IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET

RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

Equipment will only be used by trained and


competent persons
Plan the job before attempting to lift any load
Make sure the load carrying structure will provide
adequate support to handle the fully loaded chain
block and all the weight of the lifting operation.
ALWAYS let people around to know when a lift is
about to begin.
Chain block must be colour coded meaning that it
Equipment failure was inspected by competent person within the
Load falling last month. SWL- Safe Work Load
Load bearing structure is of incorrect Only certified and registered chain blocks will be Refer to owners instruction manual
design and strength used Lifting equipment register
Use of chain block Load is swinging out of control X 3 4 E18 All chain blocks will be visually inspected every 1 4 H10 Current load test certification
Nip point / pinch point injuries day before the job starts Colour coding
SWL is exceeded Safe workloads indications on chain blocks may Rigger competency
Unserviceable equipment is used never be exceeded. Maintenance / Inspection of Tools a
Equipment is modified The user will always ensure that the chain block
is properly hooked / secured to the load bearing
structure and also to the load about to be lifted.
The chain block may only be used in a straight
line.
Always insure hands, fingers and arms don’t
come in to contact with pinch or nip points on the
chains or on the load.
No modifications or substitute parts will be
allowed on the chain blocks

Use of Tirfor Not following the correct lifting application, X 4 4 E21 Plan the job before attempting to apply any load 1 4 H10 Refer to owners instruction manual
ignoring the recommended Safe work load to the Tirfor Inspection registers
or attempting to modify the Tirfor or any Make sure the load carrying structure will provide Load test certification
other lifting equipment may cause: adequate support to handle the fully loaded Tirfor Rigger competency
and all the weight of the operation. Colour coding
• Load to fall ALWAYS let people around know when you are
• Equipment to fail about to apply a load to the Tirfor
• Obstruction in release mechanism Tirfors must be colour coded meaning that it was
• Crushing injuries, , pinch points / nip point inspected by competent person within the last
injuries month
• Damage to tools or equipment Only certified and registered Tirfors will be used
• Possibility to cause serious injuries or All Tirfors will be visually inspected every day
even death before the job starts
Page 1 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

• Only competent Riggers are allowed to work


with / install the Tirfor
• The Tirfor must never be used to lift people
• The Tirfor must never be used beyond the
maximum work load indication
• Must not be used for applications other than
those they are intended for.
• Never attempt to operate the rope release
mechanism whiles the rope is under load
• Never obstruct the operating lever or rope
release mechanism
• Never attempt operating the forward and
reverse levers at the same time
• Never use a handle other than the handle
supplied for operating the Tirfor.
• It is forbidden to replace sheared pins with any
other than genuine Tirfor replacement parts.

Use of Lever hoist X 3 4 E18 • Make sure the load carrying structure will 1 4 H10 SWL- Safe Work Load
provide adequate support to handle fully loaded Refer to owners instruction manual
• Not following SWL requirements lever hoist Lifting equipment register
• Suspended load with people moving • ALWAYS let people around to know when the Current load test certification
under load chain is under tension. Colour coding
• Damage or corrosion to chains or • ALWAYS check the lever hoist daily before use. Rigger competency
mechanism effecting normal functions • ALWAYS make sure the length of chain is long Maintenance / Inspection of Tools a
• Brake system not working enough for the intended job.
• No Safety latch on hook • ALWAYS check the brake function before use.
• Pinch or nip points • ALWAYS use original chain only.
• Falling to, onto and into structures / • ALWAYS ensure the load chain is not corroded,
people or the ground is cleaned and oiled.
• Crushing injuries • ALWAYS make sure the last link of load chain is
• Hit against injuries strongly fastened to the body.
• NEVER use damaged or worn out lever hoists.
• NEVER use lever hoist with jumped out,
damaged or missing hook’s safety latch.
• NEVER use a lever hoist without a visible
marking of the lifting capacity.
• Always insure hands, fingers and arms don’t
come in to contact with pinch or nipping points on
chains or loads.
• Never use a handle other than the supplied
Page 2 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

handle for operating the of lever hoist.


• Never attempt to operate the chain release
mechanism whiles the rope is under load
• Never obstruct the operating lever or chain
release mechanism
• It is forbidden to replace sheared pins with any
other than genuine shear pin model etc

• The safe rated capacity of the beam can


never be exceeded. The dead weight of the
object to be handled plus the weight of the lifting
beam cannot exceed the safe rated capacity of
the crane(s) to which it is attached.
Inspection procedures
• Safe operating practices require scheduled
inspection procedures to ensure that the
spreader beam is maintained in a safe operating
condition.
• The spreader beam must be inspected visually
at the beginning of each shift to be sure it is in
• When the beams safe working load are
safe operating condition and that all attachments
exceeded or if there is loss of weld integrity
Spreader Beams/ are fully engaged and tight.
or signs of structural fatigue the spreader X 4 4 E21 1 4 H10
Lifting Beams • All capacity, weight and safety markings must
beam can cause loads to fall and lead to
be in place and legible.
fractures or/ and fatalities.
• Periodic inspections of the spreader beam must
be scheduled at least once every
• Periodic inspections must check for at least the
following conditions:
• Loss of weld integrity
• Signs of structural fatigue or deformation
• Wear on connecting pins, chains, shackles,
hooks or other hardware
• Wear in excess of 20% of original on bail,
connecting pins, hooks or associated hardware
Spreader beams with any of these problems must
be removed from service immediately.

Beam Clamp Use of uncertified, unregistered beam X 4 4 E21 2 4 H14 Section 6 of the Health and Safety
clamps. Plan the job and choose the beam clamp
Using beam clamps that are not compatible accordingly, taking the following into account
with the beams they are used on. Type of clamp - adjustable/non-adjustable -
Page 3 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

scissor, screw or bolt action.


Capacity and beam size or range of beam sizes.
Suitability of the beam.
Type of lifting appliance to` be used.
The safe use of beam clamps will largely be
governed by the requirements for the lifting
appliance with which it is to be used but should
take the following matters into account:
Never:
• Do not use defective beam clamps, lifting
appliances or accessories.
Never allow the beam clamp to cause localised
overloading.
Never exceed the Safe Work Load of the beam
Using a beam clamp on a beam of clamp
insufficient strength or anchorage Care must be taken to ensure no one clamp
• Replacing bolts, shackles etc. without takes more than its SWL
consulting the supplier. Always:
• Throw or drop beam clamps. Ensure the structure from which the clamp is to
• Use beam clamps on damaged or be suspended is undamaged and is adequate for
distorted beams. the full load that will be imposed upon it If any
• Force or wedge hooks of lifting appliances doubt exists consult a Competent Person to
into the attachment eye confirm suitability.
Ensure the clamp is suitable for the application,
correct size and profile for the beam and seats
correctly.
Ensure the lifting appliance is compatible with the
clamp and that hooks or other attachments fit
freely into the eye / shackle of the clamp
The clamp must be positioned directly over the
centre of gravity of the load and the load must not
be allowed to swing or impose an oblique
loading.
If two clamps are to be used in tandem the use of
ancillary equipment may also be necessary, e.g.
spreader beam.

Overhead travelling Incompetent persons are allowed to use the X 4 4 E21 • Ensure that this beam trolley is only handed 2 4 H14 IT IS THE RESPONSIBILITY OF T
trolleys/ Beam trolley/ equipment over for use or rigging to an BE CERTAIN THE USER IS THOR
Beam Crawler Equipment does not comply to statutory operator who is trained to use it in a responsible INSTALLATION, OPERATION, AN
Page 4 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

requirements manner. INSPECTION, MAINTENANCE AN


Equipment is not inspected each time • Never use a trolley which is not in good, working TRAINING AND INSTRUCTION RE
before it is mounted condition. USER AND THE USER’ S MANAG
Equipment is overloaded • Continuous monitoring of the condition of the
Beams of insufficient strength is used for trolley is an important safety consideration.
attachment purposes • Consequences of dismantling or
Stop blocks are not fitted to the beam / stop altering the trolley by any unauthorized person
blocks of incorrect design is used / can be detrimental
equipment fitted to sloping beams / Replacement of original parts by parts of another
equipment is fitted to damaged / corroded manufacturer is strictly prohibited.
beams / localised overloading is allowed. • Never apply or attempt to apply to the trolley a
SWL indication is not prominently displayed load or effort greater than the
Loads are allowed to swing / it is attempted rated load capacity of the trolley and of its
to lift the load out of plum anchoring point and support.
Safety features is removed from the • Beam trolley must not be used in explosive
equipment. atmospheres.
Suspended loads are moved over people • A Beam trolley must be fitted exclusively on
Moving loads by pulling / pushing on the metal I beams of standard design of the proper
chains strength. Exclude any ornamental I beams.
Loads are allowed to collide with objects in • The strength of the I beam requires that
its way evaluation of the beam’s strength and all its
support be carried out by a qualified person.
• This person must ensure that the supporting
structure is in compliance with all applicable
safety regulations.
• The Beam trolley must not be put into service
before proper end stops are
fastened to the I beam at each end to prevent
rolling off the end of a beam
during use.
• Always check that the load capacity on the
nameplate which is affixed on the trolley remains
fully legible. In case it is obscured, damaged or
missing it must be replaced by a new one before
any further use.
• Do not mount the trolley on sloping
• beams which are not fitted with a rack rail
• Never mount the Beam trolley on an
• unsuitable support as this may damage the
components of the trolley and potentially cause
personal injury

Page 5 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

• Never intentionally cause the load to swing.


• Never move or remove the end stops fitted at
the end of the beam while the trolley is in use.
• Never use the Beam trolley as a ground when
welding
• Never suspend loads from the hand chain of a
geared trolley.
• Never remove the safety devices from the Beam
trolley or use the trolley without these devices.
• Never suspend loads from the Beam trolley
other than by the anchor point provided.
• Never walk or stand under a suspended load or
cause the load to pass over persons.
• Never move a Beam push trolley other than by
pushing or pulling on the load.
• Never move a Beam chain-operated trolley
other than by using the hand chain provided.
• Check regularly that the trolley is in good
working order, in particular the running wheels.
Never use a device which is not in apparent good
working order.
• Check that the traversing beam on which the
trolley is travelling is compatible with the intended
load.
• Before moving or performing any operation with
the Beam trolley check that it is correctly
positioned on the
traversing beam.
• When moving a load, check that it is not likely to
collide with any obstacles in the surrounding
area.
• Before moving the Beam trolley, it must be
perpendicular to the load and the load must be
correctly balanced.
• Beam trolleys used outside must be
adequately protected against adverse weather
conditions.
• If the device behaves abnormally or makes any
suspicious noises when it is moved along the
beam, the user must stop it immediately and
inform a competent person.

Page 6 of 7
IMS-KSA-HSE-3-0004-1 Rev 02 HSE RISK ASSESSMENT SHEET
RA Template
Risk Assessment Number: KEN-RA- Project Number: SC 3027_________Project Title: Medupi Power Station Project
Hazard Risk Value Risk Value (After
Class (Before Mitigation)
MS Mitigation)
Activity Hazards Mitigation and Control Measures Remarks or References
Ref. C
L
H S E O Rating LO CON Rating
O
N

Hazard Class Rating Consequence (CON)


E – Extreme Insignificant Minor Moderate Major Catastrophi Risk Control Analysis
Risk c E = Extreme risk Immediate action required
H - Health H – High Risk Likelihood 1 2 3 4 5 activity must not start. Highest level of
(LO)
S - Safety M – Medium Management needs to be involved.
Almost
Risk
Certain
5 H11 H16 E20 E23 E25 H = High risk Senior management needed to
E - Environment L – Low Risk
control the risk. Senior Management need to be
Reviewed by: Sign: Date:
Likely 4 M7 H12 H17 E21 E24 involved.
Construction Supervisor
Possible 3 L4 M8 H13 E18 E22 M = Medium risk Complete risk assessment.
Reviewed by: Sign: Date:
Site Manager
Identify Hazards and implement controls.
Unlikely 2 L2 L5 M9 H14 E19
Reviewed by: Sign: Date: Management responsibility must be specified.
HSE Manager L = Low risk Identify hazards and implement
Note: Communicate Risk Assessment to all people Rare 1 L1 L3 M6 H10 H15
involved controls. Manage by routine processes.

Page 7 of 7