You are on page 1of 2

Rajeev Pathak

Contact Details +91- 7378377393


Permanent Address-
K-189, World Bank Colony
Barra, Kanpur-208027

Achievement & Assignments @ Plant Operation &Engineering Excellence -


Professional Summary
 Presently Serving Mrs. Bector Foods-Cremica as Head of Engineering & Projects ‒ Breads Category ,from Feb-2021 ,as PAN India level /
Corporate level for all Bakery Manufacturing Sites ‒ O & M Coordination , Active Key Lead , Specific Energy Usage ‒ Standard vs Actuals ,
Renewal Energy , Open Power Access Implementation @ Site , AOP designing , CAPEX ‒ OPEX Budgets & Centrally coordination .
 Served Pepsico India as Free -Lancer @ Pune Site - Project Head -Jan-2020-Feb-2021
 Good Understanding & Expertise on Plant Management , ,Plant Operation & Maintenance , Engineering Projects Mech , Electrical, Instruments ,
Design , Erection , Project Management , Process & Manufacturing ,Operation Management .
 Excellent Exposures on Project Life Cycle Engineering ‒ Master Planning, Feasibility Study, FEED , EPC & Lead MEP , Process Lead & Plant
Operation Management .
 PAN India level / Corporate level for all Chocolate Manufacturing Sites ‒ O & M , Projects Coordination , Active Key Lead , Specific Energy Usage ‒
Standard vs Actuals- MCC , Co-packers MCC Control , Renewal Energy , Open Power Access Implementation @ Site , AOP designing , CAPEX ‒
OPEX Budgets & Centrally coordination of each site .
 Expertise on Plant Operations, Maintenance, De-bottlenecking, Up-gradation, Brown & Green Field Projects, Opex - Capex., Step ahead on Plant
Safety & Statutory Compliance with Best Quality .
 Improve the Plant Operation Statistics KPIʼs OEE, MTBF, Specific Energy Cost, Inventory Management, Manufacturing Cost etc. & close control
with Team work sprit & continuous improvement.

Key Accountabilities & Achievements @ Glance


Employer Job Title Dates of Location Details / Key Accountabilities Key Achievements
Employment
Flex Industries Ltd Electrical 5/1/1994 - 2/1/1997 India Green Field Project -33 KV HT / LT / Complete Electrical
Engineer Distribution Network -5 X 1250 KTA 50 Distribution System - HT / LT -
G3 Gensets - Erection , Installation , Installation & Smooth
Testing & Smooth Operation . Operation
Ushafone- Koshika Asst. Engineer 2/1/1997 - 3/1/1998 India MSC & BTS Towers Installation with all Understanding the Basic
India Ltd Utilities in complete North India Zone Mobile Network HardwareM
successfully & Reliable Operation Software methodology along
.Complete exposure & smooth operation of with Key Hardware's - Utilities
process from the designing concept till Installation & Working
final operation delivery stage with vertical experience .
Ramp up
Nestle India Ltd.- Sr. 3/1/1998 - 9/1/2006 India Complete Engineering Projects from Real Applied Engineering &
Samalkha & Moga Officer Concept to Final Successful stages , VEA Great Place of Learning &
Sites Engineeri , Hygienic Engineering & Energy Execution of all Brown / Green
ng Engineering Inbuilt design , Budgeting & Field Field Projects , Privileged
Approval , Vendor Developments , on Site Mega Project Expansion
HACCP , & HAZOP Analysis , Risk ISIS Project Key Site
Analysis & Mitigation Planning , Internal- Coordinator , Complete Process
External Audit Management , Statutory & , Utilities , Automation
Compliance Adherence ,Stake Holder Networking , Integration
Management ,100 % Accident Free Site , SCADA experience made real
LOTO -100 % Implemented Site , Site Engineer , CAPEX / OPEX
Coordinator & Active Member of Central Budgeting/Tracking ,
Projects Team . Reporting etc. excellent
Detailed Understanding of Process ‒ Mass experience .
Flow sheet , PID , Process Machineries , Complete Process designing
Ordering , Tech Spec , OEE Calculations Equipmentʼs ratings ,
& Lean Manufacturing Efficiency Class basis Selection
on the basis of benchmarking
Globally .
ITC (Indian tobacco Asst Mgr 9/1/2006 - 9/1/2007 India Complete Site Sustainability Projects , Excellent Learning &
Division)-Munger - Plant Maintenance Excellence & Efficient Implementation on Renewal
Site Engineeri Energy Operation , Renewal Energy Energy by designing &
ng Maximization , Rain Water Harvesting Erection site sustainability
Projects etc. successful Installation & projects , RWH
Optimum Engineering Budgets - Proposal Conceptualization , Engineering
approvals . Budgets- CAPEX / OPEX ,
Process Line designing , Equipmentʼs proposals , approvals , RUPS
selection , Line capacity analysis & des First Time Implementation @
bottlenecking . Unit & successful erection -
operation given great technical
satisfaction . A smarter way to
operate step ahead on Statutory
norms really given a vast
understanding.
GSK CH India Ltd Dy. Mgr - 9/1/2007 - India Excellent Exposure & Experience on Real Effective & Efficient
Engineering 7/1/2008 Energy Management Application & Maintenance Methodology ,
Implementation , "Energy Manager" CAPEX - Back Pressure
Accreditation from BEE & Govt of India Turbine , Mist Cooling Twr etc
Complete Site Efficient Predicative & smooth implementation ,
Condition Based Maintenance Energy Engineering basic &
Methodology , TPM & Lean Six Sigma Detailed understanding &
Conceptualization , Engineering Projects implementation , Benchmarking with
Implementation , Global Energy Team Global Standards .
Active Member for 100 % Green Site
approach .
Mondelez India Manager 7/1/2008 - India All Green Field - Brown Field @ India - All sites Brown Field - new
Foods Ltd - 4/1/2017 Robust Basic Designing & Detailed Green Field Projects core team
Projects Engineering Design Great experience with active member , Complete all
International Teams like TCE , LNTEES , process line - utilities , 66 KV
Jacob etc. , CAPEX Building & Approval networking, Innovative Power
from Core Team , Detailed Execution & solution of Sandwich Bus-ducts
Resources Planning , Risk Analysis & implementation @ Site
Mitigation Methodology , VEA , HACCP , ,Detailed Projects designing with
HAZOP , Safety & Energy Efficient TCE , LNTEES , Jacobs, M+W
Methodology & System Inbuilt designing , etc. really given hard core
Contingency Plan readiness , Stake Holder detailing way on the same , 2 X 15
Management ,Visible & Active Leadership & KL LPG Plant , Sricity Green
Role Model demonstration to achieved Field Project Team MEP team site
Targets as a Team work approach member , vendor coordination
.Complete Process starting from Mass , time & cost scheduling /
Flow Sheet to PFD, PID , Schematic ‒ tracking etc , 132 KV Networking
selection , equipment efficiency & best in etc great moments .
class criterion . All Process Manufacturing
machineries standardization &
benchmarking .

Olam International Chief Engineer 4/1/2017 – Nigeria AFP Green Field Project Complete Feed Green Field Project on AFP with
11/12/2018 Mill , Hatchery & Farms Projects all wide installation
Execution , Successful Operation , throughout area execution ,
Inventory Management , Training & testing & smooth operation ,
Capability building of Self & Team , Energy Efficient Planning &
International Vendor Management , Site methodology , Benchmarking with
Coordination , Operation Excellence , Global standards , Man power
TPM & Maintenance , Energy Optimum Management , Technical capability
Utilization etc. building , CAPEX / OPEX
Complete Process Designing along with management , Site Safety
Utilities equipmentʼs , vendor Management , 11 KV
development , partnership of global best Integration with 33 KV Line
OEMʼs specially on Process machineries & conceptualization great
ensure better than best performance at experiences & learning .
shop floor .

54 Capital Group Project Head 11/02/2019 –Sep- Addis All Manufacturing Sites Engineering Excellence Successful Implementation & WIP
2019 Ababa- modelling , mapping , standardization, Brown ,Self driven System in controlled
Ethiopia
Field Projects to increase productivity , EHS & Q monitoring with much better &
, Global Best engineering practices improved productivity .Successful
implementation . New Green Field Projects – 100 Project Kicked off & others are in good
TPD Ediable Oil Refinery , 200 TPD SEP , 1000 progress . Complete Sypply Chain
TPD CPO Refinery Projects ownership. Functions handling successfully with
Excellent Team Work Sprit .

Pepsico India Free-Lancer – Site Jan-2020 – Jan- Pune Complete RBS Line dismantling , New PC-32 Complete Mapping of Utilities with
Project Lead 2021 Line erection ,testing ,commissioning along with additional Process Line , New Utilities
all Utilities Upgradation , WRS , LPG Bullet additions with Complete Safety &
systems re-installation / new installation & Hygenic Engineering Implementation
smooth integration with Existing set up . & complete training of site team .
Complete Follow up & strict
Implementation of Penademic &
successful commissionning of Plant in
defined Time Frame in close
coordination with all Local &
Internationsl OEM’s .
Mrs Bector Foods – Head of Engineering Feb-2021 India Complete addition of new lines of Bread & Buns Sites Stabilization international – local
Cremica & Projects – Breads Onwards , Baked –Frozen manufacturing facilities , OEM’s , Process machineries , Utilities
& Bakery Products
categories Erection , Installation , Testing , Commissioning equipments , CAPEX – OPEX
, Utilities , Engineering re-strengthen & Optimization , Maintenance Budgeting
Implementation of Best Engineering Practices ,Improved KPI’s close Tracking &
implementation with much improved efficiencies smooth implementation in continuous
at PAN India for complete Bakery-Cakery progress as Team Work with Improved
Businesses existing & Planning for coming sites.. Profitiability & Effieciencies .Green
Fields Projects Management .

Professional Certification Courses Summary –

Certification Course Certifying Agency Certifying Year


ProjectManagement Kraft Foods Europe HQ 2012
ProjectRisk Management IIMAhmedabad 2011
EnergyManager Ministryof Power -Govt. of India & BEE 2008
LeadAuditor Course Certification -ISO-14001 DNVKolkata 2007
Various Technical Courses / Certifications -Automation , LT / HT Switchgears / Business Acumen etc. Rockwell/ Siemens / CII GBC etc 1994-2005

Owning aVital role on Business Project Management Active Member in Strategic Planning & Leadership thru Performance Management and Development Team & supporting the Glocal Supply Chain
Team. Complete Ownership for Business investment in Process Equipmentʼs,Utilities System,Infrastructure set up, Facility delivery with Best Utilization of Capex & Opex.
Looking forward for more strengthen Goals & Assignments for further development of self & my organization with Team Work approach.

Rajeev Pathak DOB ‒ 01/01/1972


+91- 7378377393 / 9987589805 rajeevpathak1@yahoo.com ; rajeevpathak2@gmail.com https://www.linkedin.com/in/rajeev-pathak-bb906b14/

You might also like