR Be AF ih J ET FP National Quality Inspection and Testing Center for Space Frame and Steel Structures (3) SN sea Hd Bly Xuzhou Inspection Testing Genter FR AR Be SS a 7 a BB Ly National Quality Inspection and Testing Genter for Space Frame and Stee! Structures 2023 JWT00262 PBB Product Name ii We fe Wk Test Report jt 2 HB 1 FiPage No. 2-1 BRAS © 450X25 Q355B Specification FR Product Grade PHM Steel Pipe Plate 5 REY EE D7 mG FRA — SG China Railway Indonesia Jakarta ke Bandung High Speed Rail Project Manager Division 1 28 arc |_Nane consisner | 5, Address RAGE a Telephone Sample Condition RBA REA Rae 3 Test Category Consign Sent Test | Sample Quantity SAM 01-1 RAMA 01: Sample Date eas olny Test Date Bogor PERRA FMW ERThe samples are satisfied with testing requirements RS HE RE Test Criteria IGB/T 1591-2018 {ike dem SRAELAHIEN) High strength low alloy structural steels) GB/T 13793-2016 (HSEEI#NE) (Steol pipes with la longitudinal clectric (resistance) weld) (@i€AiRER) (Principal technical requirenents) REAM Test Conclusion AR Related message OE Note PRA, AOA AGB/T 13793-2016 EA (BIEN RER) WE RUBE. The s have been inspected and thomitaws inspected meet Wi/T 13793-2016 and al requirements a lroject Nane:Jakarta-Bandung Wigh-Speed Railvay” Padalarang Station 1, ALARM RAE. The test is responsible for the received sample only. 2. HAM AME RABE AR, HAs hBEH KI. |The information in the thick wireframe is provided by the client, lwhose authenticity is the responsibility of the client. wos, SFE ts, Be aap HO nell, Apa hee Ww R Test Result 2023WIWT00262 3£ 2 HOM 2 Wh Page No. 2-2 #3 | iemmwin | ae want tramacan | San NO. Test Item Unit Requirements Test Result Result at 568 Pass ainsait at M ‘Tensile Strength MPa aan, a Pass at 3%, Pass eh 3 Pass iat ai 2 | Percentage Elongation | — 218 2 n After Fracture% ass att 44. ‘Pass iE LT ERET NOTE 1, REPRO AE MAN RAR IH. ‘The report is invalid without "special geal for inspection and testing" or the official seal of inspection and testing 2, AHISAMA Ne OETA MONE DART. ‘The copy report Is invalid without re-stamping of "special seal for Inspection and testing’ or the official seal of inspection and testing unt, 3, REEER, TH, HARPER, ‘Test report invalid without signature of main inspector, assessor and approver. 4, HERRAR. Test reports invalid with any alte. 5, KERR AMMO MMMM NOES AM, AIRGAS RRM HR ON TAM Ee HM, RARE MARA TSR. The inspection and testing organization is only responsible for the entrusted inspection samples received. The conclusion of this test report is based on the testing criteria and only forthe tested items. 6, RANGA NUR TIGHT EE Ae This test report shall not be used for advertising. 7. NSA AeA SAA ( BL A) OR ER RHE ine MI NAO REN The remaining samples must be collected within three months after receiving the test report(f the limit time is shor, it shall be subject tothe period of vali). ‘The overdue samples willbe dealt with, in accordance with the provisions of the inspection and testing Institution, 8, OTSA, MATIN there is any objection to the inspection results, see the following conditions. 2) AARNE, FREE A 15 ASRS AAT AA; For entrusted testing, written re-inspection application shall be submitted to the inspection and testing institution within 15 days after receiving the report. bo) ARR ME ee AFUE (ORAM) ZARA , AIRS IMO CRSA For products quality inspection supervision testing, writen re-inspection application shall be submitted within 15 days after receiving the test result notice to Market Supervision and Administration Departments that organize the implementation of supervision and inspection. c) RERANCH CAINE ROS) = ATL Cte mM A RETA TM EH, For food safety sampling inspection testing, writen re-inspection application shall be submitted within 7 days after receiving the test result notice to Market Supervision and Administration Departments that ‘organize the implementation of supervision and inspection. MMARMFULARD UTR (MORE OER. Imo objection is raised within the time limi, i shall be deemed to accept the results ofthe inspection and testing report. Shak: LAREN AR 12 ‘Address: No. 12 of Shangju Road, Yunlong District, Xuzhou, Jiangsu Province ‘MSBBHF - 0516-67022581 Supervisory Telephone:0516-67022581 AUS5®iE : 0516-67022501 67022502 Business Telepnone:0516-67022501 67022502 SPUN - 0516-67022505 Demurral Disposal Telephone:0516-67022505 #0: 0516-67022545, Fax : 0516-67022545, sia: 221018 Zip code : 221018 ‘B-FABAG : xuzhouzhiian@163.com E-mall-xuzhouzhijan@ 163.com

You might also like