quantities.
This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.
This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.
3.A
3.E
3.B
3.C
3.D
This shop drawing has been reviewed and submitted with the following status:
Notes
Checked
No material may be reproduced without prior permission
Approved
Contractor must verify all dimensions on site before commencing
Approved subject to amendments work or preparing shop drawings.
made in accordance to the
engineers comments
Do not scale drawings.
Required to be re-submitted
14
Work may not proceed until said drawings are marked approved. PRELIMINARY DRAWING
Examined by: AVAN EMADI BE(STRUC),MIE(AUST),CPEng
________________________
NER,RPEQ,PRE,DEP
Signature: ________________________
Date: ________________________
16-05-2023 PROJECT NUMBER:232127-SDC
3.1
3.1
FB
TB
·
·
·
·
·
·
·
26
D3
·
·
·
·
4.2
·
·
TB
·
26
2558796
D3
·
13A
FB
TB
26
D3
03
01
3.0
3.0
13
PERIMETER SCAFFOLD
04
4.1
03
3A
02
HOIST
12A
01 LOCATION
12A
Key Plan
01
01
1
1
A09.001
A10.002
North Point
Client
CHURCH
12
WATERLOO
CONGREGATIONAL
CONTRACTOR
®
SCAFFOLD
Project
WATERLOO METRO QUARTER DEVELOPMENT
11A
Sheet title
B CLASS HOARDING, STAIRS & PLATFORM
ITEM 4C,4G,4H,4J
Status
PLAN VIEW ISSUE FOR APPROVAL
Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9021 B
Date generated 26/04/2023 5:28:12 PM
Recent revision history
# Status Description Date
This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.
This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.
This shop drawing has been reviewed and submitted with the following status:
Notes
Checked
4.A 4.B 4.C 4.D 4.E No material may be reproduced without prior permission
Approved
Contractor must verify all dimensions on site before commencing
Approved subject to amendments work or preparing shop drawings.
made in accordance to the
engineers comments Do not scale drawings.
4.C 4.D 4.E Required to be re-submitted
Work may not proceed until said drawings are marked approved. PRELIMINARY DRAWING
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
NER,RPEQ,PRE,DEP
Signature: ________________________
41.96 m
·
Level 09 ·
·
·
·
Level 02 60.66 m ·
·
·
·
38.86 m ·
·
·
·
Level 08
57.46 m
·
·
Level 01 ·
·
35.76 m Level 07
54.36 m
DL= 1.63KN
LL= 3.29KN
Top of Station
Level 06
34.7 m 51.26 m
RL 31.66 Level 05
48.16 m
Level 04
45.06 m
HOIST
RL 27.63 Level 03
41.96 m
Level 02
38.86 m
Key Plan
Level 01
RL 23.44 DL= 13.6KN 35.76 m
LL= 6.56KN
DL= 2.71KN
Top of Station LL= 4.93KN
34.7 m
DL= 8.3KN DL= 8.3KN
LL= 6.56KN LL= 3.27KN
LEVEL 1
RL 21.1 North Point
Client
25 sq.m
Status
This shop drawing examination does not cover, architectural set out, dimension and
quantities.
This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of Notes
the structural drawings, specification and project instructions.
No material may be reproduced without prior permission
This review shall not relive the contractor of the responsibilities under the contract Contractor must verify all dimensions on site before commencing
nor shall it be regarded as an authority for any variation. work or preparing shop drawings.
This shop drawing has been reviewed and submitted with the following status: Do not scale drawings.
Checked
Required to be re-submitted
Work may not proceed until said drawings are marked approved. (1270) (1830)
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
NER,RPEQ,PRE,DEP
Signature: ________________________
2438 1830 1830 1830 1270 1270
Date: 16-05-2023 PROJECT NUMBER:232127-SDC
________________________
·
·
·
·
·
·
·
·
·
·
·
·
·
Key Plan
North Point
Client
DL= 20.2KN DL= 17.7KN DL= 22.8KN DL= 26.3KN DL= 18.7KN DL= 7.6KN
LL= 3.27KN LL= 6.58KN LL= 8.21KN LL= 8.27KN LL= 2.19KN LL= 1.63KN
Reactions in working load.
and max 1 working level at anyone time
SECTION 3 SECTION 4
CONTRACTOR
®
SCAFFOLD
Project
WATERLOO METRO QUARTER DEVELOPMENT
Sheet title
B CLASS HOARDING, STAIRS & PLATFORM
ITEM 4C,4G,4H,4J
Status
This shop drawing examination does not cover, architectural set out, dimension and
quantities.
4.5 4.6 This review does not extend to the setting out of the work not does it relieve the
contractor from responsibilities. The work shall also conform to the requirements of
the structural drawings, specification and project instructions.
4.4 4.5 4.6
This review shall not relive the contractor of the responsibilities under the contract
nor shall it be regarded as an authority for any variation.
Notes
This shop drawing has been reviewed and submitted with the following status:
No material may be reproduced without prior permission
Checked
Contractor must verify all dimensions on site before commencing
Approved work or preparing shop drawings.
7550
Approved subject to amendments
made in accordance to the Do not scale drawings.
engineers comments
Required to be re-submitted
PRELIMINARY DRAWING
Work may not proceed until said drawings are marked approved.
1270 1270
AVAN EMADI BE(STRUC),MIE(AUST),CPEng
Examined by: ________________________
4.C NER,RPEQ,PRE,DEP
Signature: ________________________
Level 08
·
·
·
57.46 m
·
·
·
·
·
·
·
·
·
·
Level 07
54.36 m
F
·
·
Level 06
·
51.26 m
4.D
Level 05
48.16 m
Level 04
45.06 m
H
01
01 Level 03
41.96 m
BKH to confirm section in relation to plan
there is 1270 scaffold as shown on plan
and not reflected in section
85012
4.E 4.E Level 02
38.86 m
1830 1830 2438
Level 01
35.76 m
Top of Station
DL= 14.3KN DL= 1.84KN
34.7 m
LL= 3.57KN LL= 3.27KN Key Plan
3.A DL= 23.8KN
LL= 6.56KN
DL= 12.7KN
LL= 4.9KN
North Point
Client
3.B
stair case needs to be tied back to structure
for stability
CONTRACTOR
+ RL 15.259
®
SCAFFOLD
Project
WATERLOO METRO QUARTER DEVELOPMENT
3.C
DL= 4.85KN DL= 4.85KN
Project number Size check
LL= 5.75KN LL= 5.75KN
WMQ-BLD4-BSA 25mm
Checked Approved Sheet size Scale
Checker Approver A1
SECTION 1
PLAN VIEW Sheet title
Reactions in working load. ALLOY STAIR
3.5 3.6 and max 1 working level at anyone time
ITEM 4I
Status
ISSUE FOR APPROVAL
Sheet number Revision
WMQ-BLD4-BKH-SF-SPD-9031 B
Date generated 26/04/2023 5:28:12 PM