You are on page 1of 1

SAP U & E Monthly Safety Inspection Checklist (Manual Lifting Devices)

SUBCONTRACTOR: SCIF Equipment Name: Date: 01-11-2022


Responsible Person: KHALID ELOUARRADI Equipment Serial No: Date Till: 30-11-2022
3rd Party Certificate Detail: Certificate Issued Date: Valid Till:

Date
Item Inspection Point
OK N OK N/A

1 Identification
2 Maximum Load Identification
3 Pulley supports
4 Pulley rail conditions
5 Corrosion, damages, deformations
6 Monthly Color Code
7 General Aspect
8 Welds conditions & Cracks
9 Tabs without deformation
10 Diameter Damaged Under 10%
11 Elongation Under 5%
12 Master Link’s label every 2 m.
13 Broken Wires Under 15 %
14 Loops Conditions
15

Remarks

Responsible KHALID Safety ECHATIBI MORAD Competent


Name and ELOUARRADI Officer * Person**
Signature Name and Name and
Signature Signature

You might also like