RA Lifting Equipment 1
RA Lifting Equipment 1
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Use of Tirfor Not following the correct lifting application, X 4 4 E21 Plan the job before attempting to apply any load 1 4 H10 Refer to owners instruction manual
ignoring the recommended Safe work load to the Tirfor Inspection registers
or attempting to modify the Tirfor or any Make sure the load carrying structure will provide Load test certification
other lifting equipment may cause: adequate support to handle the fully loaded Tirfor Rigger competency
and all the weight of the operation. Colour coding
• Load to fall ALWAYS let people around know when you are
• Equipment to fail about to apply a load to the Tirfor
• Obstruction in release mechanism Tirfors must be colour coded meaning that it was
• Crushing injuries, , pinch points / nip point inspected by competent person within the last
injuries month
• Damage to tools or equipment Only certified and registered Tirfors will be used
• Possibility to cause serious injuries or All Tirfors will be visually inspected every day
even death before the job starts
Page 1 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Use of Lever hoist X 3 4 E18 • Make sure the load carrying structure will 1 4 H10 SWL- Safe Work Load
provide adequate support to handle fully loaded Refer to owners instruction manual
• Not following SWL requirements lever hoist Lifting equipment register
• Suspended load with people moving • ALWAYS let people around to know when the Current load test certification
under load chain is under tension. Colour coding
• Damage or corrosion to chains or • ALWAYS check the lever hoist daily before use. Rigger competency
mechanism effecting normal functions • ALWAYS make sure the length of chain is long Maintenance / Inspection of Tools a
• Brake system not working enough for the intended job.
• No Safety latch on hook • ALWAYS check the brake function before use.
• Pinch or nip points • ALWAYS use original chain only.
• Falling to, onto and into structures / • ALWAYS ensure the load chain is not corroded,
people or the ground is cleaned and oiled.
• Crushing injuries • ALWAYS make sure the last link of load chain is
• Hit against injuries strongly fastened to the body.
• NEVER use damaged or worn out lever hoists.
• NEVER use lever hoist with jumped out,
damaged or missing hook’s safety latch.
• NEVER use a lever hoist without a visible
marking of the lifting capacity.
• Always insure hands, fingers and arms don’t
come in to contact with pinch or nipping points on
chains or loads.
• Never use a handle other than the supplied
Page 2 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Beam Clamp Use of uncertified, unregistered beam X 4 4 E21 2 4 H14 Section 6 of the Health and Safety
clamps. Plan the job and choose the beam clamp
Using beam clamps that are not compatible accordingly, taking the following into account
with the beams they are used on. Type of clamp - adjustable/non-adjustable -
Page 3 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Overhead travelling Incompetent persons are allowed to use the X 4 4 E21 • Ensure that this beam trolley is only handed 2 4 H14 IT IS THE RESPONSIBILITY OF T
trolleys/ Beam trolley/ equipment over for use or rigging to an BE CERTAIN THE USER IS THOR
Beam Crawler Equipment does not comply to statutory operator who is trained to use it in a responsible INSTALLATION, OPERATION, AN
Page 4 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Page 5 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Page 6 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N
Page 7 of 7