Professional Documents
Culture Documents
Pantai Hosp 500kva
Pantai Hosp 500kva
QUOTATION
PANTAI HOSPITAL AYER KEROH
DATE : 21/06/2023
AMOUNT TOTAL
DESCRIPTION QTY
(RM) (RM)
1. 1 UNIT 500kva (running capacity 80% : 417 Amp)
4 JAM PERTAMA 2,700.00 1 2,700.00
1 JAM BERIKUT 470.00 1 470.00
TRANSPORTATION 2 HALA 700.00 1 700.00
*Harga termasuk orang standby di tapak, kabel saiz 90mm 25mtr dan diesel
*NOTES
PAYEE : MUIZ HOLDINGS SDN BHD
BANK : MAYBANK / ACCT NO : 5540-6231-6940
_________________________ ______________________
Authorised Signature