You are on page 1of 1
Logs tlnsiecd aa eared STANCHION POST TO SUPPORT ATTACHMENT BRACKET ARCHITECT / ENGINEER (SEE NOTES) CLOSED EYEBOLT ASSEMBLY (SEE NOTES TENDON LOOP AND OVAL jj ‘STYROFOAM INSULATION HYDRODRAIN 300 TENDON STOP ASSEMBLY LITETOP GROWING MEDIA (SEE NOTES) I WATERPROOFING / ROOFING DETALS FOR SUED AND SPACING BY PROJEOT ARCHITECT ENGINEER ¢ EMBEDDED OR BOLTED INTO DECK AS DESIGNED BY g SySTEMPITER PROJECT ARCHITECT / ENGINEER. 2 EROSION CONTROL CONTINUOUS, PERFORATED ATTACHMENT BRACKET Q oN corre TUBE OR ANGLE AS DESIGNED BY PROIECT nm Qf I 1OO"U NiIQVS =I Alawassv “DUI ‘HI3.LO804OH Ub IHSaW NOTES: 1, EYEBOLT ASSEMBLY PULL OUT STRENGTH AND METHOD OF ATTACHMENT TO STRUCTURE MUST BE DETERMINED AND VERIFIED BY PROJECT ARCHITECT / ENGINE 2. PRIOR TO SHIPPING GARDNET MATERIALS, PROJECT ARCHITECT / ENGINEER MUST PROVIDE HYDROTECH A SIGNED AND SEALED CONSTRUCTION DETAIL INDICATING. 7 GARDNET ATTACHMENT TO BUILDING STRUCTURE. Hy 3. IF STYROFOAM INSULATION IS NOT INSTALLED, HYDRODRAIN 302 SHALL BE PLACED ON TOP OF THE HYDROFLEX RB I Re 4, NUMBER OF STOPS AND NUMBER AND LENGTH OF REQUIRED TENDONS IS DETERMINED. i= GARDNET CELL BY MEDIA DEPTH AND DEGREE & LENGTH OF SLOPE. AL ‘WALL POLY WASHER IK 5, LITETOP GROWING MEDIA IS REQUIRED FOR ALL GARDNET INSTALLATIONS. NO tS ST.STL. WASHER OZ0Z/L/8 “ALVG SNON ‘31vOS OIG JOON OL G3aL108 SUBSTITUTIONS ARE ALLOWED. TENDON STOP 6. UPPER LAYER OF GARDNET CELLS MUST BE OVERFILLED WITH LITETOP MEDIA BY 11 ST. STL TENDON 7. GARDMAT EROSION MAT SHALL BE INSTALLED WHEN PLANTING PLUGS. NO GARDMATIS_/ CABLE REQUIRED WHEN INSTALLING INSTAGREEN CARPET, TILE OR LAWN SOD. t TENDON STOP DETAIL 2 of 2x Z2 3 8 gf on zo 39 5 9 z Pa ar 3o za 2m 8 zo 3a) 20 3m 34 a A

You might also like