NATIONAL POWER CORPOREATION

SMALL POWER UTILITIES GROUP


SIBUTU DIESEL POWER PLANT
Bgy. Amilhamja Jaafar, Sibutu, Tawi-Tawi
METER READING REPORT
Period : OCTOBER 25, 2021 to NOVEMBER 25, 2021
METER READING: DIGITAL KWH METER
PRESENT: 7153.861
PREVIOUS: 6961.426
DIFFERENCE: 192.435
MULTIPLIER: 434
SUBTOTAL: 83,516.790 kwhr
METER READING: STATION USED
PRESENT: 63727
PREVIOUS: 61108
DIFFERENCE: 2619
MULTIPLIER: 1
SUBTOTAL: 2,619.000 kwhr

NET GENERATION 80,897.790 kwhr

Prepared by : Approved by :

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II-Sibutu DPP PEC-Sibutu DPP

Witness by :

TROY HASSAN
Area Manager-TAWELCO INC
NET GEN. ST TL
47,276.77 459.00 856.23
89,672.63 730.00

136,949.40 1,189.00 856.23

136,166.84

0
NATIONAL POWER CORPOREATION
SMALL POWER UTILITIES GROUP
SIBUTU DIESEL POWER PLANT
Bgy. Amilhamja Jaafar, Sibutu, Tawi-Tawi
METER READING REPORT

SUMMARY OF KWHR METER READING REPORT


PERIOD : OCTOBER 25, 2019 12:00 NOON TO NOVEMBER 25, 2019 12;00NOON

PERIOD UNIT NO. 1 UNIT NO. 2 UNIT NO. 3 UNIT NO. 4 KWHR STATION TRANSFORMER SUB TOTAL
COVER METERING USED LOSSES GENERATION

OCT. 25 , 2019 TO
- 18,540.00 9,215.00 20,837.00 459.00 856.23 47,276.77
NOV. 5, 2019

NOV. 5, 2019 TO
- - - - 90,402.63 730.00 - 89,672.63
NOV. 25, 2019

NET GENERATION 136,949.40

Prepared by : Approved by :

JAAPAR H. HASSAN SALI A. DIMAN


Senior Engineer PEC-Sibutu DPP

Witness by :

TROY HASSAN
Area Manager-TAWELCO INC