CMR PHILIPPINES INC.

14 F Penthouse Alpap ll Bldg. Trade St. Corner Investment Drive


Ayala Alabang Madrigal Business Park Ayala Alabang
Muntinlupa City Philippines
TEL: 810-5352
FAX:889-0995

INSPECTION REQUEST FORM

To : A. G. Araja Construction & Dev’t Corp. From: CMR Philippines Inc.


Project : Construction of MRT 7 Station 7 Date: June 09, 2023

Description of portion of Contract work requiring Inspection:


Roughing Ins (Embedded Piping layout) of MRT 7 – Station 7 at Phase 1

General location of work requiring Inspection:


MRT 7 – Station 7 Phase 1 (Second floor-Concourse Level)

Specific location of work requiring Inspection:


A. Building, structure, or site location and description as defined on Plans: SCCR, AFC Gates, Unpaid Concourse

B. Gridlines defining limits of Inspection: Second Floor 11-13 // B’-D

C. Specific gridlines where Inspection requested (when B not applicable):

REMAINDER OF FORM TO BE FILLED OUT BY INSPECTOR OF RECORD

Construction as described above has NOT been accepted. I.O. R. Initial / Date Stamp
Explanation:

Construction as described above has been I.O. R. Initial / Date Stamp


inspected and accepted.

Not accepted unless initialed and dated by I.O.R.


SMC Mass Rail Transit 7 Inc.
Reference No.
MRT7-ARAJA-LTR-22-0030
\jmcp \

17 June 2022

A.G. ARAJA CONSTRUCTION


AND DEVELOPMENT CORP.
AGA Building Jaguar Street
Mercado Village, Sta. Rosa City
Laguna, Philippines

To : ARIEL G. ARAJA
Chairman/CEO

Subject : MRT 7 PROJECT – PRODUCT DATA OF ATLANTA PERMALINE:


uPVC Electrical Conduit System

Gentleman :

We refer to your submission of June 07, 2022, with Ref. No. MRT7-AGA-TRN-060722-080,
regarding the product data of Atlanta Permaline for uPVC electrical conduit system.

We have no more objections to the said submission. However, we note that this will not relieve
the Contractor from its obligations and responsibilities in compliance with project requirements,
specifications, and applicable codes and standards.

Sincerely,
Digitally signed by
Hyung-Wook Kim
Date: 2022.06.17
14:20:09 +08'00'

HYUNG-WOOK KIM
Project Director
MRT 7 Project

1
ARAJA-MRT7-TRN-22-0080

AGA'S Copy

A.G. ARAJA Construction and Development Corp.


C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t
AGA Building, Jaguar St., Mercado Village, Sta. Rosa City, Laguna, Philippines
Telefax. Nos: (02) 584-4412/13, (049)502-9424
E-mail: agaraja@gmail.com

TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-060722-080
Date : June 07, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director

Thru: : Mr. Mark Jelly Musa


SMC - DCC

We transmit the following:

Copy Unit Date DESCRIPTION Action Code


1 set SUBJECT: PRODUCT DATA OF ATLANTA PERMALINE: uPVC Electrical B
Conduit System
Reference No. AGA-SRF-ST7-EE-PD-22-0046
*****nothing follows*****

ACTION A Action indicated on item transmitted. D For your signature.


CODE B For your review, comments and approval. E For return
C For your information/reference F See REMARKS below.
Remarks :

Transmitted by: Received by:

AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
June 07, 2022
Date Date/Time

AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
SMC Mass Rail Transit 7 Inc.
Reference No.
MRT7-ARAJA-LTR-22-0035
\jmcp \

29 June 2022

A.G. ARAJA CONSTRUCTION


AND DEVELOPMENT CORP.
AGA Building Jaguar Street
Mercado Village, Sta. Rosa City
Laguna, Philippines

To : ARIEL G. ARAJA
Chairman/CEO

Subject : MRT 7 PROJECT – Product Data of MC GILL - Metal Boxes (Utility Box
and Pullbox) and Accessories

Gentleman :

We refer to your submission of June 22, 2022, with Ref. No. MRT7-AGA-TRN-062222-122,
regarding the above-captioned subject matter.

We have no more objections to the said submission. However, we note that this will not relieve
the Contractor from its obligations and responsibilities in compliance with project requirements,
specifications, and applicable codes and standards.

Sincerely,
Digitally signed by
Hyung-Wook Kim
Date: 2022.06.29
14:37:46 +08'00'

HYUNG-WOOK KIM
Project Director
MRT 7 Project

1
ARAJA-MRT7-TRN-22-0122

AGA'S Copy

A.G. ARAJA Construction and Development Corp.


C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t
AGA Building, Jaguar St., Mercado Village, Sta. Rosa City, Laguna, Philippines
Telefax. Nos: (02) 584-4412/13, (049)502-9424
E-mail: agaraja@gmail.com

TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-062222-122
Date : June 22, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director

Thru: : Mr. Mark Jelly Musa


SMC - DCC

We transmit the following:

Copy Unit Date DESCRIPTION Action Code


1 set SUBJECT: Product Data of MC GILL - Metal Boxes (Utility Box and Pullbox) and B
Accessories
Reference No. AGA-SRF-ST7-EE-PD-22-0063
*****nothing follows*****

ACTION A Action indicated on item transmitted. D For your signature.


CODE B For your review, comments and approval. E For return
C For your information/reference F See REMARKS below.
Remarks :

Transmitted by: Received by:

AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
June 22, 2022
Date Date/Time

AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
TRANSMITTAL FORM
SMC Mass Rail Transit 7 Inc.
Reference No.
MRT7-ARAJA-TRN-22-0372
\jcgm\

To: A.G. ARAJA CONSTRUCTION Date: November 5, 2022


AND DEVELOPMENT CORP.
AGA Building Jaguar Street
Mercado Village, Sta. Rosa City
Laguna, Philippines

Through: ARIEL G. ARAJA


Chairman/CEO
Digitally signed by HYUNG-
WOOK KIM
Date: 2022.11.05 20:23:26
+08'00'

From: HYUNG-WOOK KIM


Project Director, MRT 7 Project

We are transmitting herewith the following documents:

Letter Technical Drawings Technical Docs. Billing (Invoice / PRM)


Memo Report(s) Legal Doc. Other(s)

NO. QTY COPY TYPE DOCUMENT NAME ATTACHMENT(S)


MRT 7 PROJECT –
Proposed Shop
OC CTC PC SC Drawing of Second MRT7-AGA-TRN-102522-
1 1
Floor Plan - Concourse 511
Level Power System
Layout, Rev. 1

[OC – “Original Copy”| CTC – “Certified True Copy”|PC – “Photocopy”|SC – “Soft Copy”]

Transmitted For:

Approval Review & Comments Information & Reference Return


Signature Resubmission Copy & File Other(s) ________

Remarks: Received By:_________________________________

Date & Time:_________________________________


Please see the attached file for the comments.

FRM-MRT7-DCC-00003 rev 0 1
ARAJA-MRT7-TRN-22-0511

AGA'S Copy

A.G. ARAJA Construction and Development Corp.


C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t
AGA Building, Jaguar St., Mercado Village, Sta. Rosa City, Laguna, Philippines
Telefax. Nos: (02) 584-4412/13, (049)502-9424
E-mail: agaraja@gmail.com

TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-102522-511
Manggahan Station 7, Quezon City Date : October 25, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director

Thru: : Mr. Mark Jelly Musa


SMC - DCC

We transmit the following:

Copy Unit Date DESCRIPTION Action Code


1 copy SUBJECT: Proposed Shop Drawing of Second Floor Plan: Concourse Level B
Power System Layout, Rev.1
Reference No. AGA-SRF-ST7-EE-SD-22-0116, Rev.1
*****nothing follows*****

ACTION A Action indicated on item transmitted. D For your signature.


CODE B For your review, comments and approval. E For return
C For your information/reference F See REMARKS below.
Remarks :
Response to Transmittal MRT7-ARAJA-TRN-22-0254

Transmitted by: Received by:

AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
October 25, 2022
Date Date/Time

AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
>Provide section details.

9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000

>Coordinate with load schedule >Coordinate with drawing layout


regarding load description. regarding the location of panel.
ECB-ACCU-07-01CA ECB-ACCU-07-05CA ECB-ACCU-07-04CA ECB-ACCU-07-03CA ECB-ACCU-07-02CA
ECB-EF-07-01CA 40AT, 2P, 230V, 60Hz, MCCB 40AT, 2P, 230V, 60Hz, MCCB 50AT, 2P, 230V, 60Hz, MCCB 40AT, 2P, 230V, 60Hz, MCCB 50AT, 2P, 230V, 60Hz, MCCB
20AT, 3P, 400V, 60Hz, MCCB IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
ECB-EF-07-01CD ECB-EF-07-08(C) ECB-EF-07-07(C)
IN NEMA 3R ENCLOSURE GOING TO EDP-07-03 PANEL CKT.#1 GOING TO EDP-07-03 PANEL CKT.#10 GOING TO EDP-07-03 PANEL CKT.#8 GOING TO EDP-07-03 PANEL CKT.#6 GOING TO EDP-07-03 PANEL CKT.#4
20AT, 3P, 400V, 60Hz, MCCB 20AT, 2P, 230V, 60Hz, MCCB 20AT, 2P, 230V, 60Hz, MCCB
(MOUNTED NEAR EQUIPMENT)
IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
GOING TO DP-07-03 PANEL CKT.#1
GOING TO DP-07-03 PANEL CKT.#4 GOING TO EDP-07-03 PANEL CKT.#22 GOING TO EDP-07-03 PANEL CKT.#21
ECB-ACCU-07-01CB ECB-ACCU-07-05CB ECB-ACCU-07-04CB ECB-ACCU-07-03CB ECB-ACCU-07-02CB
40AT, 2P, 230V, 60Hz, MCCB 40AT, 2P, 230V, 60Hz, MCCB 50AT, 2P, 230V, 60Hz, MCCB 40AT, 2P, 230V, 60Hz, MCCB 50AT, 2P, 230V, 60Hz, MCCB
ECB-SF-07-01R IN NEMA 3R ENCLOSURE
20AT, 2P, 400V, 60Hz, MCCB ECB-EF-07-01CC ECB-EF-07-02(C) ECB-EF-07-06(C) IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
20AT, 3P, 400V, 60Hz, MCCB 20AT, 2P, 230V, 60Hz, MCCB 20AT, 2P, 230V, 60Hz, MCCB GOING TO EDP-07-03 PANEL CKT.#2 GOING TO EDP-07-03 PANEL CKT.#11 GOING TO EDP-07-03 PANEL CKT.#9 GOING TO EDP-07-03 PANEL CKT.#7 GOING TO EDP-07-03 PANEL CKT.#5
IN NEMA 3R ENCLOSURE
IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT) T
GOING TO DP-07-03 PANEL CKT.#3 GOING TO EDP-07-03 PANEL CKT.#17 GOING TO EDP-07-03 PANEL CKT.#20
GOING TO EDP-07-01 PANEL CKT.#18
ECB-ACCU-07-01CC ECB-ACCU-07-05CC
40AT, 2P, 230V, 60Hz, MCCB 40AT, 2P, 230V, 60Hz, MCCB
ECB-SF-07-04R ECB-EF-07-01CB ECB-EF-11C ECB-EF-07-05(C) IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
20AT, 2P, 400V, 60Hz, MCCB 20AT, 3P, 400V, 60Hz, MCCB 20AT, 3P, 400V, 60Hz, MCCB 20AT, 2P, 230V, 60Hz, MCCB GOING TO EDP-07-03 PANEL CKT.#3 GOING TO EDP-07-03 PANEL CKT.#12
IN NEMA 3R ENCLOSURE ECB-PE-07-01
IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE IN NEMA 3R ENCLOSURE
GOING TO DP-07-03 PANEL CKT.#5 80AT, 3P, 400V, 60Hz, MCCB
(MOUNTED NEAR EQUIPMENT) GOING TO DP-07-03 PANEL CKT.#2 GOING TO EDP-07-03 PANEL CKT.#19
DP-07-02 PANEL LOCATION IN NEMA 3R ENCLOSURE
GOING TO EDP-07-01 PANEL CKT.#15 GOING TO EDP-07-01 PANEL CKT.#3

ECB-EF-07-12C
20AT, 2P, 400V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE ECB-EF-07-04C
(MOUNTED NEAR EQUIPMENT) B J
CRM
J
CRM
A B EDP-07-03 PANEL LOCATION 20AT, 2P, 230V, 60Hz, MCCB
GOING TO EDP-07-03 PANEL CKT.#24 IN NEMA 3R ENCLOSURE
CRM
J
GOING TO EDP-07-03 PANEL CKT.#18
LP-07-02 PANEL CKT.# 18
ECB-SF-07-01CA
MDP-07-01 PANEL LOCATION LP-07-01 PANEL CKT.#22
30AT, 3P, 400V, 60Hz, MCCB ECB-EF-07-03C
IN NEMA 3R ENCLOSURE 20AT, 2P, 230V, 60Hz, MCCB
(MOUNTED NEAR EQUIPMENT)
J
CRM
ECB-06-FP(E)
IN NEMA 3R ENCLOSURE
GOING TO DP-07-03 PANEL CKT.#7 1000AT, 3P, 400V, 60Hz, MCCB
GOING TO DP-07-04 PANEL CKT.#8
IN NEMA 1 ENCLOSURE
ECB-EF-07-13C DP-07-01 PANEL LOCATION
ECB-SF-07-01CB 20AT, 2P, 230V, 60Hz, MCCB
30AT, 3P, 400V, 60Hz, MCCB IN NEMA 3R ENCLOSURE DP-07-02 PANEL LOCATION
IN NEMA 3R ENCLOSURE GOING TO EDP-07-03 PANEL CKT.#25
J ASS LP-07-02 PANEL LOCATION
(MOUNTED NEAR EQUIPMENT) J
CRM

GOING TO DP-07-03 PANEL CKT.#8 J


CRM
J ASS
DP-07-04 PANEL LOCATION
DP-07-03 PANEL LOCATION LP-07-01
ECB-SF-07-01CC ELP-07-01
30AT, 3P, 400V, 60Hz, MCCB LP-07-01
IN NEMA 3R ENCLOSURE J
CRM
ELP-07-01
LP-07-01
(MOUNTED NEAR EQUIPMENT)
GOING TO DP-07-03 PANEL CKT.#9 LP-07-02 PANEL CKT.# 16 J ASS ELP-07-01
CRM
J MD J MD J MD J MD
LP-07-01
J
CRM J
LP-07-01 PANEL CKT.#21
ECB-SF-07-01CD J
CRM

30AT, 3P, 400V, 60Hz, MCCB J ASS ELP-07-01


IN NEMA 3R ENCLOSURE J
CRM
ELP-07-01 PANEL CKT.#5
(MOUNTED NEAR EQUIPMENT) J ASS
J ASS ELP-07-01
GOING TO DP-07-03 PANEL CKT.#10 J ASS
J
CRM

ELP-07-01 PANEL CKT.#6


ECB-SF-07-02C ELP-07-01 PANEL CKT.# 27
30AT, 3P, 400V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE LP-07-01 PANEL CKT.#35
(MOUNTED NEAR EQUIPMENT)
ELP-07-01 PANEL CKT.# 26 A
GOING TO DP-07-03 PANEL CKT.#11
ATM
ELP-07-01 PANEL LOCATION J

LP-07-02 PANEL CKT.# 17 (CONCOURSE/PLATFORM AREA) ECB-ACCU-07-07CA


J
CRM 50AT, 2P, 230V, 60Hz, MCCB
ELP-07-01 PANEL CKT.# 32 ECB-PE-07-03 J
CRM IN NEMA 3R ENCLOSURE
LP-07-01 PANEL LOCATION 80AT, 3P, 400V, 60Hz, MCCB GOING TO DP-07-04 PANEL CKT.#2
LP-07-02 PANEL CKT.#19 (CONCOURSE AREA) CRM
ELP-07-01 PANEL CKT.# 30 J
CRM IN NEMA 3R ENCLOSURE J

GOING TO DP-07-02 PANEL CKT.#3 CRM EF


AP
ELP-07-01 PANEL CKT.# 31 J
ECB-ACCU-07-07CB
EF-07-20C 50AT, 2P, 230V, 60Hz, MCCB
ELP-07-01 PANEL CKT.#20 TAP TO LIGHTINGS IN NEMA 3R ENCLOSURE
ECB-ACCU-07-09CA LP-07-02 PANEL CKT.#23
30AT, 2P, 230V, 60Hz, MCCB (ELP-07-01 PANEL CKT.#4) J
ATM
GOING TO DP-07-04 PANEL CKT.#3
IN NEMA 3R ENCLOSURE LP-07-01 PANEL CKT.# 20
(MOUNTED NEAR EQUIPMENT) ECB-ACCU-07-08C
GOING TO DP-07-04 PANEL CKT.#5 20AT, 2P, 230V, 60Hz, MCCB
J
CRM J ASS
EF-07-19C IN NEMA 3R ENCLOSURE
EF-07-21C
EF
TAP TO LIGHTINGS GOING TO DP-07-04 PANEL CKT.#4
ECB-ACCU-07-09CB TAP TO LIGHTINGS
LP-07-02 PANEL CKT.#22 (ELP-07-01 PANEL CKT.#1) (ELP-07-01 PANEL CKT.#4)
30AT, 2P, 230V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT) DP-07-04 PANEL CKT.#16 ECB-ACCU-07-06CB
GOING TO DP-07-04 PANEL CKT.#6 WAC-07-01C 60AT, 2P, 230V, 60Hz, MCCB J

LP-07-02 PANEL CKT.#20 IN NEMA 3R ENCLOSURE J


ELP-07-01 PANEL CKT.#34 J MD J MD J MD J MD

(MOUNTED NEAR EQUIPMENT) LP-07-01


ECB-TEF-07-01C GOING TO EDP-07-03 PANEL CKT.#15 AP
J

20AT, 2P, 230V, 60Hz, MCCB EF


LP-07-01
IN NEMA 3R ENCLOSURE EF-07-14C & EF-07-15C ECB-ACCU-07-06CA
EF

60AT, 2P, 230V, 60Hz, MCCB ELP-07-01 PANEL CKT.#35 LP-07-01


(MOUNTED NEAR EQUIPMENT) TAP TO LIGHTINGS (LP-07-02 PANEL CKT.#11)
GOING TO DP-07-04 PANEL CKT.#12 IN NEMA 3R ENCLOSURE LP-07-01
DP-07-04 PANEL CKT.#17 GOING TO EDP-07-03 PANEL CKT.#13 ECB-EF-07-10C
WAC-07-02C ELP-07-01 PANEL CKT.#3 LP-07-01
LP-07-02 PANEL CKT.#21 AP
20AT, 2P, 230V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
ECB-TEF-07-02C (MOUNTED NEAR EQUIPMENT)
20AT, 2P,230V, 60Hz, MCCB GOING TO EDP-07-03 PANEL CKT.#23 ELP-07-01 PANEL CKT.#29
IN NEMA 3R ENCLOSURE DP-07-04 PANEL CKT.#18
(MOUNTED NEAR EQUIPMENT) WAC-07-03C
GOING TO DP-07-04 PANEL CKT.#13 EF

J
CRM
LP-07-01 PANEL CKT.#31
ELP-07-01 PANEL CKT.#28
ECB-TEF-07-03C J
CRM EF-07-16C
20AT, 2P, 230V, 60Hz, MCCB AP
CRM
TAP TO LIGHTINGS (LP-07-02 PANEL CKT.#12)
J
IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT)
GOING TO DP-07-04 PANEL CKT.#14 EF

ECB-EF-07-09C
20AT, 2P, 230V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT)
GOING TO DP-07-04 PANEL CKT.#9
EF-07-17C & EF-07-18C
TAP TO LIGHTINGS (LP-07-02 PANEL CKT.#12)
DP-07-04 PANEL CKT.# 19
WAC-07-04C ECB-PE-07-02
80AT, 3P, 400V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
GOING TO DP-07-02 PANEL CKT.#2

SECOND FLOOR PLAN: CONCOURSE LEVEL

1 POWER SYSTEM LAYOUT


AGA-SMB-EE-SD-006 SCALE 1:600M

A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
AGA'S Copy

A.G. ARAJA Construction and Development Corp.


C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t
AGA Building, Jaguar St., Mercado Village, Sta. Rosa City, Laguna, Philippines
Telefax. Nos: (02) 584-4412/13, (049)502-9424
E-mail: agaraja@gmail.com

TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-032423-191
Manggahan Station 7, Quezon City Date : March 24, 2023
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director

Thru: : Mr. Mark Jelly Musa


SMC - DCC

We transmit the following:

Copy Unit Date DESCRIPTION Action Code


1 copy SUBJECT: Shop Drawing - Second Floor Plan: Concourse Level Panelboard Fire B
Alarm & Detection System Layout, Rev.1
Reference No. AGA-SRF-ST7-EE-SD-23-0039, Rev.1
*****nothing follows*****

ACTION A Action indicated on item transmitted. D For your signature.


CODE B For your review, comments and approval. E For return
C For your information/reference F See REMARKS below.
Remarks :
Response to SMC Transmittal MRT7-ARAJA-TRN-23-0149

Transmitted by: Received by:

AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
March 24, 2023
Date Date/Time

AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
SUBMISSION REVIEW COMMENTS SHEET

Submission Contractor: AJ Araja Construction and Development Corp.

Reference No: MRT7-AGA-TRN-022223-109

Date Received: 23-Feb-23

Date of Comment MRT7 Contractor's


Item Document / Drawing Title Document / Drawing No. Rev Severity State MRT7 Comment Contractors's Reply
/Submittals Reviewer Reviewer

Coordinate with other MEPF services to avoid clashing with FDAS piping layout and initiating
Reflect updated layouts of other system trade. JAMP
devices installation.

Second Floor Pla: Concourse Level Fire Alarm Coordinate with system contractor for rotem equipment Reflected Rotem Equipment Layout. JAMP
1 AGA-MRT7-SD-AUX-006 (Rev.1) 1 Open 3/24/2023
& Detection System Layout

Provide Section Details. Comply partial section details for Rotem Facilities JAMP

Reflect ELV block-out Dimensions. Reflect ELV Block-out dimensions JAMP

Discipline Lead:

Signature:

Date:
A.G. ARAJA Construction and Development Corp.
C o n s t r u c ti o n a n d D e s i g n M a n a g e m e n t
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t

SUBMITTAL REVIEW FORM


To : MRT7 SMC MASS RAIL TRANSIT 7 INC. From: A. G. Araja Construction & Dev’t Corp.
Attention : Mr. Hyung-Wook Kim Project : Construction of MRT 7 Station 7
Thru : Mr. Benjamin Baguinon J.O. #: SMRT7-032422-001
Date of Submittal: March 24, 2023 Submittal No.: AGA-SRF-ST7-EE-SD-23-0039, Rev.1

ACTION
TYPE QTY UNIT DESCRIPTION CODE FLOW
DATE
A B C D
Second Floor Plan: Concourse Level
1 copy Panelboard Fire Alarm & Detection System
Layout / AGA-MRT7-SD-AUX-006, Rev.1
SHOP DWGS Intended @ MRT7 Station 7

PRODUCT Cont. to
DATA Client

SAMPLES

TEST REPORTS

MOCK UP

OTHERS

SUBMITTED BY : REVIEWER’S REMARKS:


Having reviewed this submittal, we certify that it conforms to the
- QAQC / March 24, 2023 contract conditions in all respect.
Name / Position / Date
ACTION CODE:
A - Approved Client’s Authorized Representative
B - Approved as Noted
C - Revise and Re-submit, (Work may NOT PROCEED)
D - Disapproved, (work may NOT PROCEED)

NOTED BY : APPROVED BY:


JERALD D. DAVID - CM / PAUL MICHAEL V. LAGASCA - PM / March 24, 2023
Name / Position / Date Client’s Authorized Representative

AGA-F-CMD-07 Rev. No. 0 Effectivity Date: 1/4/2012


>Smoke detectors shall be installed in a manner that provides
accessibility for periodic inspection, testing, and maintenance.
Coordinate with mechanical >Verify if the distance of ductiong and electrical conduits from the
layout for the battery room smoke-heat detectors would have an adverse effect on the
(TPSSR) gas extraction fan. detector's ability to perform.
D C
- - >Coordinate with other MEPF services.
ADDRESSABLE CONTROL MODULE ADDRESSABLE CONTROL MODULE
INTERFACE FOR ACCESS CONTROL INTERFACE FOR ACCESS CONTROL
SF-07-01R (MAGNETIC DOOR LOCK) (MAGNETIC DOOR LOCK)

EF-07-12C
C EF-07-13C FS M
FS M EF-07-01CA EF-07-08C SS M
SS M
EF-07-01CB EF-07-011C EF-07-07C 1-25mmØ (PVC EMBEDDED FOR
EF-07-01CC FDAS RISER GOING TO ROAD LEVEL)
1-25mmØ (PVC EMBEDDED FOR EF-07-06C
FDAS RISER GOING TO TRASH ROOM)

EXIT C
C C GTB
#1
C C C C C C C C C C C GTB
#2
C C C C C EF-07-05C TIXE EXIT EXIT

C
F SL
F

2647
F F SL F SL
4986 3861 ADDRESSABLE CONTROL MODULE

3919

3919

4144
F
EF-07-01CD C C INTERFACE FOR ACCESS CONTROL

EXIT
C 1673 924 (MAGNETIC DOOR LOCK)

2693
6013 8000 6509 TR
101
TR
201
R
S
4896 R
S
4388
MT T T
MF MF MI MI MR MP MP MR MI MI MF MF N N
ADDRESSABLE CONTROL MODULE
B 102 101 102 101 100 100 TIE 200 200 201 202 201 202
(FUTURE)
TR 1250 TR 1250

C
C
EDP-07-03
PANEL MDP-07-01
PANEL

INTERFACE FOR ACCESS CONTROL

1779
EP
BC2 3715 3782
- (MAGNETIC DOOR LOCK) GAP

F S L
S

F
7106
8000

1571
8798
C
SF-07-01CA M
BUSDUCT
EP
DP-07-01
PANEL
DP-07-02
PANEL
DP-07-03
PANEL
DP-07-04
PANEL
LP-07-02
PANEL

UP3
C 930

2882
AF AF
M Rack Rack

AF AF
J ASS 4214 3783

271
Rack Rack

AF

SF-07-01CB ADDRESSABLE CONTROL MODULE


Rack RECTIFIER

M TR TR 4896
N
T T 4388
MR MR MR 102 202 S S ETR DIST
BLS RTU
C 007 007 PT DS VCB (FUTURE)

C
C
S
C TR
ATS INTERFACE FOR ACCESS CONTROL

EXIT
3033
RF 2500kVA

LVM LVF EP C

4897
LVM EP
101 121 201 BC1 UP1 MJ ASS
S
UPS
(MAGNETIC DOOR LOCK)

4228
C C
SF-07-01CC M
ADDRESSABLE MONITOR MODULE
8000

4024 4024

1508
C FOR AEROSOL SUPPRESSION SYSTEM ADDRESSABLE CONTROL MODULE
VLD
INTERFACE FOR ACCESS CONTROL

1492
007

SF-07-01CD M INSULATED EPOXY FLOOR (minimum 10mm)

DCM DCF DCF NEG


S S
MJ ASS
C
(MAGNETIC DOOR LOCK)

3057
INSULATED EPOXY FLOOR (minimum 10mm) INSULATED EPOXY FLOOR (minimum 10mm)
M1 F2 F4 DS
C GTB

1522
F
3964 4033

6546
#3

REC
C
REC F S L C
102 202

1503
(FUTURE)
2S

A SF-07-02C M DCM DCF DCF DCF F SL


C
2695 2638 MJ SASS C C
3681

M2 F1 F3 FS

3405
2S M
C
ADDRESSABLE CONTROL MODULE
- C C
INTERFACE FOR ACCESS CONTROL

2709
F J ASS
J ASS
3179 F SL
F

S 4640 4157
2S M
(MAGNETIC DOOR LOCK)
J MASS
C 1

3699
1750

2941
1750

C C

EXIT
8000 6948 9067 5511
F SL

F SL

F SL
ADDRESSABLE CONTROL MODULE
INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
GAP

ATM
F J

EXIT
F SL

S ELV RISER FOR CONDUIT 3260


ADDRESSABLE CONTROL MODULE
C
(CEILING OPENING BLOCK-OUT)

AP
C INTERFACE FOR ACCESS CONTROL

1481
F

EXIT
(300mm x 100mm)

2231
GAP
(MAGNETIC DOOR LOCK)

2837
1174 F SL S
S
2-50mmØ FOR FDAS

902
2843 4831 2617 F
S

2-50mmØ FOR SMS C F SL

EF

2469

EXIT
2S
1-50mm FOR BMS

1715
1280 C
EXIT

C AP
EF

1 GAP

F
ADDRESSABLE CONTROL MODULE ADDRESSABLE CONTROL MODULE

EXIT
FOR ELEVATOR HOMING J
ATM
INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
F SL

F SL

F SL
C MJ ASS

3
4

6
7

9
0

#
*


EXIT EF
F SL
2036

C
1609 S
2S
1519

639 C

S
FIRE ALARM C

CONTROL PANEL
1223

2312
HD

1941
2041 LOCATION

C
S
AP

HD
412 809 3925

1936
S S APC
760

EF

S 1550 EF
1575
HD

2840

EXIT
1407

1901 2083 AP

605 731
F
759

AP
747

EF
F SL

S
S S
608 721
1068

1068

1224
ADDRESSABLE CONTROL MODULE

F SL
2220
2408

F
S EF S S
GAP
2284 C INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
3662

2221
2419

S
1289

AP

EXIT
EXIT
C S
S
MIMIC PANEL LOCATION AP
MIMIC

2235
2593
1610

EF
2581 EXIT
EXIT

1-25mmØ (PVC EMBEDDED FOR


FDAS RISER GOING TO TRASH ROOM)

SECOND FLOOR PLAN: CONCOURSE LEVEL

1 FIRE DETECTION & ALARM SYSTEM LAYOUT


AGA-MRT7-EE-SD-006 SCALE 1:600M

A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
VERIFY IF THE DISTANCE OF
DUCTING FROM SMOKE-HEAT
DETECTOR WOULD HAVE AN
ADVERSE EFFECT ON THE
DETECTOR'S ABILITY TO
PERFORM.

6013 8000 11987 9079 4136 3862

FAPT-951+B501/W FAPT-951+B501/W FAPT-951+B501/W FSP-951 SERIES ADDRESSABLE


4850

FAPT-951+B501/W ADDRESSABLE SMOKE DETECTOR

4650

4650
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR PHOTO-ELECTRIC SMOKE DETECTOR
5450

5250

5250
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
600

VERIFY THE TYPE/MODEL


OF SMOKE-HEAT DETECTOR
FOR THIS AREA WITH
1 SECTION ELEVATION - A
APPROVED MATERIAL
SUBMITTAL FOR FDAS.

6013 8000 11987 9079 4936 3862

DC + DC -

BUSDUCT BUSDUCT

FAPT-951+B501/W FAPT-951+B501/W 4650 FAPT-951+B501/W FAPT-951+B501/W

4650
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR

5250

5250
EGRAHC TSET

(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
EGRAHC TSET

MDP-07-01

EDP-07-03 ECB-06-FP

ECB-06-FP
CT

MDP-07-01

2 SECTION ELEVATION - B

A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
4606 6546 4897 7107 4143

FSP-951 SERIES ADDRESSABLE FSP-951 SERIES ADDRESSABLE


4850

4650

4650

4650

4650
PHOTO-ELECTRIC SMOKE DETECTOR PHOTO-ELECTRIC SMOKE DETECTOR
5450

(156mm∅ x 51mm) FASTENED TO JUNCTION BOX CUT TRP IN HALF


(156mm∅ x 51mm) FASTENED TO JUNCTION BOX
RT MV SWGR
600

1 SECTION ELEVATION - D

VERIFY THE TYPE/MODEL


OF SMOKE-HEAT DETECTOR
FOR THIS AREA WITH
APPROVED MATERIAL
SUBMITTAL FOR FDAS.
2647 2693 1779 1571 2902 3033 1492 1492 1503 1503 2709 2941

FAPT-951+B501/W FAPT-951+B501/W
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR
5250

5250

5250

5250

5250

5250
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
DP-07-01, 02, 03, 04
LP-07-02
EDP-07-03
MDP-07-01

2 SECTION ELEVATION - C

A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800