Book 1
Book 1
E Bed M2 9.80
Vibrated reinforced concrete Grade 30 as described in
2.60 26.00
4.10 41.00
3.60 35.28
9.70 95.06
74.80 733.04
3.60 774.00
40.10 1077.89
44.40 1098.01
O SUMMARY 3880.28
ITEM DESCRIPTION UNIT RATE (RM)
A Column M3 215
B Beam M3 215
2.6 559
2.6 559
2.6 559
2.6 6.45
2.6 6.45
2.6 6.45
2.6 6.45
2.6 6.45
2.6 6.45
O SUMMARY 1715.70
ITEM DESCRIPTION UNIT RATE (RM)
TOTAL ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH - CARRIED TO SUMMARY
QTY AMOUNT (RM)
33.6 903
48.9 1209.05
2.1 16.8
O SUMMARY 2128.85
NO ELEMENT
1 WORK BELOW LOWEST FLOOR FINISH
2 FRAME
3 UPPER FLOOR
TOTAL SECTION 'F3A1' - MAIN BUILDING WORKS (18' X 65') - CARRIED TO
7,724.41 GENERAL SUMMARY OF TENDER
FROM PAGE NO. AMOUNT (RM)
F3A1/1/1 3,879.86
F3A1/2/1 1,715.70
F3A1/3/1 2,128.85
7,724.41