IRF - Embedded Piping Layout (Second Floor-Concourse Level)
IRF - Embedded Piping Layout (Second Floor-Concourse Level)
Construction as described above has NOT been accepted. I.O. R. Initial / Date Stamp
Explanation:
17 June 2022
To : ARIEL G. ARAJA
Chairman/CEO
Gentleman :
We refer to your submission of June 07, 2022, with Ref. No. MRT7-AGA-TRN-060722-080,
regarding the product data of Atlanta Permaline for uPVC electrical conduit system.
We have no more objections to the said submission. However, we note that this will not relieve
the Contractor from its obligations and responsibilities in compliance with project requirements,
specifications, and applicable codes and standards.
Sincerely,
Digitally signed by
Hyung-Wook Kim
Date: 2022.06.17
14:20:09 +08'00'
HYUNG-WOOK KIM
Project Director
MRT 7 Project
1
ARAJA-MRT7-TRN-22-0080
AGA'S Copy
TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-060722-080
Date : June 07, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director
AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
June 07, 2022
Date Date/Time
AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
SMC Mass Rail Transit 7 Inc.
Reference No.
MRT7-ARAJA-LTR-22-0035
\jmcp \
29 June 2022
To : ARIEL G. ARAJA
Chairman/CEO
Subject : MRT 7 PROJECT – Product Data of MC GILL - Metal Boxes (Utility Box
and Pullbox) and Accessories
Gentleman :
We refer to your submission of June 22, 2022, with Ref. No. MRT7-AGA-TRN-062222-122,
regarding the above-captioned subject matter.
We have no more objections to the said submission. However, we note that this will not relieve
the Contractor from its obligations and responsibilities in compliance with project requirements,
specifications, and applicable codes and standards.
Sincerely,
Digitally signed by
Hyung-Wook Kim
Date: 2022.06.29
14:37:46 +08'00'
HYUNG-WOOK KIM
Project Director
MRT 7 Project
1
ARAJA-MRT7-TRN-22-0122
AGA'S Copy
TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-062222-122
Date : June 22, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director
AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
June 22, 2022
Date Date/Time
AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
TRANSMITTAL FORM
SMC Mass Rail Transit 7 Inc.
Reference No.
MRT7-ARAJA-TRN-22-0372
\jcgm\
[OC – “Original Copy”| CTC – “Certified True Copy”|PC – “Photocopy”|SC – “Soft Copy”]
Transmitted For:
FRM-MRT7-DCC-00003 rev 0 1
ARAJA-MRT7-TRN-22-0511
AGA'S Copy
TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-102522-511
Manggahan Station 7, Quezon City Date : October 25, 2022
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director
AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
October 25, 2022
Date Date/Time
AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
>Provide section details.
9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000
ECB-EF-07-12C
20AT, 2P, 400V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE ECB-EF-07-04C
(MOUNTED NEAR EQUIPMENT) B J
CRM
J
CRM
A B EDP-07-03 PANEL LOCATION 20AT, 2P, 230V, 60Hz, MCCB
GOING TO EDP-07-03 PANEL CKT.#24 IN NEMA 3R ENCLOSURE
CRM
J
GOING TO EDP-07-03 PANEL CKT.#18
LP-07-02 PANEL CKT.# 18
ECB-SF-07-01CA
MDP-07-01 PANEL LOCATION LP-07-01 PANEL CKT.#22
30AT, 3P, 400V, 60Hz, MCCB ECB-EF-07-03C
IN NEMA 3R ENCLOSURE 20AT, 2P, 230V, 60Hz, MCCB
(MOUNTED NEAR EQUIPMENT)
J
CRM
ECB-06-FP(E)
IN NEMA 3R ENCLOSURE
GOING TO DP-07-03 PANEL CKT.#7 1000AT, 3P, 400V, 60Hz, MCCB
GOING TO DP-07-04 PANEL CKT.#8
IN NEMA 1 ENCLOSURE
ECB-EF-07-13C DP-07-01 PANEL LOCATION
ECB-SF-07-01CB 20AT, 2P, 230V, 60Hz, MCCB
30AT, 3P, 400V, 60Hz, MCCB IN NEMA 3R ENCLOSURE DP-07-02 PANEL LOCATION
IN NEMA 3R ENCLOSURE GOING TO EDP-07-03 PANEL CKT.#25
J ASS LP-07-02 PANEL LOCATION
(MOUNTED NEAR EQUIPMENT) J
CRM
J
CRM
LP-07-01 PANEL CKT.#31
ELP-07-01 PANEL CKT.#28
ECB-TEF-07-03C J
CRM EF-07-16C
20AT, 2P, 230V, 60Hz, MCCB AP
CRM
TAP TO LIGHTINGS (LP-07-02 PANEL CKT.#12)
J
IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT)
GOING TO DP-07-04 PANEL CKT.#14 EF
ECB-EF-07-09C
20AT, 2P, 230V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
(MOUNTED NEAR EQUIPMENT)
GOING TO DP-07-04 PANEL CKT.#9
EF-07-17C & EF-07-18C
TAP TO LIGHTINGS (LP-07-02 PANEL CKT.#12)
DP-07-04 PANEL CKT.# 19
WAC-07-04C ECB-PE-07-02
80AT, 3P, 400V, 60Hz, MCCB
IN NEMA 3R ENCLOSURE
GOING TO DP-07-02 PANEL CKT.#2
A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
AGA'S Copy
TRANSMITTAL SHEET
TO : MRT7 SMC MASS RAIL TRANSIT 7 INC. Transmittal No. : MRT7-AGA-TRN-032423-191
Manggahan Station 7, Quezon City Date : March 24, 2023
Project No. : SMRT7-032422-001
Attention : Mr. Hyung-Wook Kim
SMC - Project Director
AIREEN G. MANAGA
Signature over Printed Name Signature over Printed Name
March 24, 2023
Date Date/Time
AGA-F-GEN-15 If attachment/s listed is not included, please inform us immediately.Rev. No.: 0 Effectivity Date: 01/10/2011
SUBMISSION REVIEW COMMENTS SHEET
Coordinate with other MEPF services to avoid clashing with FDAS piping layout and initiating
Reflect updated layouts of other system trade. JAMP
devices installation.
Second Floor Pla: Concourse Level Fire Alarm Coordinate with system contractor for rotem equipment Reflected Rotem Equipment Layout. JAMP
1 AGA-MRT7-SD-AUX-006 (Rev.1) 1 Open 3/24/2023
& Detection System Layout
Provide Section Details. Comply partial section details for Rotem Facilities JAMP
Discipline Lead:
Signature:
Date:
A.G. ARAJA Construction and Development Corp.
C o n s t r u c ti o n a n d D e s i g n M a n a g e m e n t
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t
ACTION
TYPE QTY UNIT DESCRIPTION CODE FLOW
DATE
A B C D
Second Floor Plan: Concourse Level
1 copy Panelboard Fire Alarm & Detection System
Layout / AGA-MRT7-SD-AUX-006, Rev.1
SHOP DWGS Intended @ MRT7 Station 7
PRODUCT Cont. to
DATA Client
SAMPLES
TEST REPORTS
MOCK UP
OTHERS
EF-07-12C
C EF-07-13C FS M
FS M EF-07-01CA EF-07-08C SS M
SS M
EF-07-01CB EF-07-011C EF-07-07C 1-25mmØ (PVC EMBEDDED FOR
EF-07-01CC FDAS RISER GOING TO ROAD LEVEL)
1-25mmØ (PVC EMBEDDED FOR EF-07-06C
FDAS RISER GOING TO TRASH ROOM)
EXIT C
C C GTB
#1
C C C C C C C C C C C GTB
#2
C C C C C EF-07-05C TIXE EXIT EXIT
C
F SL
F
2647
F F SL F SL
4986 3861 ADDRESSABLE CONTROL MODULE
3919
3919
4144
F
EF-07-01CD C C INTERFACE FOR ACCESS CONTROL
EXIT
C 1673 924 (MAGNETIC DOOR LOCK)
2693
6013 8000 6509 TR
101
TR
201
R
S
4896 R
S
4388
MT T T
MF MF MI MI MR MP MP MR MI MI MF MF N N
ADDRESSABLE CONTROL MODULE
B 102 101 102 101 100 100 TIE 200 200 201 202 201 202
(FUTURE)
TR 1250 TR 1250
C
C
EDP-07-03
PANEL MDP-07-01
PANEL
1779
EP
BC2 3715 3782
- (MAGNETIC DOOR LOCK) GAP
F S L
S
F
7106
8000
1571
8798
C
SF-07-01CA M
BUSDUCT
EP
DP-07-01
PANEL
DP-07-02
PANEL
DP-07-03
PANEL
DP-07-04
PANEL
LP-07-02
PANEL
UP3
C 930
2882
AF AF
M Rack Rack
AF AF
J ASS 4214 3783
271
Rack Rack
AF
M TR TR 4896
N
T T 4388
MR MR MR 102 202 S S ETR DIST
BLS RTU
C 007 007 PT DS VCB (FUTURE)
C
C
S
C TR
ATS INTERFACE FOR ACCESS CONTROL
EXIT
3033
RF 2500kVA
LVM LVF EP C
4897
LVM EP
101 121 201 BC1 UP1 MJ ASS
S
UPS
(MAGNETIC DOOR LOCK)
4228
C C
SF-07-01CC M
ADDRESSABLE MONITOR MODULE
8000
4024 4024
1508
C FOR AEROSOL SUPPRESSION SYSTEM ADDRESSABLE CONTROL MODULE
VLD
INTERFACE FOR ACCESS CONTROL
1492
007
3057
INSULATED EPOXY FLOOR (minimum 10mm) INSULATED EPOXY FLOOR (minimum 10mm)
M1 F2 F4 DS
C GTB
1522
F
3964 4033
6546
#3
REC
C
REC F S L C
102 202
1503
(FUTURE)
2S
M2 F1 F3 FS
3405
2S M
C
ADDRESSABLE CONTROL MODULE
- C C
INTERFACE FOR ACCESS CONTROL
2709
F J ASS
J ASS
3179 F SL
F
S 4640 4157
2S M
(MAGNETIC DOOR LOCK)
J MASS
C 1
3699
1750
2941
1750
C C
EXIT
8000 6948 9067 5511
F SL
F SL
F SL
ADDRESSABLE CONTROL MODULE
INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
GAP
ATM
F J
EXIT
F SL
AP
C INTERFACE FOR ACCESS CONTROL
1481
F
EXIT
(300mm x 100mm)
2231
GAP
(MAGNETIC DOOR LOCK)
2837
1174 F SL S
S
2-50mmØ FOR FDAS
902
2843 4831 2617 F
S
EF
2469
EXIT
2S
1-50mm FOR BMS
1715
1280 C
EXIT
C AP
EF
1 GAP
F
ADDRESSABLE CONTROL MODULE ADDRESSABLE CONTROL MODULE
EXIT
FOR ELEVATOR HOMING J
ATM
INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
F SL
F SL
F SL
C MJ ASS
3
4
6
7
9
0
#
*
↔
EXIT EF
F SL
2036
C
1609 S
2S
1519
639 C
S
FIRE ALARM C
CONTROL PANEL
1223
2312
HD
1941
2041 LOCATION
C
S
AP
HD
412 809 3925
1936
S S APC
760
EF
S 1550 EF
1575
HD
2840
EXIT
1407
1901 2083 AP
605 731
F
759
AP
747
EF
F SL
S
S S
608 721
1068
1068
1224
ADDRESSABLE CONTROL MODULE
F SL
2220
2408
F
S EF S S
GAP
2284 C INTERFACE FOR ACCESS CONTROL
(MAGNETIC DOOR LOCK)
3662
2221
2419
S
1289
AP
EXIT
EXIT
C S
S
MIMIC PANEL LOCATION AP
MIMIC
2235
2593
1610
EF
2581 EXIT
EXIT
A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
VERIFY IF THE DISTANCE OF
DUCTING FROM SMOKE-HEAT
DETECTOR WOULD HAVE AN
ADVERSE EFFECT ON THE
DETECTOR'S ABILITY TO
PERFORM.
4650
4650
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR PHOTO-ELECTRIC SMOKE DETECTOR
5450
5250
5250
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
600
DC + DC -
BUSDUCT BUSDUCT
4650
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR
5250
5250
EGRAHC TSET
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
EGRAHC TSET
MDP-07-01
EDP-07-03 ECB-06-FP
ECB-06-FP
CT
MDP-07-01
2 SECTION ELEVATION - B
A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800
4606 6546 4897 7107 4143
4650
4650
4650
4650
PHOTO-ELECTRIC SMOKE DETECTOR PHOTO-ELECTRIC SMOKE DETECTOR
5450
1 SECTION ELEVATION - D
FAPT-951+B501/W FAPT-951+B501/W
ADDRESSABLE SMOKE DETECTOR ADDRESSABLE SMOKE DETECTOR
5250
5250
5250
5250
5250
5250
(156mm∅ x 51mm) FASTENED TO JUNCTION BOX (156mm∅ x 51mm) FASTENED TO JUNCTION BOX
DP-07-01, 02, 03, 04
LP-07-02
EDP-07-03
MDP-07-01
2 SECTION ELEVATION - C
A.G. ARAJA
Construction and Development Corp.
C o n s t r u c t i o n a n d D e s i g n M a n a g e m e n t s
LOT 39 BLK. 7, MERCADO VILLAGE PULONG STA. CRUZ,
STA. ROSA. LAGUNA, PHILIPPINES
TEL. (02) 520 8159, (049) 837 6800