Professional Documents
Culture Documents
This Certificate complies with the requirements of the Lifting Operations & Lifting Equipment Regulations 1998
DG-127
DG-128 Bulldog Clip
DG-129 5 N/A N/A
DG-130 Rope size: 1-1/4"
DG-131
Date of last thorough examination: Unknown Date of next thorough examination: 18-Aug-2023
1) Is this the first examination after installation or assembly at a new site or location? Yes☐ No☒
2) Is the examination carried after any exceptional circumstance/alteration? Yes☐ No☒
3) Identification of any part found to have a defect which is or could become a danger to persons
Yes☐ No☒
and a description of the defect
4) Is the above defect of any danger immediately or at any date (specify)? Yes☐ No☒
5) Particulars of renewal/repair/rectification/replacement required to remedy the above affect Yes☐ No☒
6) Is the examination carried out within an interval of 6 months/12 months? 6 months 12 months☐
The equipment tested and examined in accordance with the standards ASME / ANSI / BS EN / API / LOLER and at the time of inspection, herein were found to
be free from cracks or damages or flaws or any other defects which could become a danger to person. This Equipment is 'SAFE TO USE' at the time of
Inspection. This inspection certificate shall not be reproduced in part / in full without approval of Inspection body.
Name & position of the person who carried Mohamed Yasir Name of the Person Jayachandran Nair
out the Test and Thorough Examination Lifting Inspector Authenticating this Certificate Technical Manager
Signature: Signature:
CERTIFICATE OF THOROUGH EXAMINATION
This Certificate complies with the requirements of the Lifting Operations & Lifting Equipment Regulations 1998
Bulldog Clip
DG-132 1 N/A N/A
Rope size: 1-1/4"
Date of last thorough examination: Unknown Date of next thorough examination: 18-Aug-2023
7) Is this the first examination after installation or assembly at a new site or location? Yes☐ No☒
8) Is the examination carried after any exceptional circumstance/alteration? Yes☐ No☒
9) Identification of any part found to have a defect which is or could become a danger to persons
Yes☐ No☒
and a description of the defect
10) Is the above defect of any danger immediately or at any date (specify)? Yes☐ No☒
11) Particulars of renewal/repair/rectification/replacement required to remedy the above affect Yes☐ No☒
12) Is the examination carried out within an interval of 6 months/12 months? 6 months 12 months☐
The equipment tested and examined in accordance with the standards ASME / ANSI / BS EN / API / LOLER and at the time of inspection, herein were found to
be free from cracks or damages or flaws or any other defects which could become a danger to person. This Equipment is 'SAFE TO USE' at the time of
Inspection. This inspection certificate shall not be reproduced in part / in full without approval of Inspection body.
Name & position of the person who carried Mohamed Yasir Name of the Person Jayachandran Nair
out the Test and Thorough Examination Lifting Inspector Authenticating this Certificate Technical Manager
Signature: Signature:
CERTIFICATE OF THOROUGH EXAMINATION
This Certificate complies with the requirements of the Lifting Operations & Lifting Equipment Regulations 1998
Date of last thorough examination: Unknown Date of next thorough examination: 18-Aug-2023
13) Is this the first examination after installation or assembly at a new site or location? Yes☐ No☒
14) Is the examination carried after any exceptional circumstance/alteration? Yes☐ No☒
15) Identification of any part found to have a defect which is or could become a danger to persons
Yes☐ No☒
and a description of the defect
16) Is the above defect of any danger immediately or at any date (specify)? Yes☐ No☒
17) Particulars of renewal/repair/rectification/replacement required to remedy the above affect Yes☐ No☒
18) Is the examination carried out within an interval of 6 months/12 months? 6 months 12 months☐
The equipment tested and examined in accordance with the standards ASME / ANSI / BS EN / API / LOLER and at the time of inspection, herein were found to
be free from cracks or damages or flaws or any other defects which could become a danger to person. This Equipment is 'SAFE TO USE' at the time of
Inspection. This inspection certificate shall not be reproduced in part / in full without approval of Inspection body.
Name & position of the person who carried Mohamed Yasir Name of the Person Jayachandran Nair
out the Test and Thorough Examination Lifting Inspector Authenticating this Certificate Technical Manager
Signature: Signature: