0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! - Under Maintenance
2 3.75 104 125 0 390 389 0.3205 0.3283 0.3181
3 2.9 0 82 0 242 241 0.3388 0.3471 0.3199
4 6.5 0 185 0 583 569 0.3173 0.3251 0.3040
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 3.13 105 105 0 330 329 0.3182 0.3223 0.3237
3 3.30 0 82 0 254 253 0.3228 0.3270 0.3202
4 5.72 0 215 0 676 660 0.3180 0.3221 0.3358
1 Shift
st
ASJ/MSI
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 6.50 114 235 0 740 738 0.3176 0.3223 #DIV/0!
3 0.00 0 0 0 0 0 #DIV/0! #DIV/0! 0.3259 Economic Shutdown
4 6.50 0 250 0 754 739 0.3316 0.3365 0.3373
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 6.5 109.23 232 0 710 708 0.3268 0.3312 0.3368
3 0 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! 0.3187 Economic Shutdown
4 6.5 109.69 235 0 713 698 0.3296 0.3341 0.3184
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Under Maintenance
2 2.03 103 67 0 210 208 0.3190 0.3302 0.3372
3 0.00 #DIV/0! 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! Economic Shutdown
4 2.03 130.54 89 0 265 249 0.3358 0.3476 0.3385
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 6.5 104.62 217 0.0 680 678.289 0.3191176 0.3199226 0.3349
3 0 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! 0.3168
4 6.5 109.38 228 0.0 711 696.17685 0.3206751 0.327503 0.3360
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 0.00 #DIV/0! 0 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! Economic Shutdown
3 7 83 175 0.0 539 537 0.3247 0.3294 0.3295
4 6.50 109.38 238 0.0 711 695 0.3347 0.3396 0.3214
Total
0000H-0800H
Plant: SIBUTU DIESEL POWER PLANT Operating schedule: 0800H-1600H
Target NFR: 0.3152 CY 2021 TARGET 1600H-2400H
Shift In- Unit Operating Ave. Fuel Consumption, Li. Generation (kWh) Fuel Rate (Li./kWh) Previous Day Reasons for Increase/ Decrease in Ctrl. Optr. On
SIGNATURE
Charge No. Hours Load w/ gen w/o gen Gross Net Gross Net NFR Fuel Rate Duty
1 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! #DIV/0! Undermaintenance
2 6.50 103 210 670 668 0.3134 0.3178 0.3201
3 0.00 #DIV/0! 0 0 0 #DIV/0! #DIV/0! 0.3245 Economic Shutdown
4 6.50 107.85 225 701 686 0.3210 0.3255 0.3205
1st Shift RSE/ASS
Total
1 163 130 125 0.3145 0.3181 103 102 1/17/1997 42023.56 DALE-PERKINS 2006-TGI DALE Yes
2 163 130 125 0.3145 0.3181 98 106 7/1/1998 37108.57 DALE-PERKINS 2006-TGI DALE Yes
3 160 130 125 0.3144 0.3199 65 63 10/12/2011 15335.78 F.G.WILSON 6CTA8.3-G2 ZHONGQUI-PAI Yes
4 300 150 140 0.3128 0.3040 68 66 3/4/2010 12775.50 STAMFORD MTAA11-G3 ZHONGQUI-PAI Yes
NATIONAL POWER CORPORATION
Small Power Utilities Group
Western Mindanao Operations Division
Date 0100H 0200H 0300H 0400H 0500H 0600H 0700H 0800H 0900H 1000H 1100H 1200H 1300H 1400H 1500H 1600H 1700H 1800H
1 184 177 177 179 195 221 0 0 188 250 230 209 195 0 0 192 204 253
2 187 206 199 189 194 222 172 0 220 271 244 223 211 0 0 202 214 212
3 227 221 217 212 215 274 0 0 169 224 230 220 190 0 0 170 194 249
4 221 211 206 201 217 243 0 0 164 271 239 182 167 0 0 168 174 214
5 106 0 0 0 0 0 0 0 210 243 263 221 103 0 0 93 203 216
6 214 199 210 210 233 171 0 0 220 250 0 0 161 0 0 187 208 245
7 197 189 186 181 205 201 155 0 181 266 249 263 199 0 0 196 202 221
8 186 203 198 200 212 248 179 0 214 228 200 166 183 100 98 159 190 200
9 179 180 173 172 171 218 176 0 214 254 241 212 183 0 0 191 182 212
10 189 181 177 182 183 214 164 0 199 241 230 225 203 121 126 193 205 206
11 108 204 202 200 204 235 182 0 199 282 281 267 91 0 0 0 203 257
12 230 217 207 207 202 250 176 0 113 145 274 244 229 216 212 203 203 221
13 206 205 195 193 208 229 0 0 197 0 0 258 252 244 230 216 205 216
14 198 224 220 223 224 275 0 0 0 240 296 232 113 96 93 0 182 230
15 220 208 204 193 199 234 0 0 158 241 180 163 152 0 0 180 0 100
16 181 174 173 171 184 229 0 0 200 232 236 205 90 0 176 207 188 226
17 113 215 213 210 211 242 203 0 0 0 171 150 145 140 143 100 0 0
18 232 222 212 212 222 261 0 0 180 245 258 221 208 118 0 118 105 129
19 233 223 230 195 0 0 0 0 260 306 280 246 217 0 0 0 226 302
20 218 209 206 204 218 245 188 0 0 0 207 210 0 200 0 0 0 258
21 0 0 0 0 0 0 0 343 242 259 248 221 212 0 0 165 203 240
22 112 237 224 219 220 252 200 166 176 201 226 212 185 197 86 191 178 208
23 110 0 0 0 0 218 174 154 189 223 229 214 192 192 189 183 195 224
24 219 211 207 207 212 241 180 163 184 200 185 166 167 186 192 0 191 203
25 229 223 217 203 203 162 162 0 83 90 140 79 100 185 174 0 164 190
26 0 206 203 203 205 225 166 170 191 218 227 211 106 201 204 200 188 207
27 220 209 211 211 219 226 181 166 190 211 197 0 58 200 200 200 174 208
28 226 220 221 213 226 244 179 160 0 0 0 0 0 0 0 0 230 296
29 0 114 106 206 215 237 206 164 174 207 190 189 170 196 192 186 190 210
30 224 225 209 209 219 242 92 0 0 0 0 0 0 0 0 0 0 261
31 229 224 205 213 207 0 0 0 0 0 0 0 0 0 0 0 234 270
Prepared by:
SALI A. DIMAN
Plant Head - Sibutu Dpp
1900H 2000H 2100H 2200H 2300H 2400H Remarks (Outages)
314 288 276 272 246 222 Plant Maint Shutdown
320 302 290 284 252 237 Plant Maint Shutdown
281 281 288 255 244 227 Plant Maint Shutdown
210 198 282 256 233 218 Plant Maint Shutdown
310 291 295 274 237 213 E.C. line fault/Plant Main Shutdown
270 266 257 238 221 221 Plant Maint Shutdown
309 295 298 242 220 205 Plant Maint Shutdown
243 227 231 212 201 188 Plant Maint Shutdown
266 255 257 247 214 192 Plant Maint Shutdown
323 293 296 265 246 224 Plant Maint Shutdown
277 267 247 244 266 250 Plant Maint Shutdown
295 281 274 272 245 217 Plant Maint Shutdown
330 308 324 300 273 258 Plant Maint Shutdown
298 287 281 280 252 204 Plant Maint Shutdown
294 245 191 225 206 184 Plant Maint Shutdown
293 298 295 271 247 232 Plant Maint Shutdown
299 335 319 310 280 236 Test run unit no. 1
357 325 315 304 277 232 Plant Maint Shutdown
348 350 321 299 291 250 E.C. line fault/Plant Main Shutdown
327 326 249 254 0 0 E.C. line fault/Plant Main Shutdown
330 296 318 291 268 199 Cont. Power Interruption due to non availability of line man/plant main shutdown
277 280 277 265 247 233
213 219 228 216 240 224 E.C. line fault
301 278 287 278 241 229 E.C. line fault
288 288 281 259 236 230 E.C. line fault
296 285 290 265 245 242 E.C. line fault
269 271 281 279 242 231 E.C. line fault
323 303 296 279 247 234 Substation Maint. And other works requested by contractor
202 283 285 270 235 227 E.C. line fault
266 0 130 0 274 269 MMTS conduct transformer insulation and other test at substation
122 315 322 276 263 160 E.C. line fault, plant maintenanace shutdown
474.747475 0.29929078
252.124646 0.29831461
0.33
0.32
0.31
f(x) = 1.73982575079364E-06 x² − 0.0015
R² = 0.455524996190527
0.3
0.29
0.28
0.27
0.26
0.25
250 300 350
Unit 5 data
306.766917 0.29901961
308.77193 0.31036932
Romblon DPP Unit 5 - Cummins
317.663818 0.31838565
Scatter Data
319.86532 0.29491228
322.83237 0.31199642
323.680241 0.28984157
329.169231 0.30921668
338.375 0.30845955
342.09622 0.29558011
344.88189 0.27625571
368.024133 0.28913934
982575079364E-06 x² − 0.00153534168632 x + 0.616622641239356
524996190527408.383234 0.27859238
505.454545 0.28543165
500 550
Rated Dep Cap Max Cap
600 500 300 y = 2E-06x2 - 0.0015x + 0.6166 0.3
2
300 250 200 y = 2E-06x - 0.003 + 0.7 0.29
2
150 100 80 y = 2E-06x - 0.022x + 0.5
Peak Load per month
2020
July August
310 280 90%
2021
July August
290 261.935484