You are on page 1of 14

MAHAVIR DIE CASTERS PVT LIMITED, PLANT - 3 , MANESAR

Daily Machine Check Sheet


AIR COMP. No. (1)
Machine Name :- 250CFM
Month:- NOV-2015 .

Machine No. :- NAR10204394 ML37-7.5 Date :-

S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING DAILY

2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 AIR FILTER CLEAN (SUNDAY / MONDAY) NA NA NA NA NA NA √ NA NA NA √ NA NA NA NA NA √ NA NA NA NA NA NA √ NA

DIWALI HOLIDAY (PLANT UNDER


4 NO ANY AIR LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 NO ANY OIL LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CHECK POWER VOLTAGE (SUNDAY / MONDAY) √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK ALL PUSH BUTTON


8
CONDITIONS
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

9 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK ALL PRESSURE


10
GAUGE
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

11

Done By Signature :-

Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

Prepared By :KAMAL KANT


F/MAINT/03 Date :- 01/11/2015 Approved By : S.V. SINGH (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
SHINDE
MAHAVIR DIE CASTERS PVT LIMITED, PLANT - 3 , MANESAR

Daily Machine Check Sheet


AIR COMP. No. (2)
Machine Name :- 250CFM
Month:- NOV-2015 .

Machine No. :- ML37-7.5 Date :-

S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING DAILY

2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 AIR FILTER CLEAN (SUNDAY / MONDAY) NA NA NA NA NA NA √ NA NA NA √ NA NA NA NA NA √ NA NA NA NA NA NA √ NA

DIWALI HOLIDAY (PLANT UNDER


4 NO ANY AIR LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 NO ANY OIL LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CHECK POWER VOLTAGE (SUNDAY / MONDAY) √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK ALL PUSH BUTTON


8
CONDITIONS
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

9 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK ALL PRESSURE


10
GAUGE
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

11

Done By Signature :-

Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

Prepared By :KAMAL KANT


F/MAINT/03 Date :- 01/11/2015 Approved By : S.V. SINGH (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
SHINDE
MAHAVIR DIE CASTERS PVT LIMITED, PLANT - 3 , MANESAR

Daily Machine Check Sheet

Machine Name :- AIR COMP. No. (3) 20CFM Month:- NOV-2015 .

Machine No. :- Date :-

S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING DAILY

2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 AIR FILTER CLEAN (SUNDAY / MONDAY) NA NA NA NA NA NA √ NA NA NA √ NA NA NA NA NA √ NA NA NA NA NA NA √ NA

DIWALI HOLIDAY (PLANT UNDER


4 NO ANY AIR LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 NO ANY OIL LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

SHUTDOWEN)
6 CHECK OIL LEVEL DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CHECK POWER VOLTAGE (SUNDAY / MONDAY) NA NA NA NA NA NA √ NA NA NA √ NA NA NA NA NA √ NA NA NA NA NA NA √ NA

CHECK ALL PUSH BUTTON


8
CONDITIONS
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

9 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK ALL PRESSURE


10
GAUGE
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

11

Done By Signature :-

Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

Prepared By :KAMAL KANT


F/MAINT/03 Date : - 01/11/2015 Approved By : S.V. SINGH (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
SHINDE
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- AIR DRYER(REF) 500 NI/MIN. Month:- NOV- 2015 .

Machine No. :- OM189 S1PL7/2015 Date :-

S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING

DIWALI HOLIDAY (PLANT UNDER


2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 CHECK AIR TEMP. DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

SHUTDOWEN)
4 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 POWER SUPPLY 400 VOLT AC (SUNDAY / MONDAY) NA NA NA NA NA NA NA √ NA NA √ NA NA NA NA NA √ NA NA NA NA NA NA √ NA

DRAIN WATER FROM


6
RECEIVER
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DRAIN WATER FROM WATER


7
DRAIN TAP
DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-

Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet


Machine Name :- RO PLANT Month:- NOV. 2015 .
Machine No. :- 6000 LITTER/ HR Date :-
S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING DAILY

DIWALI HOLIDAY (PLANT


2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

UNDER SHUTDOWEN)
CHECK ROW WATER TDS (30
3
TO 35)
ON ULTERNATE DAYES √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √

4 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 POWER SUPPLY 400 VOLT AC (SUNDAY / MONDAY) √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 BACK WASH FOR 20 MIN. DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CLEAN MEMRAIN FILTER (SUNDAY / MONDAY) √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK PH OF OUT LET WATER


8
6 TO 7 PH.
ON ULTERNATE DAYES √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √

CHECK TDS OF OUT LET


9
WATER 80 TO 200 HZ.
ON ULTERNATE DAYES √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √ NA √

10 SET PROD. ROTOMETER 40% DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

11 SET RES. ROTOMETER 60% DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

12 CLEAN SENCER (SUNDAY / MONDAY) √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

13 NO ANY WATER LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

14

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 1/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet


Machine Name :- ETP PLANT Month:- NOV - 2015 .
Machine No. :- Date :-
S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 RUNNING HOURS READING DAILY

2 CLEAN MACHINE CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
3 CHECK AIR LEAKAGE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 NO ANY ABNORMAL NOISE DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 POWER SUPPLY 400 VOLT AC (SUNDAY / MONDAY) √ NA NA NA NA NA NA √ √ √ √ NA NA NA NA NA NA √ NA NA NA NA NA NA √

6 DRAIN SILAGE AS PER SCHEDUEL NA NA NA √ NA NA NA √ NA NA √ NA NA NA √ NA NA NA √ NA NA NA √ NA NA

7 POLYELECTROLYTE DOSING AS PER SCHEDUEL √ NA NA NA NA NA NA √ NA NA √ NA NA NA NA NA NA √ NA NA NA NA NA NA √

8 SARIS DOSING AS PER SCHEDUEL √ NA NA NA NA NA NA √ NA NA √ NA NA NA NA NA NA √ NA NA NA NA NA NA √

9 LIME POWDER AS PER SCHEDUEL √ NA NA NA NA NA NA √ NA NA √ NA NA NA NA NA NA √ NA NA NA NA NA NA √

10

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE DATE:- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

DAILY LIFTER CHECK SHEET


LIFTER Name :- MONTH:- JUNE 2023

LIFTER NO. :- Date :-

S. No. CHECK POINTS DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CHECK SEAT BELT DAILY

2 CHECK REVERSE HORN DAILY

3 AVALIBILITY OF HELMET DAILY

4 LIGHT WORKING DAILY

5 NO ANY OIL LEAKAGE DAILY

6 NO ANY ABNORMAL NOISE DAILY

7 CHECK ENGINE OIL LEVEL DAILY

8 CHECK COOLANT LEVEL DAILY

9 CHECK BREAK OIL DAILY

10 CHECK HYDROLIC OIL DAILY

Done By Signature :-
REMARKS : √ → OK, X → Not OK, NA → NOT APLICABLE

F/HR/07
APPROVED BY :

F/HR/07
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet


POWER TRANSFORMER 1500
Machine Name :- KVA
Month:- NOV. - 2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

(DIWALI HOLIDAY
1 CLEAN MACHINE CAREFULLY DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

SHUTDOWEN)
2 CHECK TR. OIL LEVEL DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

PLANT
3 NO ANY OIL LEAKAGE DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

4 CHECK OUTPUT VOLTAGE DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

5 CHECK OIL TEMP. DAILY NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

NA NA NA NA NA NA NA NA NA NA NA NA NA NA √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :-01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- D B PANAL - 01 & 02 Month:- NOV. - 2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CLEAN PANEL CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
2 CHECK VOLTMETER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

(PLANT UNDER
SHUTDOWEN)
3 CHECK AMP. METER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 CHECK ALL INDICATOR DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 CHECK PUSH BUTTON DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 ALL MCB WORKING SMOOTHLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CLOSE ALL PANEL COVER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- MAIN L.T. PANEL Month:- NOV. -2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CLEAN PANEL CAREFULLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK VOLTMETER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 CHECK AMP. METER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 CHECK ALL INDICATOR DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 CHECK PUSH BUTTON DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 ALL ACB WORKING SMOOTHLY DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CLOSE ALL PANEL COVER DAILY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- L T PANEL - 03 Month:- NOV - 2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CLEAN PANEL CAREFULLY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK VOLTMETER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

3 CHECK AMP. METER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 CHECK ALL INDICATOR √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 CHECK PUSH BUTTON √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 ALL ACB WORKING SMOOTHLY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CLOSE ALL PANEL COVER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- CAPACITOR PANEL - 01 Month:- NOV - 2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CLEAN PANEL CAREFULLY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

(PLANT UNDER
2 CHECK VOLTMETER

SHUTDOWEN)
3 CHECK AMP. METER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 CHECK ALL INDICATOR √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 CHECK PUSH BUTTON √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 ALL ACB WORKING SMOOTHLY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 CLOSE ALL PANEL COVER √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

8 CHECK CABLE HEATING √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

WORKING OF APF CONTROL


9
RELAY √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE Date :- 01/11/2015 Approved By : S V SING (PLANT HEAD) Date :- 01/11/2015 Sheet No. : 01 of 01
MAHAVIR DIE CASTERS PVT LIMITED PLANT 3

Daily Machine Check Sheet

Machine Name :- VCB 1000 Month:- NOV- 2015 .

Machine No. :- Date :-


S. No. Check Points DURATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 CLEAN MACHINE CAREFULLY √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

DIWALI HOLIDAY
(PLANT UNDER
SHUTDOWEN)
2 CHECK INPUT VOLTAGE 11 KV √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

CHECK OUTPUT VOLTAGE


3
11 KV √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

4 ALL RELAY WORKING √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

5 ALL INDICATOR √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

6 MCB WORKING √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

7 SMOOTHLY OPERATE √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √

Done By Signature :-
Remarks : √ → OK, X → Not OK, NA → NOT APLICABLE

F/MAINT/03 Prepared By : KAMAL KANT SHINDE DATE :- 1/11/2015 Approved By : S V SING (PLANT HEAD) DATE :- 1/11/2015 Sheet No. : 01 of 01

You might also like