NATIONAL POWER CORPORATION

Small Power Utilities Group


Western Mindanao Operations Division
SIBUTU DIESEL POWER PLANT
POWER INTERRUPTION REPORT
For the Period: 25 April to 25 May 2021

NAPOCOR DISTRIBUTION LINE


TIME FORCE MAJEURE PLANT
(H) AFFECTED SHUTDOWN
DATE PLANT TROUBLE LINE TROUBLE LINE MAINTENANCE REMARKS
UNIT NO. (1-Yes / 0-
No)
OUTAGE
Interrupted Restored FREQ.
HRS.
FREQ. OUTAGE HRS. FREQ. OUTAGE HRS. FREQ. OUTAGE HRS.

April 29, 2021 1520H 1755H 2,3 1 2.58 1 Auto tripped Unit no.4; electrical tripped.
April 30, 2021 0955H 1010H 2,3,4 1 0.25 1 Auto tripped Unit no.4; electrical tripped.
May 1, 2021 1008H 1033H 2 1 0.42 1 Auto tripped Unit no.4; electrical tripped.
May 2, 2021 1031H 1050H 2 1 0.32 1 E.C line fault
May 3, 2021 1906H 1920H 2,3,4 1 0.23 1 Undervoltage at unit no.2
May 3, 2021 2110H 2154H 3,4 1 0.73 1 Manually open recloser; unit no.2 pressure pipe broke
May 5, 2021 1802H 1903H 2,4 1 1.02 1 E.C line fault
May 6, 2021 0005H 0115H 4 1 1.17 1 Manually open recloser; unit no.2 unstable frequency
May 6, 2021 1238H 1249H 2 1 0.18 1 Auto tripped Unit no.4; electrical tripped.
May 8, 2021 1225H 1300H 2 1 0.58 1 Auto tripped Unit no.4; electrical tripped.
May 9, 2021 1114H 1300H 2,4 1 1.77 1 E.C line fault
May 12, 2021 1703H 1739H 2,4 1 0.6 1 E.C line fault
May 13, 2021 1818H 1839H 2,4 1 0.35 1 E.C line fault
May 19, 2021 1747H 1754H 2,4 1 0.12 1 E.C line fault
May 23, 2021 0535H 0630H 2,4 1 0.92 1 E.C line fault

8 6.23 7 5.01 0 0.00 15

Submitted by: Reviewed by: Approved by:

SALI A. DIMAN BERNARD L. YAP YAHCOB H. DARAYAN


Plant Head, Sibutu DPP Principal Engineer C Dep. Manager, SPUG-WMOD

744
5.01
738.99
1 2 3 4

Manually open recloser; unit no.2 pressure pipe broken

Manually open recloser; unit no.2 unstable frequency

0 0 0 0