8-2.2.6 (Exception) Disposal of water used for flushing and testing the piping
system shall be in accordance with GI-0432.000.
8-2.2.9 (Addition) Additional inspection of any weld joint at any stage of the
fabrication may be requested by Saudi Aramco Inspection, including re-
inspection of previously inspected joints. Saudi Aramco Inspection also has
the right to request or conduct independent NDT of any joint. If such testing
should disclose gross non-conformance to the Code requirements, all repairs
and NDT costs shall be done at the contractor's expense.
8-3 Deleted.
8.3 Deleted.
8-6 Deleted.