You are receiving this report as a Manufacturing Factory for the above-referenced Applicant.
This report covers the Safety evaluation of the referenced model(s) according to the standard(s)
specified above.
This report includes portions of the full Applicant report and is designed to support any Follow-Up
inspections at the Manufacture’s facility.
Please refer to any Supplements to this document for a detailed manufacturer report, which includes
information for the Follow-Up Inspection as specified below:
- Appendix C: Follow-Up Service Documentation
- Appendix A: Enclosures
Report Modifications Summary
The following changes were made to this report. If none listed in the below table, this report is the
originally issued report.
NOTE: Some of the changes listed below were made in the full report and may not reflect the changes in
this associated Factory Report, which just includes the Appendices listed above from the main report.
Date Modified
Modifications Made (include Report Reference Number) Modified By
(Year-Month-Day)
2017-01-03 Original report. Report No.: E355312-D1000-1/A0/C0-UL Cary Hu
Amendment 01. Report No.: E353512-D1000-1/A1/C1-UL
Add one additional model: JCB35R,
1) Below tests were performed, see details on Record Details
and related Tables
4.11 Power Input
5.7 Humidity Conditioning
5.9.2 Determination of Accessible Parts
8.4.2 Limitation of Voltage, Current of Power
8.4.3 Voltage of Charge Limitation
8.5.4 Working Voltage Measurements
8.7 Leakage Current Tests
8.7.4.6 Touch leakage Current
8.7.3 e) Non-Frequency-Wighted Leakage Current
8.8.3 Dielectric Voltage Withstand
11 Temperature
11.6.5 Harmful Ingress (Water and Particulates)
11.6.6 Cleaning and Disinfection Cary Hu / Paul B
2017-06-16
11.8 Interruption of the Power Supply Zhang
13 Abnormal
15.3.2 Enclosure Force
15.3.3 Enclosure Impact
15.3.6 Mold Stress Relief