You are on page 1of 16
Technical data HS885HD Hydraulic crawler crane Berens Basic machine with undercarria: 1 g +e g vt = 1400 = 2725 = h 5490 = L. 750 = 2100 = a. 559 moo = oT + 18200 | ‘The operating weight includes the basic machine with HD under- ccariage, 2 main winches 300 KN with speed change gear and 11m boom, cersisting of A-frame, boom foot (4m), boom head ‘ection (6.4m), boom head (0.6 m),24.1 t basic counterweight, 8.4 t ‘add. counterweight and 60 t hook block, Total weight ‘Ground bearing pressure 1.08 kalom? approx. 13.5 t Main boom mi. 155.59 max. length 56m Main boom with L-boom head wo. 11639) 4m Fixe jb po 208 tim-32m Universal boom head with interchangeable rope pulleys. Modular designes equipment for operation as crane, with dragine or clamshell For dragline operation, a rotating farlead i ited into the boom fect. This minimizes the rope angle to drum, which results in lower rope wear The liting capacities stated are valid fo iting operation only (corresponding with crane classification according to FEM. 001, crane group AT), Grane standing on fr, horizontal ground, ‘Tne weight ofthe liting device (hoisting ropes, hook block, ‘shackle etc) must be deducted from the gtoss iting capacity te obtain anetliting value ‘Additional equipment on boom (e.g. boom walkways, auxllary lib) must be deductes to get te net liting capacity For max. wind speed please refer to lift chart in operator's cab or manual, ‘Working rail are measured from center of swing and under load. ‘The liting capacities are valid for 260 degrees of swing. Calculation of stablity under load is based on ISO 4305 Table 1 +2, tipping angle ‘The structures are calculated according to FEM. 7.001 - 1998 (EN 13001-22004) 2 Hsesho Transport dimensions and weights (No. 1515.xx) 980 1960 4300. 1640 3170. 1640 6170 1640 12170 1630 6600. A 8 soo 1210 270 2820 ) Including pendant ropes Fu ) Including pendant ropes with HD undercariage, 2 x 300 kN winches with change gear box without counterweight, boom foot and A-frame 2-web grousers 4000 mm Width 4000 mm Weight 72000 kg, width {600 mm Weight 2420 kg Width 1950 mm Weight 2300 kg Width 1660 mm Weight? 770 kg Width 3660 mm Weight 1240 kg Width 660 mm Weight? 2180 kg Width 1660 mm Weight” 1310 kg Width 1850 mm Weight” 1800 kg 1) Steel sheaves 850 mm 1840 kg wit 3660 mm Weight? 1270 kg 2) Polyamide sheaves Hsesho 3 Transport dimensions and weights Fixed jib (No. 0806.xx) 6050. 2200 Batic counterweight ‘Add, counterweight i xfer st - 3200 ~ - 3200 _t wt coc a emer she UA) ate Heoks rhe tel ' 4 whe -2200-— t ) Including pendants wath 1140 mm Weight® 475 kg wath 950 mm Weight® 150 kg Weta 950 mm Weignt™ 255 ko wat 1500 mm Weight™ 1210 kg Width 820 mm Weight 19600 kg Width 670 mm Weight 4500 kg Width 840 mm Weight 2600 kg width 405 mm Weight 8200 kg wath 320 mm Weight 1400 kg wieth £200 mm Weight 970 kg wath 400 mm Weight 400 kg 4 Hecho Technical description - Power rating according to ISO 8248, 450 KW (603 hp) at 1800 rpm Engine type Liebherr 0 9508 A7 Fuel tank 980 I capacity witn continuous level — indicator and reserve warning Engine complies with NRMM exhaust certification EPA / CARB Tier and 97/68 EC Stage Il Option Power rating according to ISO 3046, 670 kW (898 hp) at 1900 rpm Engine type ———— MAN D 2842 LE Fuel tank 980 I capacity with continuous level indicator and reserve warning Engine complies with NRMM exhaust certification EPA / CARB Tier 2. LB strate gato The main pumps are operated by a distributor gearbox. Axial piston displacement pumps work in closed and open circuts supplying cil only when needed flow control on demand). To minimize peak pressure an automaticaly working pressure cutoff is integrated, ‘This spares pumps and saves energy. The hydraulic oil is cleaned through electronically controlled pressure and return fiters. Possible contamination is signaled In the cabin, The use of synthetic ‘environmentally friendly els is possible. Ready made hydraulic retrofit Kits are available to customize requirements e.g. powering casing coscilators, VM-vibrators, hyaraulle grabs, tied leaders et. Working pressure —— max. $50 bar Oiltank capacity —— 11701 Line pull ———— max. 2« 70 kN Rope diameter 20mm Boom up 4 sec. from 15° to 82° Consists of rollrbearing with external teeth for lower tooth flank pressure, fixed axial piston hydraulic moter, spring loaded and hydraulcaly released mult-disc holding brake, planetary gearbox and pinion. Swing speed from 0 ~ 8.5 rpm continuously variable, selector {or 3 speed ranges to increase swing precision. Standara! Second swing drive Noise emissions correspond with 2000/14/EC directive on noise ‘emission by equipment used outdoors. Mk Winch options: Lin pull rom. leach) — 200 kN —— 250 kN —— 300 kN Rope diameter 30 mm —— 34 mm —— 36 mm Drum diameter 630 mm —— 750 mm —— 820 mm Rope speed (0-86 m/min — 0-69 m/min — 0-55 m/min With change gear box. (0128 mimin ~ 0-198 m/min Rope capacity 1st layer - 40.5 m 38.9 m 386m The winches. are outstanding in their compact design and easy ‘assembly. Clutch and braking functions on the free-fall system are provides by a compact designed, low wear and maintenance-free mult-dise brake. The drag ana hoist winches use pressure controlled, variable flow hysraulic motors. This system features sensors that automaticaly adjust ol flow to provide max. winch speed depending fon oad, Option Crane winch (ae wires) —— 160 KN with mult-dise holding brake ‘Auxiliary winch TOKNin boom foot Tagline winch TORN with sre fall 30 kN with freefall Phere The track width of the undercarriage is changed hydraulcally Propulsion through axial piston motor, hydraulically released spring loaded mult-dise brake, maintenance-free crawler tracks, hydraulic ‘chain tensioning sevice 2-web grousers 3000 mm Drive speed 0-085 kmih Option + 2-speed hysraulic motor for higher travel speed (1.5 km/h) The control system - developed and manufactured by Liebherr ~ Is designed to withstand extreme temperature changes and the rough heavy duty tasks common in the construction inausty, Complete machine operating data ate shown on a high resolution sigplay. The ‘rane is equipped with proportional control forall movements, which ‘can be carried out simutaneoushy Dragline operation: A special “Interlock” control system is an option available. Itis designed for power liting of the dragiine bucket without using the drag winch brake, ‘On request, Liebherr also ofers special custom designed control systems for free-fall winches. (Operation: Leftjoy tick for boom winch and swing, right two directional levers fr winch and I, Crawler control's actuated with tne two central foot pedals, Adcitionaly, hand levers can be attached to the pedals. Options + Special demolition control system + MDE: Machine data recording + PDE: Process data recording + GSM modem Hsesho 5 Equipment (main boom No. 1515.xx and 32.5 t counterweight) Casing oscil and slurry wall grab Winch options ———— 2x 250 kN. 2300 KN, Line speed 1st gear (m/min) 0-69 0.55 Line speed 2nd gear rin) 0-128, ont Dring clameter ~~ 2500 mm 2000 mm *) Load chart for duty cycle operation see page 8 Winch options —————— 2 x 250 kN. 2300 KN, Line speed 1st gear (r/min) 0-69" 0-55 Line speed 2nd gear iin) 8 Max. chisel weight tet 25 6 Hsesho Equipment (main boom No. 1515.xx and 32.5 t counterweight) Dynamic soil compaction Radius | 21m | 28m | 27m | som | 33m cy t 1 t ‘ ‘ 2 30 20 25 5 20 ° 20 20 20 20 8 10 18 8 8 8 16 Max. eapacies in mettle tons do not exceed 759% of tipping load. Allloads glven are max. values and must not be exeeeded. They are ‘only permitted in two-rope automatic operation and are vald for work fon a surface with max. Inclination of 1%. Lifting nelghts must not ‘exceed 25m, Hsesho 7 Load chart for duty cycle operation (mainsoom No. 1515.) 32. t counterweight 5 462 5 6 462 462 462 483 ae | se7 a7 ata 283 6 7 462 456 45 426 402 | ea 347 aa 2a 7 8 a3 404 395, 388 373 | s49 327 309 28. 8 9 364 355 348 342 sas | a27 302 288 270 ° 10 323 317 a 303 zoe | 29 284 266 250 10 2 263 258 25.3 247 za | 237 229 2a 218 12 4 216 212 20.7 204 | 198 194 187 181 14 16 182 77 ws | 170 163 160 184 16 1" 187 163 asa | 147 142 sa7 134 8 20 133, 131 128 124 9 18 20 2 ne | 12 108 104 10.4 2 2 29 es 92 89 24 26 as 34 a4 78 28 28 73 7A 69 28 30 62 60 30 2 52. 54 2 34 43 34 1) Lifting a load exceeding the ine pull of one winch is only allowed ifitcanbe ensured snat each naividual winch is not overloaded, Line pul kw | 200] 250] 300 When working with a mechanical 2-rope grab the total oad tobe IitedisImited by the ine pull of ane winch, Rope diameter iim} 29) 34)| 36 Rigging and ropes are part ofthe load. Minimum breaking lose kw | 84s] 1046 | 1186 2). Max. capacities in mete tons do not exceed 75% of oping load Line pul -t-rope duty cycle operation + | 20] 25] 30 Crane standing on fm, horizontal ground. Line pull -2-rope duty eyele operation + |s03] s79| 46.2 Capacities in duty eyele operation are for reference only and are not programmed in the LMI system, Allloads and counterweight configurations are max. values and must not be exceeded. Weight of additional equipment on boom (e.g. walkways, hose drums etc) must be deducted to get the net capacity. 8 Hsesho Dragline equipment (main boom No. 1515.x.) 32.5 t counterweight Max. capacities in metric tons do not exceed 75% of tipping oad. Capacities in cuty cyele operation are for reference only and are not programmed in the LMI system. The size of the bucket has to be determined according te local conditions, dius / dumping radius Max. digging radius = approx. ce iatev2J-K Digaing depth = approx. 40-50% of Height to eentve rope ploy boom head K = Length of dragine bucket (according to manufacturer's specication) Clamshell equipment (mainboom No. 1515.x) 32.5 t counterweight Max. eapaetties in metric ons do not exceed 68.7% of tipping load. Capacities in uty cycle operation are for reference only and are not programmed inthe LMI system. C= Radius / dumping radius J Height of boom head sheave centre above ground level K = Length of clamshell depending con type and capacity of bucket) Working range - main boom 82° = 15° wo.1515.x 32.5 t counterweight a om & Tanya ss 10 2 160 | a8 “ 40 Tye marin capac tine char foe 3 t [it t 66 | 256 75 | 247 as | 26 1 | 20a | 119 un | 209 | 144 13 | 196 | 114 4 | a0 | 108 | 79 as | 11 | ize | 7a re | 1a2 J 105 | 73 wv | 167 | 97 | 67 | 46 18 | 172 | 120 | 67 | 45 12 | 159] 100 | 68 | 45 2 | ss] s1| es | a3 2 | 152 | 117 | 64 | 44 2 | 129] 96 | 65 | 43 2 | rae | ea | 61 | a2 2 |iaa |i | o2 | 42 2 | wo} 21 | 61 | 40 26 so | 57 | 39 2 | 104|r0s | s2 | 40 a | 79| a7 | se | ae 30 74 | 54 | 37 32 so | 54 | a7 se | 71 | 78 | 57 | 38 2 sa | 36 36 52 | 36 40 sa | sa | 35 36 51 | 35 2 so | a4 a 51 | 35 38 34 4 34 48 43 | 34 a 34 48 29 50 33. eo | 26 ro | aa s04 | 208 14 | 191 | 108 1s | 186 | 104 15 | 183 | 103 v7 | 180 | 101 | 68 18 | 163 | 99 | a7 18 | 161 | 98 | 67 20 | 144 | 97 | 66 | 44 2 |120| 95 | 6s | 43 2 | 8} es | 64 | 4a 2 | 125 | 25 | 64 | 43 2 | 91 | a1 | ez | 41 2 | as| ox | 62 | 41 2 | a6 | 91 | 61 | 41 so | 70} 79 | se | 40 so | ss| 77 | 59 | 40 30 75 | a3 | 59 | 39 Py s5| 63 | 57 | 38 ss | 52] 61 | 57 | a8 au | so | 67 | 56 | 38 at | 42| so | sa | a7 ae | 4o| 48 | 52 | a7 as | 53] 60 | 55 | a7 a2 | 32] 40 | 44 | 36 a | so] ss | 42 | 36 6 35 | 39 | 34 46 3a | 3s | 35 a | 26] 33 | 37 | 35 50 32 | 34 50 24 | 28 | 30 50 22 | 26 | 29 55 27 55 2a 5 2a tos | 200 1s | azz | 24 ne | 187 te | 177 | 102 re | 174 |i | 09 2 | 17 eo | as | o9 | 67 2 | isa fats | 9s v4 | ae 2 | 16 | 96 | 65 | 43 2 | ins |i | 9s te | aa 2 | 7 | es | 6s | aa 2 | a4] a1 | oa se | 148 20 | es | 75 | 60 | 40 a | 63 | 70 | 73 20 | 126 ss | so] so | se | se se | as | sa | 56 a | 9a ss | a8 | 46 | 50 | 37 se | as | 41 | 44 8 7 a | 28] a5 | 40 | a6 a | 25 | a1 | 33 a | sa a | 23] a1 | as | as a | 21 | 27 | 29 ss | 39 48 23 | 27 | 30 46 2a | 25 4 | 28 50 24 | 27 4 2a a | 23 capacities in metric tons with fixed jib (No. 0806.29), 92.5 t counterweight, Above load chart is for reference only. For actual ift duty and ‘complete chart with al available configurations please refer to load chart in operator's cab or manual seisHo 13 Load chart = fixed jib wo.0s05.x.) Offset 30° Main boom 11 m Main boom 17 m (m) + [it t (ny tft fet fe ™ t fe fe fe 93 | 192 102 | 187 3a | 236 re | 148 | os v | 15 | 20 13 | 196 | 114 2 | 131] 22 | so 2 |aas| ar | se re | 182 | 108 | 7A 2 | 125 | 78 | 57 2 | 106 | 75 | 55 | 38 19 | 159 | 100 | 6a | 45 24 74 | 55 28 72 | ss | a7 2 | 129] 96 | 65 | 43 26 71 | sa | a7 20 zo | 52 | 36 2 | 100] 91 | 61 | 40 0 67 | so | 36 4 es | 49 | a5 30 79 | 7 | ss | 38 32 48 | 35 36 65 | 43 | 34 32 71 | 78 | 57 | 38 36 4s | a4 40 46 | 33 40 sa | 53 | 35 a8 23 Pe 4s | 33 4 a7 | 34 40 32 a8 32. 46 4a | 34 2 32 “8 34 50 33 Main boom 29 m (n) efefefe ny t fete fe (™ t fe fete a1 | 226 v7 | a0 aaa | 167 14 | 191 | 108 20 | 14s | a6 20 | 14] a6 17 | 180 | 10.1 | 68 ze | 1o9 | a3 | 57 ze | 107 | 83 | 57 2 | 144] 97 | 66 | 44 2 | sa] 79 | ss | a7 2 2 | 80 | 55 | a8 2 | wa] ss | 6 | «2 ao | 74] 77 | sa | a7 ao | 72| 78 | sa | a7 2 | a5| se | 60 | 40 sz | 65] 75 | 53 | a6 x | 63 | 74 | 5s | s6 a | 67| 75 | 7 | 38 se | 50] 60 | 51 | 36 u s5| 66 | 52 | 36 ae | sa| so | ss | a7 4o | 38] a8 | ao | a5 as | aa | so | 51 | a5 40 a9 | 52 | 36 a | 33 | 43 | as | 34 a | 37 | as | so | 35 46 35 | 39 | 34 46 33 | 38 | 33 a | 27 | s6 | 4a | a6 50 32 | 34 50 25 | a0 | a3 50 24 | 29 | a3 5 27 5 21 | 26 5s 20 | 24 r35 | 163 139 | 159 ua | 155 2 | 142] a7 re | ae | 108 re | 153 2 | 92| 8 | 57 22 | 120 | 103 | 84 a | asa so | 7a} so | 55 | sz 2 | 104 | 102 | as | 67 20 | 135 a | 61] 72 | 54 | a6 2 | 90] es | a2 | 66 24 | 104 a | sal ea | sa | a6 ze | 7a| a7 | a0 | 6s 2 | 76 ss | 4s} 57 | 53 | 35 sz | so] 67 | 71 | 63 32 57 se | 40] 51 | 52 | a5 so | 44] 52 | 55 | 58 ss | 42 4 | a5| 45 | 50 | a5 4 | 33a] 40 | 42 | a6 at | 36 a | 25] 34 | 40 | 24 a | 23] 30 | a3 | 26 4 | aa 50 22 | 27 | 3a 48 21 | 26 | 27 a | 26 5 23 50 20 | 23 a | oa Capacities in mettc tons with fixed jlb (No, 0806.29, 32.5 ¢ counterweight. Above load chart is for reference only. For actual Itt duty and complete chart with all available configurations please refer to load chart in operators cab or manual 14 Heese Notes vissteHo 18 lebherr-Werk Nenzing GmbH P.O. Box 10, A-6710 Nenzing/Austria Tel: +43 50809 41-473, Fax: +43 50809 41-499, crawler crane@liebher:.com

You might also like