You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

(LEVEL +0.0) FIRE DISCHARGE (+0.0m)


FIRE DISCHARGE (+0.00m) (LEVEL +0.0)
(LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15)
(LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m) (LEVEL +1.2m)

A
FIRE
FIRE HOSE
EXIT REEL CABINETS
FIRE
EXIT

TOILET
TOILET
LIFT LIFT TOILET ZONE FIRE FIRE FIGHTING CABINET

DN

DN
C.TOILET (F)
SERVICE ZONE EXIT
STAIR SMOKE FREE STAIR
C.TOILET (F) ZONE
COMMON (+1.2m)

(LEVEL +0.15)
LIFT

HAND WASH
LOBBY (+0.15m) (+1.2m) (+1.2m)

WC (09)
STAIR

(LEVEL +0.15)
UP
UP
URINALS (12)
LIFT LIFT

SERVICE CORRIDOR
SMOKE FREE
ZONE

FIRE FIGHTING CABINET


TOILET
UP WAITING LOUNGE HANDWASH FIRE

TO BASEMENT 1
ZONE (04)

DN

REEL CABINETS
FIRE HOSE
EXIT
L AN

SERVICE LOBBY
SERVICE LIFT

STAIR
LOW V.
DSC

ELECTRICAL
DATA

CABINET
AP E

SERVICE SMOKE FREE CORRIDOR STORE DN

PARTITION STORE TO BASEMENT 01


C

LOW V.
ELECTRICAL

DATA
CABINET

SERVICE ENTRY
FIRE FIRE
EXIT EXIT
SERVICE CORRIDOR
SERVICE ENTRY

UP
1:1
0S

CIRCULATION LOBBY (LEVEL +1.2m)


LOP
ER
AM

ESCALATOR FROM 1ST TO GROUND


P

DISH WASHING AREA


(+1.2m)
UP
UP

(LEVEL +0.15)
CONVENTION HALL A (CAPACITY 750) PANTRY
UP
UP

KITCHEN
(+1.2m)

ENTRANCE LOBBY
FOOD PROCESSING ZONE
UP

(+1.2m) UP
ENT

UP

UP
RAN

WALKWAY
CE
1

ESCALATOR FROM 1ST TO GROUND

FOOD PROCESSING ZONE


(+1.2m)
(+1.2m)
SLO
(+

PE

E
PANTRY
1
6.0

.05
mW

m)
IDE
DR

KITCHEN
OP
-OF
FZ
ON
E

18
6.0

DISH WASHING AREA


mW
IDE

ENT

(+1.2m)
DR

RAN
OP

CE
-OF

(+1.2m)
2

CONVENTION HALL B (CAPACITY 750)


FZ
ON
E

(+1.2m)

UP
FIRE FIRE VIP CORRIDOR

19 EXIT EXIT

LOW V.

DATA
ELECTRICAL
PARTITION STORE CABINET

STORE
OFFICER'S LIFT

OFFICER'S LIFT

SMOKE FREE CORRIDOR VIP LOBBY


FIRE FIGHTING VIP LIFT SHAFT
FIRE HOSE
REEL CABINETS
(+1.2m)
HANDWASH TOILET
DN FIRE

(LEVEL +0.15)
ZONE (06)
EXIT

G
WC (09)
NAM

UP

UP
SMOKE FREE
ES

DISABLE'S
ZONE URINALS (12)
TON

(+0.15m)

TOILET SMOKE FREE


LAN

STAIR ZONE
DSC

DN (+1.2m) (+1.2m) STAIR

20 SERVICE ZONE
APE
SLO

(+1.2m)
TOILET ZONE FIRE
P

DN
ER

EXIT
AM

H
FIRE FIGHTING CABINET
P

FIRE HOSE
REEL CABINETS FIRE
EXIT
FIRE
DISCHARGE HAND WASH (+1.2m) FIRE DISCHARGE
(+0.15m)

DN
(+0.8m) (LEVEL +0.15)
SLO

(+0.8m)
PE
RAM
P

FROM BASEMENT
TO BASEMENT

(+0.0) 1:8 SLOPE RAMP 1:8 SLOPE RAMP

(LEVEL +1.2m)

(LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15) (LEVEL +0.15)
I
RAMP'S WATER STOP DRAIN
SEE RAMP DETAILS (AWD-110)
RAMP'S WATER STOP DRAIN
SEE RAMP DETAILS (AWD-110)

LEGEND:
PVC FALSE CEILING
R.C.C. FALSE SLAB BOTTOM LEVEL AT 2.4m
LINTEL BOTTOM LEVEL AT 2.1m GROUND FLOOR FALSE SLAB & LINTEL LAYOUT PLAN
LINTEL BOTTOM LEVEL AT 2.4m SCALED TO FIT
SLAB OUTLINE CONSULTANT DETAILS
CONSTRUCTION OF 1 X ARMY MULTIPURPOSE COMPLEX CAD BY SAIFUL ISLAM DRG. NO. -
PROJECT TITLE OFFICE OF THE GRAVITY ARCHITECTURE STUDIO
WITH 3000 CAPACITY AUDITORIUM WITH ANCILLARY SERVICES HOUSE: 268 (4TH FLOOR-RIGHT), ROAD: 19, HD. DTMN
DW & CE (ARMY) NEW DOHS MOHAKHALI, DHAKA-1206
SCALE SCALED TO FIT SHEET NO. A.WD-031
AT MATIKATA MP CHECK POST AREA, DHAKA CANTONMENT DHAKA CANTT. E-MAIL: r ity. sb m i .com
CONSULTANT'S NAME & SIGNATURE FILE NO. - AMDT NO.
DRAWING TITLE GROUND FLOOR FALSE SLAB & LINTEL LAYOUT PLAN DO NOT SCALE. CONTRACTOR MUST VERIFY ALL MD. NAHID HASAN SUB.DATE 14 MAY 2023 CT.DATE 15 DECEMBER 2021
DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK Architect (B.Arch, IAB Membership No: H-186) SDO-T (B/R) SO- III (ARCH) SO-II (ARCH) SO- II (D) SO- I (D&C) DW & CE (Army)

You might also like