You are on page 1of 4

Recent revision history

# Status Description Date


A ISSUE FOR APPROVAL 26/4/23
SHOP DRAWING REVIEW
B ISSUE FOR APPROVAL 10/5/23
This shop drawing examination does not cover, architectural set out, dimension and

4.E

4.C
4.D
3.E

3.A
3.B
3.C
3.D
quantities.

This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.

This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.

3.A
3.E

3.B
3.C
3.D
This shop drawing has been reviewed and submitted with the following status:
Notes
Checked
No material may be reproduced without prior permission
Approved
Contractor must verify all dimensions on site before commencing
Approved subject to amendments work or preparing shop drawings.
made in accordance to the
engineers comments
Do not scale drawings.
Required to be re-submitted

14
Work may not proceed until said drawings are marked approved. PRELIMINARY DRAWING
Examined by: AVAN EMADI BE(STRUC),MIE(AUST),CPEng
________________________
NER,RPEQ,PRE,DEP
Signature: ________________________

Date: ________________________
16-05-2023 PROJECT NUMBER:232127-SDC
3.1

3.1

FB
TB
·
·
·
·
·
·
·

26
D3
·
·
·
·

4.2
·
·

TB
·

26
2558796

D3
·

13A
FB
TB

26
D3

03
01
3.0

3.0

13
PERIMETER SCAFFOLD

04

4.1
03

3A

02
HOIST
12A
01 LOCATION

12A
Key Plan

01
01

1
1

A09.001
A10.002

North Point

Client

CHURCH

12
WATERLOO
CONGREGATIONAL
CONTRACTOR
®

SCAFFOLD

Project
WATERLOO METRO QUARTER DEVELOPMENT

Project number Size check


WMQ-BLD4-BSA 25mm
Checked Approved Sheet size Scale
Checker Approver A1

11A
Sheet title
B CLASS HOARDING, STAIRS & PLATFORM
ITEM 4C,4G,4H,4J

Status
PLAN VIEW ISSUE FOR APPROVAL
Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9021 B
Date generated 26/04/2023 5:28:12 PM
Recent revision history
# Status Description Date

A ISSUE FOR APPROVAL 26/4/23


SHOP DRAWING REVIEW B ISSUE FOR APPROVAL 10/5/23
This shop drawing examination does not cover, architectural set out, dimension and
quantities.

This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.

This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.

This shop drawing has been reviewed and submitted with the following status:
Notes
Checked
4.A 4.B 4.C 4.D 4.E No material may be reproduced without prior permission
Approved
Contractor must verify all dimensions on site before commencing
Approved subject to amendments work or preparing shop drawings.
made in accordance to the
engineers comments Do not scale drawings.
4.C 4.D 4.E Required to be re-submitted

Work may not proceed until said drawings are marked approved. PRELIMINARY DRAWING
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
NER,RPEQ,PRE,DEP
Signature: ________________________

Level 03 Date: 16-05-2023 PROJECT NUMBER:232127-SDC


________________________

41.96 m

·
Level 09 ·
·
·
·
Level 02 60.66 m ·
·
·
·
38.86 m ·
·
·
·

Level 08
57.46 m
·

·
Level 01 ·

·
35.76 m Level 07
54.36 m
DL= 1.63KN
LL= 3.29KN
Top of Station
Level 06
34.7 m 51.26 m

RL 31.66 Level 05
48.16 m

Level 04
45.06 m

HOIST
RL 27.63 Level 03
41.96 m

Level 02
38.86 m

Key Plan
Level 01
RL 23.44 DL= 13.6KN 35.76 m
LL= 6.56KN
DL= 2.71KN
Top of Station LL= 4.93KN
34.7 m
DL= 8.3KN DL= 8.3KN
LL= 6.56KN LL= 3.27KN
LEVEL 1
RL 21.1 North Point

Client
25 sq.m

DL= 9.9KN DL= 17.7KN DL= 9.2KN CONTRACTOR


LL= 6.56KN LL= 6.56KN LL= 3.27KN ®

Max allowable Max allowable Max allowable


17KN 38KN 22KN
SCAFFOLD
Project
WATERLOO METRO QUARTER DEVELOPMENT
SECTION 1
Reactions in working load.
and max 1 working level at anyone time
Project number Size check
DL= 20.9KN
WMQ-BLD4-BSA 25mm
LL= 11.7KN DL= 15.2KN
LL= 6.58KN Checked Approved Sheet size Scale
Checker Approver A1

DL= 37.3KN DL= 37.3KN Sheet title


LL= 11.7KN LL= 11.7KN B CLASS HOARDING, STAIRS & PLATFORM
SECTION 2
ITEM 4C,4G,4H,4J

Status

ISSUE FOR APPROVAL


Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9022 B
Date generated 26/04/2023 5:28:12 PM
Recent revision history
# Status Description Date
A ISSUE FOR APPROVAL 26/4/23
B ISSUE FOR APPROVAL 10/5/23

SHOP DRAWING REVIEW

This shop drawing examination does not cover, architectural set out, dimension and
quantities.

This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of Notes
the structural drawings, specification and project instructions.
No material may be reproduced without prior permission

This review shall not relive the contractor of the responsibilities under the contract Contractor must verify all dimensions on site before commencing
nor shall it be regarded as an authority for any variation. work or preparing shop drawings.

This shop drawing has been reviewed and submitted with the following status: Do not scale drawings.

Checked

Approved PRELIMINARY DRAWING


Approved subject to amendments
made in accordance to the
engineers comments

Required to be re-submitted

Work may not proceed until said drawings are marked approved. (1270) (1830)
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
NER,RPEQ,PRE,DEP
Signature: ________________________
2438 1830 1830 1830 1270 1270
Date: 16-05-2023 PROJECT NUMBER:232127-SDC
________________________

·
·
·
·
·
·
·
·
·
·
·
·
·

Place ladder beams every 5 lifts

Key Plan

North Point

Client

DL= 20.2KN DL= 17.7KN DL= 22.8KN DL= 26.3KN DL= 18.7KN DL= 7.6KN
LL= 3.27KN LL= 6.58KN LL= 8.21KN LL= 8.27KN LL= 2.19KN LL= 1.63KN
Reactions in working load.
and max 1 working level at anyone time
SECTION 3 SECTION 4

CONTRACTOR
®

SCAFFOLD

Project
WATERLOO METRO QUARTER DEVELOPMENT

Project number Size check


WMQ-BLD4-BSA 25mm
Checked Approved Sheet size Scale
Checker Approver A1

Sheet title
B CLASS HOARDING, STAIRS & PLATFORM
ITEM 4C,4G,4H,4J

Status

ISSUE FOR APPROVAL


Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9023 B
Date generated 26/04/2023 5:28:12 PM
Recent revision history
# Status Description Date
A ISSUE FOR APPROVAL 26/4/23
B ISSUE FOR APPROVAL 10/5/23
SHOP DRAWING REVIEW

This shop drawing examination does not cover, architectural set out, dimension and
quantities.

4.5 4.6 This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.
4.4 4.5 4.6
This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.

Notes
This shop drawing has been reviewed and submitted with the following status:
No material may be reproduced without prior permission
Checked
Contractor must verify all dimensions on site before commencing
Approved work or preparing shop drawings.
7550
Approved subject to amendments
made in accordance to the Do not scale drawings.
engineers comments
Required to be re-submitted
PRELIMINARY DRAWING
Work may not proceed until said drawings are marked approved.

1270 1270
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
4.C NER,RPEQ,PRE,DEP
Signature: ________________________

Date: 16-05-2023 PROJECT NUMBER:232127-SDC


________________________
Level 09
60.66 m

Level 08
·
·
·
57.46 m
·
·
·
·
·
·
·
·
·
·
Level 07
54.36 m
F
·

·
Level 06
·
51.26 m

4.D
Level 05
48.16 m

Level 04
45.06 m
H

01
01 Level 03
41.96 m
BKH to confirm section in relation to plan
there is 1270 scaffold as shown on plan
and not reflected in section

85012
4.E 4.E Level 02
38.86 m
1830 1830 2438

Level 01
35.76 m

Top of Station
DL= 14.3KN DL= 1.84KN
34.7 m
LL= 3.57KN LL= 3.27KN Key Plan
3.A DL= 23.8KN
LL= 6.56KN

DL= 12.7KN
LL= 4.9KN

North Point

Client
3.B
stair case needs to be tied back to structure
for stability

CONTRACTOR

+ RL 15.259
®

SCAFFOLD

Project
WATERLOO METRO QUARTER DEVELOPMENT

3.C
DL= 4.85KN DL= 4.85KN
Project number Size check
LL= 5.75KN LL= 5.75KN
WMQ-BLD4-BSA 25mm
Checked Approved Sheet size Scale
Checker Approver A1
SECTION 1
PLAN VIEW Sheet title
Reactions in working load. ALLOY STAIR
3.5 3.6 and max 1 working level at anyone time
ITEM 4I

Status
ISSUE FOR APPROVAL
Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9031 B
Date generated 26/04/2023 5:28:12 PM