UPS 93E RS EATON RS.MITRA KELUARGA CIKARANG
MIKA COOPERATE
PRICE
TOTAL
NO DESCRIPTION QTY UNIT UNIT
IDR IDR
1 PREPARATION
- Transportation and accomodation 1 ls 1,000,000.00 1,000,000.00
- Reporting and documentation 1 ls 500,000.00 500,000.00
4 VAC INSTALLATION
- IU/OU AC Split Wall - Cap. 9000 Btu/H/ 1PK (ex. Gree Type GWC-9M005) 1 unit 3,525,000.00 3,525,000.00
- Pipe, Refrigerant, Insulation, Saklar, Support, Fitting & Accessories 1 ls 2,125,000.00 2,125,000.00
- Installation, Coring, Material Support & Consumable Parts 1 ls 1,255,000.00 1,255,000.00
- PB Radiation Cover for drain connection 1 ls 1,700,000.00 1,700,000.00
KETERANGAN :
- Work periode & Deliverry Time 10 days
- Installation Warranty 6 month after BAST
- Term of Payment : 40 % Down Payment, 60% after sign BAST