Professional Documents
Culture Documents
2009-09-03 153642 202 Wiring Diagnostics
2009-09-03 153642 202 Wiring Diagnostics
C.2 Sliding roof open activation signal input, Ignition on < 1 VDC see diagram 77.20
initialized by S/R switch S13/2 S13/2 in slide roof open pos. 12 VDC
C.3 Sliding/pop-up roof close activation signal Ignition on < 1 VDC see diagram 77.20
input, initialized by S/R switch S13/2 S13/2 in roof close pos. 12 VDC
C.4 Main ground to W19 Approx. 0 Ohms to ground
D.2 SN1 processed locking signal input, Initialize and hold locking command activation with key
from CL/RCL system measure to circuit 30 pin 2 12 VDC or IR transmitter
D.6 SN2 processed unlocking signal input, Initialize and hold unlocking command activation with key
from CL/RCL system measure to circuit 30 pin 2 12 VDC or IR transmitter
Note 1
E.2 Circuit 30 main power input 12 VDC at all times Feed from F4f9
E.3 Circuit 15R power input 12 VDC with ignition on Feed from F3f26
Note Refer to D. M. Body and Accessories For correct position recognition, window system Note 3
Volume 2, 5.1 has to be synchronized: press switch in first detent
"up" pos., hold for at least 2 sec. after window is
fully closed
Note 1 SN1 lock signal will cause to close SN2 unlock signal will cause to open windows Model 140 does not have
windows and/or sliding/pop-up roof if open and/or sliding/pop-up roof with delay of approx. 2- summer opening feature
4 sec. (immediately if not have been closed
completely before, but only within 15 sec. of a
closing operation)
Note 2 Window position information and switch
function checks are performed best with
HHT.
(refer to DM. Body& Accessories, CF
actual values)
Note 3 Each switch has four positions: If window is not synchronized, express feature is
up, express up, down, express down inoperative and window will not move in second
detent position