Transportat 53 47918 B.docx (sc 28 Transportat36852.00 -25.00 99.

13793103448276
Fixing of r 100 783 B.docx (sc 34 Fixing of r 601.00 -25.00 100.0
Alteration 50 3583 B.docx (sc 8 Alteration 2754.00 -25.00 100.0
Supply, Tra 50 12306 B.docx (sc 9 Supply, tra10776.00 -25.00 76.5570249719469
Excavation 5 88821 B.docx (sc 13 Excavation67687.00 -25.00 97.8601997146933
Excavation 5 71060 B.docx (sc 35 Excavation54152.00 -25.00 97.8601997146933
Laying of S 10 24389 B.docx (sc 15 Laying of S18586.00 -25.00 98.13084112149532
Excavation 300 713 B.docx (sc 22 Excavation543.00 -25.00 100.0
Excavation 250 335 B.docx (sc 18 Excavation255.00 -25.00 99.37106918238993
Cutting of 50 6108 B.docx (sc 14 Cutting of 4655.00 -25.00 99.26739926739927
Transportat 204 3570 B.docx (sc 25 Transportat2744.00 -25.00 98.89380530973452
Supply of p 50 13308 B.docx (sc 4 Supply of p10722.00 -25.00 88.36104513064133
Excavation 52 49789 B.docx (sc 20 Excavation1640.00 -25.00 75.33748218721223
Concreting 150 339 B.docx () 0.0
Dismantling 30 10461 B.docx (sc 16 Dismantling8142.00 -25.00 100.0
Transportat 100 4071 B.docx () 0.0
Trenching a 200 533 B.docx () 0.0
Alteration 202 350 B.docx () 0.0
Excavating, 1000 323.9 B.docx () 0.0
Total of Sc 0 0 B.docx (schedule a) Total Rate 50.00 81.90212373037858
0 0 0 B.docx () 0.0
Supply of S 53 244457 B.docx (sc 32 Supply of S194963.000.00 99.25187032418953
Supply
Supply of
of R
double 100 3953 B.docx
walled corrugated pipe()6 mtr in length, 120 mm outer dia and 103 mm0.0
inner dia, with one suitable coupler co
50 4117 B.docx (sc 28 Supply of d3243.00 0.00 97.84946236559139
Supply of P 200 1889 B.docx (sc 11 Supply of P1515.00 0.00 100.0
Supply of E 200 11995 B.docx (sc 18 Supply of E9486.00 0.00 98.32635983263597
Total of Sc 0 0 B.docx (schedule a) Total Rate 50.00 81.90212373037858