Professional Documents
Culture Documents
THIS IS TO INFORM CENTRAL MARE INC . THAT I , SAMBITAN ,LEONARD PAUL G. OUT-GOING SECOND OFFICER OF MT STENAWECO EVOLUTION
HANDED OVER MY DUTIES AND RESPONSIBILITIES TO THE IN-COMING SECOND OFFICER RAMON ARBOLADURA
AT THE PORT OF BARCELONA, SPAIN DATED 23 DEC. 2015.
NOON REPORT
1. UPDATE NOON POSITION FOR "DANAOS"
2. STENA REPORTER (as per MASTER INSTRUCTION)
3. DMI POSITION REPORT
AT ANCHORAGE OR BERTH
1. PREPARE NOON REPORT FOR "DANAOS"
2. . STENA REPORTER (as per MASTER INSTRUCTION)
DURING ARRIVAL AND DEPARTURE FROM PORT
1. NAV16a - SHIP/SHORE PILOT-MASTER EXCHANGE
2. NAV16b - PILOTAGE CHECKLIST
3. NAV16c - PILOT CARD
4. NAV16d - MOORING PLAN (for berthing only)
NOTE :
- WEEKLY CORRECTIONS FOR ECDIS, ADP AND ENP ARE REQUESTED AND APPLIED EVERY THURSDAY. EACH ECDIS AND ADP HAS IT'S OWN USB AND ARE LABELED
WITH THEIR SPECIFIC NUMBER.
- ENP CORRECTIONS IS REQUESTED BY SAVING THE FILE IN "COMMON FOLDER", "WEEKLY UPDATES", "ENP" AND CAN BE UPDATED IN BRIDGE COMPUTER..
- ADP CORRECTIONS CAN BE REQUESTED AND APPLIED IN "EMERGENCY COMPUTER" IN THE BRIDGE..
- LATEST NM RECEIVED IS WK 53 / 15 , ENP WK 52/ 15
- SEE SEPARATE PRINT OUTS FOR INSTRUCTIONS OF EnP,ADP AND ECDIS WEEKLY CORRECTIONS
- MAINTENANCE, WEEKLY AND MONTHLY INSPECTIONS OF LIFE SAVING APPLIANCES
- FILL UP THE FORM ENV04 QUARTERLY, UPDATED TILL HUELVA TO BARCELONA VOYAGE (COMMON FOLDER)
- FOR ANY ADDITIONAL QUESTIONS REGARDING EQUIPMENTS AND FORMS 3/O DARWIN CAN ASSIST YOU.
- PLASE REFER TO EQUIPMENTS MANUAL FOR OPERATIONS OF EQUIPMENTS IN THE BRIDGE
MONTHLY DOCUMENTS
6 MONTHLY DOCUMENTS
- INSP16 - NAV ELECTRONIC EQUIPMENT REPORT