You are on page 1of 18

NATIONAL POWER CORPORATION

SMALL POWER UTILITIES GROUP


LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 01 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! - Under Maintenance
2 3.75 104 125 0 390 389 0.3205 0.3283 0.3181
3 2.9 0 82 0 242 241 0.3388 0.3471 0.3199
4 6.5 0 185 0 583 569 0.3173 0.3251 0.3040

1st Shift JTA/FSA

Maintained economical load


Plant 6.5 187 392 0.0 1215 1199 0.3226 0.3269 0.3151 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance


2 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! 0.3283
3 5.50 92 160 0 505 502 0.3168317 0.3189505 0.3471
4 5.50 113 202 0 624 608 0.3237179 0.3322523 0.3251

2nd Shift AJA/ASJ/JTA

Maintained economical load


Plant 5.5 205 362 0.0 1129 1110 0.3206 0.3262 0.3269 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 5.9 100 190 0 590 588 0.3220 0.3237 #DIV/0!
3 6 86 165 0 518 517 0.3185 0.3202 0.3190
4 8 106 284 0 850 837 0.3341 0.3358 0.3323

3rd Shift JEA/JTA

Maintained economical load


Plant 8 245 639 0.0 1958 1942 0.3264 0.3290 0.3262 dispatch based on plant capability
and within the target NFR.
1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! Under Maintenance
2 9.65 102 315 0.0 980 977 0.3214 0.3224
3 14.40 88 407 0.0 1265 1259 0.3217 0.3232
4 20.00 103 671 0.0 2057 2014 0.3262 0.3331

Total

Maintained economical load


Plant 20 215 1393 0.0 4302 4251 0.3238 0.3277 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 02 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 3.13 105 105 0 330 329 0.3182 0.3223 0.3237
3 3.30 0 82 0 254 253 0.3228 0.3270 0.3202
4 5.72 0 215 0 676 660 0.3180 0.3221 0.3358

1 Shift
st
ASJ/MSI

Maintained economical load


Plant 5.72 220 402 0.0 1260 1243 0.3190 0.3235 0.3290 dispatch based on plant capability
and within the target NFR.

1 0 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance


2 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! 0.3223 Economic Shutdown
3 5.4 98 170 0 527 524 0.3226 0.3259 0.3202
4 5.7 111 212 0 635 619 0.3339 0.3373 0.3221

2nd Shift JTA/ASJ

Maintained economical load


Plant 5.5 211 382 0.0 1162 1143 0.3287 0.3343 0.3235 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 5.9 102 190 0 600 598 0.3167 0.3204 #DIV/0!
3 6.7 91 195 0 611 609 0.3191 0.3229 0.3259
4 8 108 277 0 861 849 0.3217 0.3255 0.3373

3rd Shift ASJ/JEA

Maintained economical load


Plant 8 259 662 0.0 2072 2056 0.3195 0.3219 0.3343 dispatch based on plant capability
and within the target NFR.
1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! - Under Maintenance
2 9.03 103 295 0.0 930 927 0.3172 0.3182 0.3053
3 15.40 90 447 0.0 1392 1386 0.3211 0.3225 0.3095
4 19.42 112 704 0.0 2172 2129 0.3241 0.3307 0.3161

Total

Maintained economical load


Plant 19.22 234 1446 0.0 4494 4442 0.3218 0.3255 0.3277 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 03 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 6.50 114 235 0 740 738 0.3176 0.3223 #DIV/0!
3 0.00 0 0 0 0 0 #DIV/0! #DIV/0! 0.3259 Economic Shutdown
4 6.50 0 250 0 754 739 0.3316 0.3365 0.3373

1st Shift JTA/ASJ

Maintained economical load


Plant 6.5 230 485 0.0 1494 #DIV/0! 0.3246 #DIV/0! 0.3219 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 2 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance


2 1.04 57.692 20 2 60 60 0.3333 0.3368 0.3223
3 7.2 88.056 200 2 634 607 0.3155 0.3187 0.3259
4 5 95.2 150 4 476 464 0.3151 0.3184 0.3373

2nd Shift ASJ/MSI

Maintained economical load


Plant 7.50 156 370 10.0 1170 1131 0.3162 0.3272 #DIV/0! dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 8 103.75 260 0 830 827 0.3133 0.3168 0.3368
3 3.1 68.71 70 0 213 209 0.3286 0.3324 0.3187
4 8 114.13 302 0 913 899 0.3308 0.3345 0.3184

3rd Shift JTA/JEA

Maintained economical load


Plant 8 245 632 0.0 1956 1935 0.3231 0.3266 0.3272 dispatch based on plant capability
and within the target NFR.
1 0.00 #DIV/0! 0 2.0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2 15.54 104.89 515 2.0 1630 1624 0.3160 0.3171 0.3182
3 10.30 82.233 270 2.0 847 816 0.3188 0.3309 0.3225
4 19.50 109.9 702 4.0 2143 2103 0.0000 0.0000 0.3307

Total

Maintained economical load


Plant 22 210 1487 10.0 4620 #DIV/0! 0.3219 #DIV/0! 0.3255 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 04 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 6.5 109.23 232 0 710 708 0.3268 0.3312 0.3368
3 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! 0.3187 Economic Shutdown
4 6.5 109.69 235 0 713 698 0.3296 0.3341 0.3184

1st Shift ASJ/MSI

Maintained economical load


Plant 6.50 219 467 0.0 1423 1407 0.3282 0.3320 0.3272 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance


2 1 45 15 0 45 45 0.3333 0.3372 0.3312
3 4.3 95.581 130 0 411 390 0.3163 0.3199 0.3187
4 5.12 99.805 171 0 511 496 0.3346 0.3385 0.3184

2nd Shift AJA/JTA

Maintained economical load


Plant 5.5 176 316 0.0 967 930 0.3268 0.3398 0.3320 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 8.00 121 310 0 970 965 0.3196 0.3243 0.3372
3 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! 0.3187 Under Maintenance
4 8.00 77.875 203 0 623 612 0.3258 0.3306 0.3385

3rd Shift RSE/JEA

Maintained economical load


Plant 8.00 199 513 0.0 1593 1577 0.3220 0.3253 0.3398 dispatch based on plant capability
and within the target NFR.
1 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0!
2 15.5 111 557 0.0 1725 1718 0.3229 0.3242 0.3171
3 4.3 96 130 0.0 411 390 0.3163 0.3335 0.3309
4 19.62 0 609 0.0 1847 1806 0.3297 0.3372 0.3307

Total

Maintained economical load


Plant 20.00 199 1296 0.0 3983 3914 0.3254 0.3311 #DIV/0! dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 05 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 2.03 103 67 0 210 208 0.3190 0.3302 0.3372
3 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Economic Shutdown
4 2.03 130.54 89 0 265 249 0.3358 0.3476 0.3385

1st Shift AJA/ASJ

Maintained economical load


Plant 2.03 234 156 0.0 475 457 0.3284 0.3412 0.3253 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance


2 1.8 112.22 67 0 202 200 0.3317 0.3349 0.3302
3 3 91 87 0 273 260 0.3187 0.3218 #DIV/0!
4 5.5 101.09 185 0 556 540 0.3327 0.3360 0.3385

2nd Shift RSE/JTA

Maintained economical load


Plant 5.5 187 339 0.0 1031 1000 0.3288 0.3388 0.3412 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 8.00 99 252 0 790 787 0.3190 0.3213 0.3349
3 3.80 79 95 0 302 296 0.3146 0.3168 0.3218
4 8.00 107 277 0 856 843 0.3236 0.3259 0.3360

3rd Shift JEA/MSI

Maintained economical load


Plant 8 244 624 0.0 1948 1927 0.3203 0.3239 0.3388 dispatch based on plant capability
and within the target NFR.
1 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 11.83 102 386 0.0 1202 1196 0.3211 0.3228 0.3242
3 6.8 85 182 0.0 575 556 0.3165 0.3273 0.3335
4 15.53 108 551 0.0 1677 1632 0.3286 0.3375 0.3372

Total

Maintained economical load


Plant 15.53 222 1119 0.0 3454 3384 0.3240 0.3306 0.3311 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 06 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 6.5 104.62 217 0.0 680 678.289 0.3191176 0.3199226 0.3349
3 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! 0.3168
4 6.5 109.38 228 0.0 711 696.17685 0.3206751 0.327503 0.3360

1st Shift AJA/ASJ

Maintained economical load


Plant 6.5 214 445 0.0 1391 1374 0.3199 0.3238 0.3239 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0.0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance


2 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! 0.3199 Economic Shutdown
3 4.90 67 107 0.0 329 299 0.3252 0.3307 0.3168
4 5.00 42 67 0.0 212 201 0.3160 0.3214 0.3360

2nd Shift RSE/JTA

Maintained economical load


Plant 5 108 174 0.0 541 499 0.3216 0.3485 0.3238 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0.0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance


2 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
3 8 107.13 279 0.0 857 840 0.3256 0.3295 0.3307
4 8 123.75 322 0.0 990 974 0.3253 0.3292 0.3214

3rd Shift JEA/MSI

Maintained economical load


Plant 8 231 601 0.0 1847 1815 0.3254 0.3312 0.3485 dispatch based on plant capability
and within the target NFR.

1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0!


2 6.5 105 217 0.0 680 678 0.3191 0.3199 0.3228
3 12.9 92 386 0.0 1186 1139 0.3255 0.3390 0.3273
4 19.5 98 617 0.0 1913 1871 0.3225 0.3297 0.3375

Total

Maintained economical load


Plant 19.50 194 1220 0.0 3779 3688 0.3228 0.3308 0.3306 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
LUZON OPERATIONS DEPARTMENT

DAILY NET FUEL RATE MONITORING SHEET


Date: __ 07 JULY 2021_______

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Economic Shutdown
3 7 83 175 0.0 539 537 0.3247 0.3294 0.3295
4 6.50 109.38 238 0.0 711 695 0.3347 0.3396 0.3214

1st Shift AJA/JEA

Maintained economical load


Plant 7 179 413 0.0 1250 1232 0.3304 0.3353 0.3312 dispatch based on plant capability
and within the target NFR.

1 #DIV/0! 0.0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance


2 3.41 70 76 0.0 240 238 0.3167 0.3201 #DIV/0! Economic Shutdown
3 4.20 74.524 102 0.0 313 299 0.3259 0.3295 0.3295
4 5.36 103 175 0.0 552 538 0.3170 0.3205 0.3214

2nd Shift RSE/JEA

Maintained economical load


Plant 5 221 353 0.0 1105 1075 0.3195 0.3285 0.3353 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0.0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 8.00 99 257 0.0 790 787 0.3253 0.3295 0.3201
3 3.50 95 107 0.0 334 328 0.3204 0.3245 0.3295
4 8.00 104.63 272 0.0 837 825 0.3250 0.3292 0.3205

3rd Shift NJA/MSI

Maintained economical load


Plant 8 245 636 0.0 1961 1939 0.3243 0.3279 0.3285 dispatch based on plant capability
and within the target NFR.

1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0!


2 11.41 90 333 0.0 1030 1025 0.3233 0.3248 0.3199
3 14.20 84 384 0.0 1186 1164 0.3238 0.3300 0.3390
4 19.86 106 685 0.0 2100 2057 0.3262 0.3331 0.3297

Total

Maintained economical load


Plant 20 216 1402 0.0 4316 4245 0.3248 0.3302 0.3308 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
SMALL POWER UTILITIES GROUP
WESTERN MINDANAO OPERATIONS DIVISION

DAILY NET FUEL RATE MONITORING SHEET


Date: July 8, 2021

0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H

Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 6.50 103 210 670 668 0.3134 0.3178 0.3201
3 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! 0.3245 Economic Shutdown
4 6.50 107.85 225 701 686 0.3210 0.3255 0.3205
1st Shift RSE/ASS

Maintained economical load


Plant 6.48 212 435 0.0 1371 1354 0.3173 0.3212 0.3279 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 1 50 15 0 50 50 0.3000 0.3050 0.3178
3 5.9 82 155 0 481 457 0.3222 0.3276 0.3245
4 5.06 89 150 0 452 439 0.3319 0.3373 0.3205
2nd Shift ASJ/MSI

Maintained economical load


Plant 6.79 145 320 0.0 983 945 0.3255 0.3387 0.3212 dispatch based on plant capability
and within the target NFR.
1 #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 7.08 102 230 0 720 717 0.3194 0.3239 0.3050
3 0.9 73 22 0 66 65 0.3333 0.3380 0.3276
4 8 109 295 0 873 858 0.3379 0.3427 0.3205

3rd Shift JEA/JTA

Maintained economical load


Plant 8 207 547 0.0 1659 1639 0.3297 0.3337 0.3387 dispatch based on plant capability
and within the target NFR.
1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0!
2 14.58 99 455 0.0 1440 1435 0.3160 0.3172 0.3248
3 6.80 80 177 0.0 547 521 0.3236 0.3397 0.3300
4 19.56 0 670 0.0 2026 1983 0.0000 0.0000 0.3331

Total

Maintained economical load


Plant 21.27 189 1302 0.0 4013 3938 0.3244 0.3306 0.3302 dispatch based on plant capability
and within the target NFR.

Reviewed by: Approved by:

JAAPAR H. HASSAN SALI A. DIMAN


Engineer II Plant Head
NATIONAL POWER CORPORATION
Small Power Utilities Group
Western Mindanao Operations Division

Genset Data for FRIP reference

Plant: SIBUTU DPP


Plant Head: SALI A. DIMAN

Fuel Rate Average Load


Dep Accumulated as
Rated Maximum Cap, Date Genset Model / Operational?
Unit No. Cap for of June 2021 Engine Model Generator Make Remarks
(kW) 1 hr operation 2020 1st Sem 2021 2020 1st Sem 2021 Commissioned Running Hours Manufacturer Y or N
(kW)

1 163 130 125 0.3145 0.3181 103 102 1/17/1997 42023.56 DALE-PERKINS 2006-TGI DALE Yes
2 163 130 125 0.3145 0.3181 98 106 7/1/1998 37108.57 DALE-PERKINS 2006-TGI DALE Yes
3 160 130 125 0.3144 0.3199 65 63 10/12/2011 15335.78 F.G.WILSON 6CTA8.3-G2 ZHONGQUI-PAI Yes
4 300 150 140 0.3128 0.3040 68 66 3/4/2010 12775.50 STAMFORD MTAA11-G3 ZHONGQUI-PAI Yes
NATIONAL POWER CORPORATION
Small Power Utilities Group
Western Mindanao Operations Division

Plant: SALI A. DIMAN

KW Hourly Load for July 2021

Date 0100H 0200H 0300H 0400H 0500H 0600H 0700H 0800H 0900H 1000H 1100H 1200H 1300H 1400H 1500H 1600H 1700H 1800H
1 184 177 177 179 195 221 0 0 188 250 230 209 195 0 0 192 204 253
2 187 206 199 189 194 222 172 0 220 271 244 223 211 0 0 202 214 212
3 227 221 217 212 215 274 0 0 169 224 230 220 190 0 0 170 194 249
4 221 211 206 201 217 243 0 0 164 271 239 182 167 0 0 168 174 214
5 106 0 0 0 0 0 0 0 210 243 263 221 103 0 0 93 203 216
6 214 199 210 210 233 171 0 0 220 250 0 0 161 0 0 187 208 245
7 197 189 186 181 205 201 155 0 181 266 249 263 199 0 0 196 202 221
8 186 203 198 200 212 248 179 0 214 228 200 166 183 100 98 159 190 200
9 179 180 173 172 171 218 176 0 214 254 241 212 183 0 0 191 182 212
10 189 181 177 182 183 214 164 0 199 241 230 225 203 121 126 193 205 206
11 108 204 202 200 204 235 182 0 199 282 281 267 91 0 0 0 203 257
12 230 217 207 207 202 250 176 0 113 145 274 244 229 216 212 203 203 221
13 206 205 195 193 208 229 0 0 197 0 0 258 252 244 230 216 205 216
14 198 224 220 223 224 275 0 0 0 240 296 232 113 96 93 0 182 230
15 220 208 204 193 199 234 0 0 158 241 180 163 152 0 0 180 0 100
16 181 174 173 171 184 229 0 0 200 232 236 205 90 0 176 207 188 226
17 113 215 213 210 211 242 203 0 0 0 171 150 145 140 143 100 0 0
18 232 222 212 212 222 261 0 0 180 245 258 221 208 118 0 118 105 129
19 233 223 230 195 0 0 0 0 260 306 280 246 217 0 0 0 226 302
20 218 209 206 204 218 245 188 0 0 0 207 210 0 200 0 0 0 258
21 0 0 0 0 0 0 0 343 242 259 248 221 212 0 0 165 203 240
22 112 237 224 219 220 252 200 166 176 201 226 212 185 197 86 191 178 208
23 110 0 0 0 0 218 174 154 189 223 229 214 192 192 189 183 195 224
24 219 211 207 207 212 241 180 163 184 200 185 166 167 186 192 0 191 203
25 229 223 217 203 203 162 162 0 83 90 140 79 100 185 174 0 164 190
26 0 206 203 203 205 225 166 170 191 218 227 211 106 201 204 200 188 207
27 220 209 211 211 219 226 181 166 190 211 197 0 58 200 200 200 174 208
28 226 220 221 213 226 244 179 160 0 0 0 0 0 0 0 0 230 296
29 0 114 106 206 215 237 206 164 174 207 190 189 170 196 192 186 190 210
30 224 225 209 209 219 242 92 0 0 0 0 0 0 0 0 0 0 261
31 229 224 205 213 207 0 0 0 0 0 0 0 0 0 0 0 234 270
Prepared by:

SALI A. DIMAN
Plant Head - Sibutu Dpp
1900H 2000H 2100H 2200H 2300H 2400H Remarks (Outages)
314 288 276 272 246 222 Plant Maint Shutdown
320 302 290 284 252 237 Plant Maint Shutdown
281 281 288 255 244 227 Plant Maint Shutdown
210 198 282 256 233 218 Plant Maint Shutdown
310 291 295 274 237 213 E.C. line fault/Plant Main Shutdown
270 266 257 238 221 221 Plant Maint Shutdown
309 295 298 242 220 205 Plant Maint Shutdown
243 227 231 212 201 188 Plant Maint Shutdown
266 255 257 247 214 192 Plant Maint Shutdown
323 293 296 265 246 224 Plant Maint Shutdown
277 267 247 244 266 250 Plant Maint Shutdown
295 281 274 272 245 217 Plant Maint Shutdown
330 308 324 300 273 258 Plant Maint Shutdown
298 287 281 280 252 204 Plant Maint Shutdown
294 245 191 225 206 184 Plant Maint Shutdown
293 298 295 271 247 232 Plant Maint Shutdown
299 335 319 310 280 236 Test run unit no. 1
357 325 315 304 277 232 Plant Maint Shutdown
348 350 321 299 291 250 E.C. line fault/Plant Main Shutdown
327 326 249 254 0 0 E.C. line fault/Plant Main Shutdown
330 296 318 291 268 199 Cont. Power Interruption due to non availability of line man/plant main shutdown
277 280 277 265 247 233
213 219 228 216 240 224 E.C. line fault
301 278 287 278 241 229 E.C. line fault
288 288 281 259 236 230 E.C. line fault
296 285 290 265 245 242 E.C. line fault
269 271 281 279 242 231 E.C. line fault
323 303 296 279 247 234 Substation Maint. And other works requested by contractor
202 283 285 270 235 227 E.C. line fault
266 0 130 0 274 269 MMTS conduct transformer insulation and other test at substation
122 315 322 276 263 160 E.C. line fault, plant maintenanace shutdown
474.747475 0.29929078
252.124646 0.29831461

0.33

0.32

0.31
f(x) = 1.73982575079364E-06 x² − 0.0015
R² = 0.455524996190527

0.3

0.29

0.28

0.27

0.26

0.25
250 300 350
Unit 5 data

306.766917 0.29901961
308.77193 0.31036932
Romblon DPP Unit 5 - Cummins
317.663818 0.31838565
Scatter Data
319.86532 0.29491228
322.83237 0.31199642
323.680241 0.28984157
329.169231 0.30921668
338.375 0.30845955
342.09622 0.29558011
344.88189 0.27625571
368.024133 0.28913934
982575079364E-06 x² − 0.00153534168632 x + 0.616622641239356
524996190527408.383234 0.27859238
505.454545 0.28543165

350 400 450 500


y = 2E-06x2 - 0.0015x + 0.6166 U1
y = 2E-06x2 - 0.0035x + 0.7 U2 U1
U2
U3
Load
300

500 550
Rated Dep Cap Max Cap
600 500 300 y = 2E-06x2 - 0.0015x + 0.6166 0.3
2
300 250 200 y = 2E-06x - 0.003 + 0.7 0.29
2
150 100 80 y = 2E-06x - 0.022x + 0.5
Peak Load per month

2020
July August
310 280 90%

2021
July August
290 261.935484