This checklist tracks the progress of multiple vehicle projects over 4 weeks from June 5-30, 2023. It includes tasks for painting a Madza 3 Hatchback, detailing an Xpander Mitsubishi, and receiving a BMW X7. Colors indicate task status as completed (green), not started (red), on hold (orange), or during a holiday (blue).
This checklist tracks the progress of multiple vehicle projects over 4 weeks from June 5-30, 2023. It includes tasks for painting a Madza 3 Hatchback, detailing an Xpander Mitsubishi, and receiving a BMW X7. Colors indicate task status as completed (green), not started (red), on hold (orange), or during a holiday (blue).
This checklist tracks the progress of multiple vehicle projects over 4 weeks from June 5-30, 2023. It includes tasks for painting a Madza 3 Hatchback, detailing an Xpander Mitsubishi, and receiving a BMW X7. Colors indicate task status as completed (green), not started (red), on hold (orange), or during a holiday (blue).
CHECKLIST PROGRESS Project Start Date Status Week 1 Week 2 Week 3 Week 4 Project 5-10/Juni/2023 12-17/Juni 2023 19-24/Juni/2023 26-30/Juni/2023 5 6 7 8 9 10 12 13 14 15 16 17 19 20 21 22 23 24 26 27 28 29 30 31 NO TASK LEAD DONE M T W T F S M T W T F S M T W T F S M T W T F S 1 Madza 3 Hatchback 2023 1 Cuci Body 2 Poles 3 Body Kanan (Depan) 4 Body Kanan (Belakang) 5 Body Kiri (Belakang) 6 Body Kiri (Depan) 7 Kap Depan 8 Atas Mobil 9 Bember Belakang 10 Bember Depan Xpander Mitsubishi 1 Pencucian Body DONE 2 Poles Body DONE 3 Cuci Kolongan DONE 4 Ban & Velg DONE 5 Glass Polis Kaca DONE 6 Vakum Interior DONE 7 Bersihin Interior DONE 8 Bersihin Sisa Lem DONE 9 Bersihin Emblem DONE BMW X7 X-Drive 40i 1 Penerimaan Unit dan Aksesoris DONE 2 Fitting Foot step Electrik (tidak cocok) DONE
Keterangan: Sudah = Hijau Belum = Merah Blocking = Orange Libur = Biru