You are on page 1of 1

1 1

No.1 Full height partition shall be made up of glass up to 2.7 mts. height and solid gypsum partition up to the soffit of the slab. Glass partition made up of 12mm clear toughened glass partition with
300-RHCNF
2 frosted stickers with branding. Glass panel shall be supported with top and bottom steel frame with necessary steel posts, cladded with black powder coated aluminum all as mood image & approved
3

by the engineer. Solid gypsum board partition shall be finished as fair face concrete paint system.

FN
3
-00

CH
HR

R-0
4

0
FN

3
5

No.2 Glass partitions up to 2.7 mts. Hight. Glass partition shall be made up of 12mm clear toughened glass partition with frosted stickers with branding. Glass shall panel be supported with top and
6

7 2

300
CN
-RH

-RH
CN
300
bottom steel frame with necessary steel posts, cladded with black powder coated aluminum all as mood image & approved by the engineer.
FH

F
8
FNCHR-003
9

10

11

12
3 No.3 100 mm thick full height drywall gypsum partition shall be finished special effect paint with Fenomastic paint system.
5.700
13

14 F

ADMIN.
15
4 No.4 Full height glass & gypsum partition finished with wood cladding, special effect paint & Fenomastic paint. All shall be as per the mood image for conference room. All partitions shall be as
NF

FN

NF

FN
CH

CH
HC

HC
R-

R-
0-R

0-R
16
00

00
30

30
3

3
9

9
00

00
B-

B-
OPEN per required acoustical values.
TA

TA
FN

FN
FN

FN
3

3
00

00
CH

CH
SPACE
R-

R-
R-

R-
CH

CH
00

00
FN

FN
3

3
60 M Sq. No.5 Proposed concrete block wall shall be fair face finished with approved sealer paint system for mechanical & electrical rms. For toiles shall be same from outside and inside as per mood image.
FNLOU-002
5
Ex. Porcelain tiles, wood & etc.
FN
CH
TV No false ceiling in peripheral offices required : All fair face concrete shall be painted with approved sealer coat paint system. All exposed A/C ducts shall be circular type painted all as approved by the

7.750
NF
HC

R -00
0 -R

3
30

9
00
B-
TA
FN

FNLOU-002
Engineer.
FN
03

CH
0
R-

R-
CH

00
FN

KEY PLAN
Proposed Glass door (With frosted sticker as per approved by Engineer)
F

FN
N
HC

CH
0-R

R-00
30

(2000 x 2700mm)
3 9
00
B-
TA
FN
FN

3
00
CH

R-
R

CH
-00

FN
3

Proposed Glass door with Floor Spring (With frosted sticker as per approved by Engineer)
2.998 1.748
(1000 x 2700mm)
2 MEZANINE LAYOUT Proposed Steel door (1000 x 2200mm)

1.700
STAIRCASE
1.5

1.4

1.4

1.4

1.4

1.4
TV

2.7

2.7
FNLOU-002

ANUP 0.9 0.9 0.9

FNLOU-0
04
4.5

4.5

4.5

4.5

4.5
MOI MEDICAL MEDICAL
3.988

CONSULTANT CONSULTANT NISREEN 0.8 1.8 STAGE


SER.
RM. AMIN

0.9

0.9
2.5

2.5

2.5

2.5

2.5
F & SS DR. DARIJE DR. SABEENA SAFETY HEAD

1.8
DIRECTOR DR. PETER DR. OLAF DR. YASIR PROF. NEBO SECURITY
6.762

0.9

0.9
4.772 2.5 DR. MARINE DR. CHERYL 2.8 2.8 2.8 2.8 2.8
2.8

04
U-0
LO
FNLOU-004

FN
START 10 LAPS=1 KM

5.7 5.7 5.7

10 m

20 m

30 m

40 m
3.0 5.7
Reception

ROOM

LET'S PLAY
CONFERENCE

AREA
MEZZANINE
1.5

1.5
AREA
ADMIN
0.3 25X25 MM STEEL FRAME WITH 0.3
0.376 0.3 LET'S PLAY
MAIN 3.835
BLACK POWDER COATING
4.105 1.913 5.211 2.0 2.5 6.2 3.3 AREA
2.5 0.6 5.9
ENTRANCE UP
0.600

1.745
1 1.5 EAST
1.5
3.905
2 DISABLE EXPANSION
0.600

2.1
2.0
1.861
LOGO 3
TOILET FELLOW FELLOW ENTRANCE
2.548

4
2.810
CONFERENCE
0.600

5
5.3 x 9.0 IVAN NASIM
3.575
PANTRY

3.8
6 FNCHR-
0.600

FNCHR-0
03 003
SWING
7
SOCIAL MALE TOILET 2.201
12 M. Sq.
1.0

4.742
6.100 0.3

FN
03

CH
SPORTS

R-0

R-0
1.381
8

CH

03
0.600

FN
NATIONAL 9 SPECIALIST
MEDICINE DR's
3.538

m
TEAM OFFICE ADMIN. 13.5 M.Sq.

50
10
SPORTS MEDICINE
0.600

07 0.6
20 M. Sq. 11

FNCHR-003
OPEN 3.1

3.2
3
0.600

-00 R
CH

SPACE
FN

SPENT-001
90 M Sq. STORE 3.4 4.3
0.600

VISIT

3.0
DR.S 2.334

2.789

5.5

Table Square Small


9 M. Sq. 0.6
0.600

3.400
3.234
10.985

6.100
STATIONARY FEMALE TOILET HOSPITALITY
0.600

5.0 2.7
SPORTS AREA. SPECIALIST 4.0
MECHANICAL L A
0.518 0.600

2.8

3.0
MEDICINE DR's 16 M. Sq.
Q I

3.0
3.0

0.4
4.5
0.355
COMING

RM.

3.569
1.8 0.6
06

60 m
4.1 4.5
0.6 VISIT
SPORTS

2.9

4.0
4.2

3.0
0.600

MEDICINE DR's
05 3.900

2.0

25
4.1
7.218

CE
JANITOR 3.8
0.600

N
5.4


FERE
3.627

RM. 0.9

2.9
1.9

ROO
CON

2.9
0.600

100 m 0.6
1.636

1.5
2.1
2.736

4.2

4.0
70 m
4.0
0.686

ELECTRICAL
FNLOU-003

2.8 4.2 DR. ZARKO


10.549

RM. 4.8

2.9
SURGEON

1.3
0.132

2.9
8.651 3.9 2.7
4.0
5.5 4.0

4.5
3.9 DR. ELISABET

2.9

2.9
80 m
ADMIN

2.9
SURGEON
1.5
AREA
FNLOU-003

2.5 5.4 3.9

2.9
0.6

2.9
5.4 4.1
90 m

3.9

2.9

4.5
3.7
3.9 3.9 3.9 2.9 4.1 CLIENT:
NATIONAL
2.9

4.0
TEAM 4.1
2.9

DR. EMMANOUIL
2.9

4.0
MANAGER FNLOU-002
2.9

4.0 4.1 SURGEON 4.2


2.9

60 M. Sq.

4.5
SPORTS 4.0 DR. BRUNO
SPORTS 4.0 SURGEON
MEDICINE DR's 04

3.8
MEDICINE DR's 03 4.0 4.0
SPORTS

4.5
4.5
MEDICINE DR's 02 4.0
4.0 DR. KHALID

4.5
6.6

4.5
DIRECTOR
DR. BASHIR SURGEON
3.6

0.2

4.5
7.5

3.6
7.5

SPORTS
MEDICINE NURSING CHIEF OF 4.2

0.6
LAB DIRECTOR SURGERY
3.6

4.5

DIRECTOR CONSULTANT
3.7
4.4

4.5
4.0
0.8

PHARMACY
FNLOU-002

DIRECTOR
SPORTS
MEDICINE DR. 01

1 THIRD FLOOR LAYOUT CONTRACTOR

IB TRADING & CONTRACTING


TEL: CO./ Fax: +974 4464900
+974 44320145
EMAIL: ibtradingqatar@gmail.com,
WEBSITE: www.ibqatar.com

FINISHES LEGEND · SCREED FINISH WITH CLEAR GLOSS EPOXY PAINT PROJECT
SYSTEM AS APPROVED BY ASPETAR / ASPIRE. DESIGN AND BUILD OF 3RD FLOOR OFFICES IN
FLOORS CEILING WALLS · PROPOSED PORCELAIN TILES IN THE TOILETS , PANTRY ASPETAR MAIN BUILDING
& STORE.
(SP/C/634/22)
F01
SEALED CONCRETE MATT FINISH FLOORING C01 OPEN CEILING PAINTED WITH FARE FACED W01 100MM THICK GYPSUM WALL PAINTED WITH FAIR FACE · PROPOSED EPOXY FLOOR IN SERVICES AREA
CONCRETE CONCRETE (MECHANICAL & ELECTRICAL ROOM).
ALL AS ID-CONCEPT PROVIDED.
F02 WOODEN VINYL FLOORING
LOCATION:
C02 W02 ASPETAR, ASPIRE ZONE FOUNDATION
SCOPE OF WORK AREA = 1555 Sq.m. CLIENT:
ASPIRE ZONE
F03 ATIFICIAL TURF W03 MEZZANINE FLOOR = 71 Sq.m. JOB NO.:
XX/XXXX

F04 RUBBER MATT FLOORING W04 TOTAL AREA = 1626 Sq.m TITLE:
THIRD FLOOR AND MEZZANINE
LAYOUT
W05 DRAWING NO.: SCALE:
I-01 1:100
DRAWN BY: DESIGNED BY: CHECKED BY:
W06 - AZF AQ
CAD FILE: REGISTRATION No. : REGISTRATION No. :
20564 20564
W07 REVISION SIGNATURE SIGNATURE
0

You might also like