Name and address of employer of persons making and reviewing this report:
AlMansoori Inspection Services ,P.O.Box: 3599 ,Al Khobar 31952 ,KSA, Email:mis@almansoori.biz, Web: www.almansoori.biz
This certificate is granted subject to the condition that is understood and agreed that nothing herein contained shall be deemed to relieve any designer,
manufacturer, seller, repairer or operator of any warranty, expressed or implied and AlMansoori liability shall be limited to the willful negligence or deliberate
omissions of its employees. Under no circumstances whatsoever, shall AlMansoori be liable for any injury or damage to any person occurring by reason of
negligent operation or any defect in materials, machinery, equipment or other items other than those defects ascertainable by normally accepted testing standards
and only those items actually inspected by AlMansoori and which are covered by this certificate.
F. 836
Rev. 03
28.11.2018
ALMANSOORI INSPECTION SERVICES
PNEUMATIC POWER OPERATED WINCHES CHECKLIST
Identification No : MW030538 Report Number : 5010051897-WH-001 Date of Inspection : 20-Mar-2022
Client name : ADVANCED ENERGY CL No : 38 WI No : 43
SYSTEMS
Inspection shall be compliance with ASME B 30.7 and Aramco SWIM and General Safety features
SR# Inspection check points Status Remarks
Certification information
1. Proof load test certificate Yes
2. Recent periodic inspection record condition of the winch. Yes
3. Last thorough visual examination & NDT report Yes
4. Declaration of conformity Yes
5. Other (specify)
Physical markings
6. Winch rating Yes
7. Drum size consisting of barrel diameter, barrel length, and flange diameter Yes
8. Rope diameter(s) Yes
9. Rope speed in feet per minute (mtr/sec) at rated load on specified layer Yes
10. Power requirement Yes
Aramco SWIM design requirement
11. Hoist operating lever which will come neutral from any operating position Yes
12. Air hoist is equipped with a quick action air supply isolation valve Yes
13. SWL on hoisting lines, slings, and fittings not exceeding SWL recommended by OEM Yes
Air hoist cable not terminated with "Flemish Eye,” "Farmer's Eye,” or "Rig Operator's Standby,” Yes
14.
or any other knot.
15. Air hoist cable not entangled with the derrick structure attachments and the TDS System Yes
16. Provision of brake. Yes
17. A clutch capable of disengaging the drum shall not be fitted. Yes
18. Air hoists equipped with line guards/guides. Yes
19. The hoist shall be fitted with an emergency stop device. Yes
20. Specific written instructions Yes
21. Welded name on winches frames “Air hoist” Yes
Inspection & test
22. Control mechanisms for proper operation OK
23. Limit devices for proper operation OK
24. Deterioration or leakage in air or hydraulic systems OK
25. Ropes for excessive wear, damage, or distortion (Refer ASME 30.7 Sec 7-2.4.2) OK
26. Ropes shall be away from mast structure OK
27. Rope end securement and fittings at the working end OK
28. Indication of loose, damaged, or missing structural components OK
29. Indication of loose, damaged, or missing supports and anchorages OK
30. Any additional items specified by the manufacturer OK
31. Any adjustments and repairs by unauthorized person N/A
32. Replacement parts from different manufacturers N/A
33. Control and drive mechanisms for improper adjustment N/A
34. Control and drive mechanisms for excessive wear N/A
35. Tubing, piping, electrical cables, or hoses and their fittings for damage N/A
36. Fluids for adequate condition and supply N/A
37. Gearboxes and lubrication systems for oil level N/A
38. Gearboxes and lubrication systems for clogged filters N/A
39. Hydraulic oil reservoir for proper level(s) N/A
Operational Tests in no load conditions
40. Drum rotation , Clutches, brakes, and pawls, Limit devices and all other aids OK
Load test
41. Minimum of five wraps of rope on the drum during the load test. N/A
42. The load shall be applied to the winch and held by the winch brake(s). N/A
43. Load test for 100% SWL (Periodic load test ) N/A
44. Proof test for 110-125% SWL (New, repaired or altered Winches) N/A
45. Photo of the load cell with reading (if load test conducted) N/A
Comments & Observations (that could become a potential hazard and/or danger to personnel)
Signature:
Name and address of employer of persons making and reviewing this report:
AlMansoori Inspection Services ,P.O.Box: 3599 ,Al Khobar 31952 ,KSA, Email:mis@almansoori.biz, Web: www.almansoori.biz
This certificate is granted subject to the condition that is understood and agreed that nothing herein contained shall be deemed to relieve any designer,
manufacturer, seller, repairer or operator of any warranty, expressed or implied and AlMansoori liability shall be limited to the willful negligence or deliberate
omissions of its employees. Under no circumstances whatsoever, shall AlMansoori be liable for any injury or damage to any person occurring by reason of
negligent operation or any defect in materials, machinery, equipment or other items other than those defects ascertainable by normally accepted testing standards
and only those items actually inspected by AlMansoori and which are covered by this certificate.
F. 836
Rev. 03
28.11.2018
ALMANSOORI INSPECTION SERVICES
PNEUMATIC POWER OPERATED WINCHES CHECKLIST
Identification No : A022559 Report Number : 5010051897-WH-002 Date of Inspection : 20-Mar-2022
Client name : ADVANCED ENERGY CL No : 38 WI No : 43
SYSTEMS
Inspection shall be compliance with ASME B 30.7 and Aramco SWIM and General Safety features
SR# Inspection check points Status Remarks
Certification information
1. Proof load test certificate Yes
2. Recent periodic inspection record condition of the winch. Yes
3. Last thorough visual examination & NDT report Yes
4. Declaration of conformity Yes
5. Other (specify)
Physical markings
6. Winch rating Yes
7. Drum size consisting of barrel diameter, barrel length, and flange diameter Yes
8. Rope diameter(s) Yes
9. Rope speed in feet per minute (mtr/sec) at rated load on specified layer Yes
10. Power requirement Yes
Aramco SWIM design requirement
11. Hoist operating lever which will come neutral from any operating position Yes
12. Air hoist is equipped with a quick action air supply isolation valve Yes
13. SWL on hoisting lines, slings, and fittings not exceeding SWL recommended by OEM Yes
Air hoist cable not terminated with "Flemish Eye,” "Farmer's Eye,” or "Rig Operator's Standby,” Yes
14.
or any other knot.
15. Air hoist cable not entangled with the derrick structure attachments and the TDS System Yes
16. Provision of brake. Yes
17. A clutch capable of disengaging the drum shall not be fitted. Yes
18. Air hoists equipped with line guards/guides. Yes
19. The hoist shall be fitted with an emergency stop device. Yes
20. Specific written instructions Yes
21. Welded name on winches frames “Air hoist” Yes
Inspection & test
22. Control mechanisms for proper operation OK
23. Limit devices for proper operation OK
24. Deterioration or leakage in air or hydraulic systems OK
25. Ropes for excessive wear, damage, or distortion (Refer ASME 30.7 Sec 7-2.4.2) OK
26. Ropes shall be away from mast structure OK
27. Rope end securement and fittings at the working end OK
28. Indication of loose, damaged, or missing structural components OK
29. Indication of loose, damaged, or missing supports and anchorages OK
30. Any additional items specified by the manufacturer OK
31. Any adjustments and repairs by unauthorized person N/A
32. Replacement parts from different manufacturers N/A
33. Control and drive mechanisms for improper adjustment N/A
34. Control and drive mechanisms for excessive wear N/A
35. Tubing, piping, electrical cables, or hoses and their fittings for damage N/A
36. Fluids for adequate condition and supply N/A
37. Gearboxes and lubrication systems for oil level N/A
38. Gearboxes and lubrication systems for clogged filters N/A
39. Hydraulic oil reservoir for proper level(s) N/A
Operational Tests in no load conditions
40. Drum rotation , Clutches, brakes, and pawls, Limit devices and all other aids OK
Load test
41. Minimum of five wraps of rope on the drum during the load test. N/A
42. The load shall be applied to the winch and held by the winch brake(s). N/A
43. Load test for 100% SWL (Periodic load test ) N/A
44. Proof test for 110-125% SWL (New, repaired or altered Winches) N/A
45. Photo of the load cell with reading (if load test conducted) N/A
Comments & Observations (that could become a potential hazard and/or danger to personnel)
Signature:
Name and address of employer of persons making and reviewing this report:
AlMansoori Inspection Services ,P.O.Box: 3599 ,Al Khobar 31952 ,KSA, Email:mis@almansoori.biz, Web: www.almansoori.biz
This certificate is granted subject to the condition that is understood and agreed that nothing herein contained shall be deemed to relieve any designer,
manufacturer, seller, repairer or operator of any warranty, expressed or implied and AlMansoori liability shall be limited to the willful negligence or deliberate
omissions of its employees. Under no circumstances whatsoever, shall AlMansoori be liable for any injury or damage to any person occurring by reason of
negligent operation or any defect in materials, machinery, equipment or other items other than those defects ascertainable by normally accepted testing standards
and only those items actually inspected by AlMansoori and which are covered by this certificate.
F. 836
Rev. 03
28.11.2018
ALMANSOORI INSPECTION SERVICES
PNEUMATIC POWER OPERATED WINCHES CHECKLIST
Identification No : BU 031795 Report Number : 5010051897-WH-003 Date of Inspection : 20-Mar-2022
Client name : ADVANCED ENERGY CL No : 38 WI No : 43
SYSTEMS
Inspection shall be compliance with ASME B 30.7 and Aramco SWIM and General Safety features
SR# Inspection check points Status Remarks
Certification information
1. Proof load test certificate Yes
2. Recent periodic inspection record condition of the winch. Yes
3. Last thorough visual examination & NDT report Yes
4. Declaration of conformity Yes
5. Other (specify)
Physical markings
6. Winch rating Yes
7. Drum size consisting of barrel diameter, barrel length, and flange diameter Yes
8. Rope diameter(s) Yes
9. Rope speed in feet per minute (mtr/sec) at rated load on specified layer Yes
10. Power requirement Yes
Aramco SWIM design requirement
11. Hoist operating lever which will come neutral from any operating position Yes
12. Air hoist is equipped with a quick action air supply isolation valve Yes
13. SWL on hoisting lines, slings, and fittings not exceeding SWL recommended by OEM Yes
Air hoist cable not terminated with "Flemish Eye,” "Farmer's Eye,” or "Rig Operator's Standby,” Yes
14.
or any other knot.
15. Air hoist cable not entangled with the derrick structure attachments and the TDS System Yes
16. Provision of brake. Yes
17. A clutch capable of disengaging the drum shall not be fitted. Yes
18. Air hoists equipped with line guards/guides. Yes
19. The hoist shall be fitted with an emergency stop device. Yes
20. Specific written instructions Yes
21. Welded name on winches frames “Air hoist” Yes
Inspection & test
22. Control mechanisms for proper operation OK
23. Limit devices for proper operation OK
24. Deterioration or leakage in air or hydraulic systems OK
25. Ropes for excessive wear, damage, or distortion (Refer ASME 30.7 Sec 7-2.4.2) OK
26. Ropes shall be away from mast structure OK
27. Rope end securement and fittings at the working end OK
28. Indication of loose, damaged, or missing structural components OK
29. Indication of loose, damaged, or missing supports and anchorages OK
30. Any additional items specified by the manufacturer OK
31. Any adjustments and repairs by unauthorized person N/A
32. Replacement parts from different manufacturers N/A
33. Control and drive mechanisms for improper adjustment N/A
34. Control and drive mechanisms for excessive wear N/A
35. Tubing, piping, electrical cables, or hoses and their fittings for damage N/A
36. Fluids for adequate condition and supply N/A
37. Gearboxes and lubrication systems for oil level N/A
38. Gearboxes and lubrication systems for clogged filters N/A
39. Hydraulic oil reservoir for proper level(s) N/A
Operational Tests in no load conditions
40. Drum rotation , Clutches, brakes, and pawls, Limit devices and all other aids OK
Load test
41. Minimum of five wraps of rope on the drum during the load test. N/A
42. The load shall be applied to the winch and held by the winch brake(s). N/A
43. Load test for 100% SWL (Periodic load test ) N/A
44. Proof test for 110-125% SWL (New, repaired or altered Winches) N/A
45. Photo of the load cell with reading (if load test conducted) N/A
Comments & Observations (that could become a potential hazard and/or danger to personnel)
Signature:
Name and address of employer of persons making and reviewing this report:
AlMansoori Inspection Services ,P.O.Box: 3599 ,Al Khobar 31952 ,KSA, Email:mis@almansoori.biz, Web: www.almansoori.biz
This certificate is granted subject to the condition that is understood and agreed that nothing herein contained shall be deemed to relieve any designer,
manufacturer, seller, repairer or operator of any warranty, expressed or implied and AlMansoori liability shall be limited to the willful negligence or deliberate
omissions of its employees. Under no circumstances whatsoever, shall AlMansoori be liable for any injury or damage to any person occurring by reason of
negligent operation or any defect in materials, machinery, equipment or other items other than those defects ascertainable by normally accepted testing standards
and only those items actually inspected by AlMansoori and which are covered by this certificate.
F. 836
Rev. 03
28.11.2018
ALMANSOORI INSPECTION SERVICES
PNEUMATIC POWER OPERATED WINCHES CHECKLIST
Identification No : 12-2882-00001 Report Number : 5010051897-WH-006 Date of Inspection : 20-Mar-2022
Client name : ADVANCED ENERGY CL No : 38 WI No : 43
SYSTEMS
Inspection shall be compliance with ASME B 30.7 and Aramco SWIM and General Safety features
SR# Inspection check points Status Remarks
Certification information
1. Proof load test certificate Yes
2. Recent periodic inspection record condition of the winch. Yes
3. Last thorough visual examination & NDT report Yes
4. Declaration of conformity Yes
5. Other (specify)
Physical markings
6. Winch rating Yes
7. Drum size consisting of barrel diameter, barrel length, and flange diameter Yes
8. Rope diameter(s) Yes
9. Rope speed in feet per minute (mtr/sec) at rated load on specified layer Yes
10. Power requirement Yes
Aramco SWIM design requirement
11. Hoist operating lever which will come neutral from any operating position Yes
12. Air hoist is equipped with a quick action air supply isolation valve Yes
13. SWL on hoisting lines, slings, and fittings not exceeding SWL recommended by OEM Yes
Air hoist cable not terminated with "Flemish Eye,” "Farmer's Eye,” or "Rig Operator's Standby,” Yes
14.
or any other knot.
15. Air hoist cable not entangled with the derrick structure attachments and the TDS System Yes
16. Provision of brake. Yes
17. A clutch capable of disengaging the drum shall not be fitted. Yes
18. Air hoists equipped with line guards/guides. Yes
19. The hoist shall be fitted with an emergency stop device. Yes
20. Specific written instructions Yes
21. Welded name on winches frames “Air hoist” Yes
Inspection & test
22. Control mechanisms for proper operation OK
23. Limit devices for proper operation OK
24. Deterioration or leakage in air or hydraulic systems OK
25. Ropes for excessive wear, damage, or distortion (Refer ASME 30.7 Sec 7-2.4.2) OK
26. Ropes shall be away from mast structure OK
27. Rope end securement and fittings at the working end OK
28. Indication of loose, damaged, or missing structural components OK
29. Indication of loose, damaged, or missing supports and anchorages OK
30. Any additional items specified by the manufacturer OK
31. Any adjustments and repairs by unauthorized person N/A
32. Replacement parts from different manufacturers N/A
33. Control and drive mechanisms for improper adjustment N/A
34. Control and drive mechanisms for excessive wear N/A
35. Tubing, piping, electrical cables, or hoses and their fittings for damage N/A
36. Fluids for adequate condition and supply N/A
37. Gearboxes and lubrication systems for oil level N/A
38. Gearboxes and lubrication systems for clogged filters N/A
39. Hydraulic oil reservoir for proper level(s) N/A
Operational Tests in no load conditions
40. Drum rotation , Clutches, brakes, and pawls, Limit devices and all other aids OK
Load test
41. Minimum of five wraps of rope on the drum during the load test. N/A
42. The load shall be applied to the winch and held by the winch brake(s). N/A
43. Load test for 100% SWL (Periodic load test ) N/A
44. Proof test for 110-125% SWL (New, repaired or altered Winches) N/A
45. Photo of the load cell with reading (if load test conducted) N/A
Comments & Observations (that could become a potential hazard and/or danger to personnel)
Signature:
Name and address of employer of persons making and reviewing this report:
AlMansoori Inspection Services ,P.O.Box: 3599 ,Al Khobar 31952 ,KSA, Email:mis@almansoori.biz, Web: www.almansoori.biz
This certificate is granted subject to the condition that is understood and agreed that nothing herein contained shall be deemed to relieve any designer,
manufacturer, seller, repairer or operator of any warranty, expressed or implied and AlMansoori liability shall be limited to the willful negligence or deliberate
omissions of its employees. Under no circumstances whatsoever, shall AlMansoori be liable for any injury or damage to any person occurring by reason of
negligent operation or any defect in materials, machinery, equipment or other items other than those defects ascertainable by normally accepted testing standards
and only those items actually inspected by AlMansoori and which are covered by this certificate.
F. 836
Rev. 03
28.11.2018
ALMANSOORI INSPECTION SERVICES
PNEUMATIC POWER OPERATED WINCHES CHECKLIST
Identification No : 12-2882-00002 Report Number : 5010051897-WH-007 Date of Inspection : 20-Mar-2022
Client name : ADVANCED ENERGY CL No : 38 WI No : 43
SYSTEMS
Inspection shall be compliance with ASME B 30.7 and Aramco SWIM and General Safety features
SR# Inspection check points Status Remarks
Certification information
1. Proof load test certificate Yes
2. Recent periodic inspection record condition of the winch. Yes
3. Last thorough visual examination & NDT report Yes
4. Declaration of conformity Yes
5. Other (specify)
Physical markings
6. Winch rating Yes
7. Drum size consisting of barrel diameter, barrel length, and flange diameter Yes
8. Rope diameter(s) Yes
9. Rope speed in feet per minute (mtr/sec) at rated load on specified layer Yes
10. Power requirement Yes
Aramco SWIM design requirement
11. Hoist operating lever which will come neutral from any operating position Yes
12. Air hoist is equipped with a quick action air supply isolation valve Yes
13. SWL on hoisting lines, slings, and fittings not exceeding SWL recommended by OEM Yes
Air hoist cable not terminated with "Flemish Eye,” "Farmer's Eye,” or "Rig Operator's Standby,” Yes
14.
or any other knot.
15. Air hoist cable not entangled with the derrick structure attachments and the TDS System Yes
16. Provision of brake. Yes
17. A clutch capable of disengaging the drum shall not be fitted. Yes
18. Air hoists equipped with line guards/guides. Yes
19. The hoist shall be fitted with an emergency stop device. Yes
20. Specific written instructions Yes
21. Welded name on winches frames “Air hoist” Yes
Inspection & test
22. Control mechanisms for proper operation OK
23. Limit devices for proper operation OK
24. Deterioration or leakage in air or hydraulic systems OK
25. Ropes for excessive wear, damage, or distortion (Refer ASME 30.7 Sec 7-2.4.2) OK
26. Ropes shall be away from mast structure OK
27. Rope end securement and fittings at the working end OK
28. Indication of loose, damaged, or missing structural components OK
29. Indication of loose, damaged, or missing supports and anchorages OK
30. Any additional items specified by the manufacturer OK
31. Any adjustments and repairs by unauthorized person N/A
32. Replacement parts from different manufacturers N/A
33. Control and drive mechanisms for improper adjustment N/A
34. Control and drive mechanisms for excessive wear N/A
35. Tubing, piping, electrical cables, or hoses and their fittings for damage N/A
36. Fluids for adequate condition and supply N/A
37. Gearboxes and lubrication systems for oil level N/A
38. Gearboxes and lubrication systems for clogged filters N/A
39. Hydraulic oil reservoir for proper level(s) N/A
Operational Tests in no load conditions
40. Drum rotation , Clutches, brakes, and pawls, Limit devices and all other aids OK
Load test
41. Minimum of five wraps of rope on the drum during the load test. N/A
42. The load shall be applied to the winch and held by the winch brake(s). N/A
43. Load test for 100% SWL (Periodic load test ) N/A
44. Proof test for 110-125% SWL (New, repaired or altered Winches) N/A
45. Photo of the load cell with reading (if load test conducted) N/A
Comments & Observations (that could become a potential hazard and/or danger to personnel)