Excavate and

Backfill with Soil 10" UPVC Overflor Pipe 2.00 mm HDPE Lining Excavate and
500 Backfill with Soil

Ground Level 500 500

500
Embeded 8" HDPE Pipe
2 2
Detail 'A'
NATURAL Earth 1 1
POND Detail 'A'

Section A-A: Concrete Pond Section HDPE Anchor Trench


NTS along the of perimeter pond

HDPE Anchor Trench RC Sump w/ Grating Cover


B Embeded along the perimeter of pond 10" UPVC Overflow
10" UPVC 8" HDPE Pipe Detail 'A'

100
Overflow Pipe Pipe (2 nos)

2 Embeded 8" HDPE Pipe


1 6000 6000 Natural Pond
New Sump 1200 x 1200 HDPE Lining
NEW BUND BACKFILL TO Depth to bund height
EXISTING GROUND

200
ELEVATION

Backfill and Cement Lining Cement Lining Earth Filled Bund


A A to Ground Level
Section B-B: Bund Section
NTS
B Boulder Wall
to Remove
10000

CONCRETE
HDPE Anchor Trench
POND
along the of perimeter pond
2.00 mm HDPE Lining New Sump 800 x 800
C

8" HDPE Pipe HDPE Anchor Trench 8" HDPE Overflow Pipe (2 Nos)
Existing Sump Existing UPVC Pipe
along the of perimeter pond Slope
HDPE Lining
7000
Existing Outlet
New Sump 800 x 800
Depth to Lowest Pipe Elevation

C Existing outflow pipe


and sump
Cement Lining

Excavate and Section C-C: Pond Overflow Section


Installation note: NTS
Backfill with Soil
2.00mm HDPE Lining 1. HDPE pipe must be elevated 200mm from I.L for Bolt and Nut tightening.
2. Two length of 6m pipe must be aligned during installation for sump construction. Contractor to supply and install control A2 ISSUED FOR COMMENT 14.06.23
500 valve later. A1 ISSUED FOR COMMENT
3. Minimum 1:2 slope required for HDPE lining installation.
500

4. HDPE anchor trench must be excavated and construct along the perimeter of pond to secure the lining.
Concrete Pond
500 Please be noted HDPE piping materials will arrive at the site entry on 16/6/2023 (Friday)。

CAMEROON HIGHLAND PROJECT HDPE LINING WORKS


EASTERN SOLDAR
ENG. CONST. SDN BHD
Detail "A": HDPE Anchor Trench