This document describes 10 key changes introduced in version 1.09.15 of the Government eProcurement System (GePNIC). The changes include introducing an eAgreement flow, capturing additional tender publication dates, enabling a Letter of Acceptance/Intent process, defining a new Tender Accepting Authority role, adding bid validity checks, updating bid status labels, allowing saving of draft awards of contract, enabling pre-tender integration, enhancing payment gateway APIs, and requiring OTP authentication for MIS reports.
This document describes 10 key changes introduced in version 1.09.15 of the Government eProcurement System (GePNIC). The changes include introducing an eAgreement flow, capturing additional tender publication dates, enabling a Letter of Acceptance/Intent process, defining a new Tender Accepting Authority role, adding bid validity checks, updating bid status labels, allowing saving of draft awards of contract, enabling pre-tender integration, enhancing payment gateway APIs, and requiring OTP authentication for MIS reports.
This document describes 10 key changes introduced in version 1.09.15 of the Government eProcurement System (GePNIC). The changes include introducing an eAgreement flow, capturing additional tender publication dates, enabling a Letter of Acceptance/Intent process, defining a new Tender Accepting Authority role, adding bid validity checks, updating bid status labels, allowing saving of draft awards of contract, enabling pre-tender integration, enhancing payment gateway APIs, and requiring OTP authentication for MIS reports.
Sl No Changes Description Modified By Modified Date
GePNIC_1.09.15_VersionControl Document Page 1 of 5
Originator : Sekar J Date of request: Sl No Module Description of Change
1. Tender Introduction of eAgreement :-
Management A new flow has been introduced to get the eAgreement after the Awarded of Contract from the successful bidder. Detailed manual is enclosed in Annexure-A 2. Tender Capturing Tender Publication dates in News Paper and Management Tender Bulletin:- In the present system the Tender Publication Date in the Portal is being captured. In addition to this, two more dates are being captured in this version of GePNIC under Critical Dates, the date of Publication of the Tender in Newspaper and the date of publication of the Tender in the Tender Bulletin. The Minimum/Maximum time for submission of tender document validation can be applied and the procuring entity has the option to fix dates even for duration lesser or higher than 30 days. Similarly the Minimum / Maximum date validity is applied while publishing corrigendum. These two dates (Newspaper & Bulletin publish dates) can be configured for visibility / capturing in the critical date page. Once enabled these fields are mandatory. Similarly the Min / Max validity between these two dates and the Bid Submission End date can also be configurable. 3. Tender Letter of Acceptance / Letter of Intent (LOA/LOI) :- Management To enable the LOA/LOI process, during Tender Creation in the Workitem details entry page, the department user have to choose Letter of Acceptance / Letter of Intent as “Yes” as shown below
In addition, to have the Evaluator from different Org. level
other than the Org. level of TIA, the department user has to choose “Initiate LOA from different level” as Yes. Then the system will ask the Org. hierarchy level at the end of Finance Evaluation summary and Evaluator from the selected Org.
GePNIC_1.09.15_VersionControl Document Page 2 of 5
Chain can initiate the LOA/LOI process. LOA/LOI Manual is enclosed in Annexure-B. Once the LOA/LOI is enabled, the tendering process of LOA/LOI is mandatory. There is no corrigendum to skip the process. 4. Tender Tender Accepting Authority (TAA):- Management Currently in GePNIC Evaluator is given the rights provide AOC. In the new version of GePNIC, one new role “Tender Accepting Authority” is being introduced. All the existing users with Evaluator Roles will be assigned the role of Tender Accepting Authority (TAA) by the System. Only the users with the TAA privilege can access the AOC process and AOC eAgreement Process. Departments who require separate role for AOC, Nodal Officer can reassign the role through user transfer menu. 5. Tender Bid Validity:- Management In the present version of GePNIC, the bid validity (no. of days) is being captured without any further checking. Whereas in the new version the Bid Validity is being checked as follows: The validity of the bid is being counted from the Technical Bid Opening Date. Before the end of the Bid Validity period, reminder mails would be sent to tender creator and accepted bidders, if a tender has not been concluded and Bid validity of the validity is about to expire in the next 10 days and 2 days. 6. Tender New Labels Admitted / Not Admitted:- Management In the present system after the Technical / Financial opening of the bids, the system has the provision to “Accept” / “Reject” the bidder and the Accept / Reject status is being sent through mail / sms to the bidders. To remove the ambiguity in the label “Accept / Reject”, in the new version the labels “Admitted” / “Not Admitted” is being introduced at the Technical / Financial Opening stage. Whereas the labels “Accepted” / “Rejected” is being retained in the Technical / Financial Evaluation stage. The sample mail will be as follows:
GePNIC_1.09.15_VersionControl Document Page 3 of 5
And the SMS will be as follows:
7. Tender Save as Draft in AOC stage:-
Management When the number of eligible bidders for AoC is more, then there is difficulty in selecting the bidders (Accept / Reject) at a single stretch and proceeding to the AoC page. To avoid this, in the new version, selection of bidders for award of Contract (AoC) has been placed in a separate page and option to Save the AoC as Draft has been introduced. Using this feature Department user can save partially the accepted and rejected bidders and continue after saving. 8. Tender Pre Tender Integration as a Service:- Management As the requirement of integration the GePNIC with the SAP / Internal system of the Organisations is increasing, in the new version, a new configurable parameter is being introduced for enabling Pre-Tender Integration against the Organization Chain. The Procedure to be followed is as follows: The Pre- Tender Integration has to be enabled by the Application Admin for the Org Chain and the same intimated to the Nodal Officer. The Nodal officer has to enter the Officer-in-Charge details in a form along with the relevant certificate and URL. The App Admin has the privilege to approve the above request and the Pre-Tender Integration can be used against the Org. Chain.
9. Payment Gateway Enhancement in Refund / Settlement Webservices :
As per the requirement of Axis Bank, enhancements were done in the Refund / Settlement Status Data consumption webservices and EoD web services. (Applicable only for Axis Bank PG integrated Portals). 10. Reports OTP to access MIS Report Portal:- To access the MIS report, apart from the present login credentials, second level of authentication ie Mobile OTP authentication has been introduced. On validating the UserID
GePNIC_1.09.15_VersionControl Document Page 4 of 5
and Password the system will generate a OTP the same will be sent to the department user mobile number. Only after validating the mobile OTP the system will allow the department user to login to the MIS Portal. 11. Reports Categorywise Tender Statistical Report:- A new report added in the Tender Statistical Report Menu -> “Tender Categorywise” in the MIS Portal. This reports facilitates the details of Organisation Name / Org. Type / Number of Tenders and Value of tenders published under Goods / Works / Services and Total. Sample report
12. Reports Newly introduced Tender Publication dates in Newspaper
and Tender bulletin has been added in Tender Discursive report and Tender Details Excel report 13. Reports Provision to generate and download eAgreement content in word format available in a menu called AOC eAgreement Download. 14. Reports New fields introduced in the application have also been incorporated in relevant reports.
x-x-x-x
GePNIC_1.09.15_VersionControl Document Page 5 of 5