Transportat 53 47918 C.docx (sc14 Transporta36852.00 34.00 98.

27586206896551
Fixing of r 100 783 C.docx () 0.0
Alteration 50 3583 C.docx () 0.0
Supply, Tra 50 12306 C.docx (sc29 Supply, tra10776.00 34.00 76.5570249719469
Excavation 5 88821 C.docx (sc19 Excavation67687.00 34.00 97.8601997146933
Excavation 5 71060 C.docx (sc20 Excavation54152.00 34.00 97.8601997146933
Laying of S 10 24389 C.docx (sc25 Laying of S18586.00 34.00 98.13084112149532
Excavation 300 713 C.docx (sc26 Excavation543.00 34.00 99.75550122249389
Excavation 250 335 C.docx (sc2 Excavation255.00 10.00 99.49748743718592
Cutting of 50 6108 C.docx (sc23 Cutting of 4655.00 34.00 99.08256880733946
Transportat 204 3570 C.docx (sc10 Transportat2744.00 34.00 100.0
Supply of p 50 13308 C.docx (sc16 Supply of p10722.00 34.00 88.83610451306413
Excavation 52 49789 C.docx (sc13 Excavation38291.00 34.00 91.98979719776123
Concreting 150 339 C.docx () 0.0
Dismantling 30 10461 C.docx () 0.0
Transportat 100 4071 C.docx () 0.0
Trenching a 200 533 C.docx (sc24 Trenching a406.00 34.00 99.66101694915255
Alteration 202 350 C.docx (sc5 Design of C27200.00 20.00 86.9969040247678
Excavating, 1000 323.9 C.docx () 0.0
Total of Sc 0 0 C.docx (schedule e) Total 34.00 81.90212373037858
0 0 0 C.docx () 0.0
Supply of S 53 244457 C.docx (sc31 Supply of S194963.0035.00 99.0
Supply
Supply of
of R
double 100 3953 C.docx
walled corrugated pipe(sc12 Supply
6 mtr in length, of R3827.92
120 mm 35.00
outer dia and 103 mm98.0327868852459
inner dia, with one suitable coupler co
50 4117 C.docx (sc28 Supply of d3243.00 35.00 97.58064516129032
Supply of P 200 1889 C.docx (sc7 Supply of P1515.00 34.00 89.00343642611683
Supply of E 200 11995 C.docx (sc18 Supply of E9486.00 35.00 99.16317991631799
Total of Sc 0 0 C.docx (schedule e) Total 34.00 81.90212373037858