Professional Documents
Culture Documents
SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
11
Done By Signature :-
SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
11
Done By Signature :-
SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
11
Done By Signature :-
SHUTDOWEN)
4 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
UNDER SHUTDOWEN)
CHECK ROW WATER TDS (30
3
TO 35)
ON ULTERNATE DAYES √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √
14
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 1/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
3 CHECK AIR LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
10
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE DATE:- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
Done By Signature :-
REMARKS : √ → OK, X → Not OK, NA → NOT APLICABLE
F/HR/07
APPROVED BY :
F/HR/07
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
(DIWALI HOLIDAY
1 CLEAN MACHINE CAREFULLY DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √
SHUTDOWEN)
2 CHECK TR. OIL LEVEL DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √
PLANT
3 NO ANY OIL LEAKAGE DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √
NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :-01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
2 CHECK VOLTMETER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
(PLANT UNDER
SHUTDOWEN)
3 CHECK AMP. METER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK VOLTMETER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK VOLTMETER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
(PLANT UNDER
2 CHECK VOLTMETER
SHUTDOWEN)
3 CHECK AMP. METER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3
DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK INPUT VOLTAGE 11 KV √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
5 ALL INDICATOR √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
6 MCB WORKING √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
7 SMOOTHLY OPERATE √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE
F/MAINT/03 Prepared By : KAMAL KANT SHINDE DATE :- 1/11/2015 Approved By : S V SING (PLANT HEAD) DATE :- 1/11/2015 Sheet No. : 01 of 01